Other files
| File |
Type |
Posted |
| 697DCK-25-R-00354 Amendment 07.pdf |
PDF |
|
| PPQ for ZMP Project.pdf |
PDF |
|
| 697DCK-25-R-00354_Amendment 06.pdf |
PDF |
|
| J-16_QA for ZMP Multiple Project_Final_7.31.2025.pdf |
PDF |
|
| Concrete Curb Photos.pdf |
PDF |
|
| 697DCK-25-R-00354 Amendment 05.pdf |
PDF |
|
| Exterior Stairs and Concrete Work.pdf |
PDF |
|
| Tower lights.pdf |
PDF |
|
| Epoxy Floor in Bolier Room.pdf |
PDF |
|
| Exterior Doors.pdf |
PDF |
|
| 697DCK-25-R-00354 Amendment 04.pdf |
PDF |
|
| J-16_QA for ZMP Multiple Project_15 July_Solo.pdf |
PDF |
|
| 697DCK-25-R-00354_Amendment 03.pdf |
PDF |
|
| 697DCK-25-R-00354 Amendment 02.pdf |
PDF |
|
| J-17_Excerpt_ZMP_RCLR_ID01922_Tower Assessment Report_2024_DNC.pdf |
PDF |
|
| J-16_Q and A for ZMP Multiple Project.pdf |
PDF |
|
| J-15 Price proposal spreadsheet r.xlsx |
XLSX spreadsheet |
|
| J-12 FAA-C-1217H Chg 2.pdf |
PDF |
|
| J-10_Scope of Work_Exterior Concrete Work.pdf |
PDF |
|
| J-8b_ZMP Panel Replace Drawings Binder1.pdf |
PDF |
|
| J-4a_ZMP-04202024 GAS UNIT HEATER REPLACEMENT SPECS.pdf |
PDF |
|
| J-1b_Chilled Water Valve Replacement Drawings.pdf |
PDF |
|
| J-13_Hazardous Energy Standard Procedure.pdf |
PDF |
|
| J-9e_ZMP Boiler EOSH Impacts.pdf |
PDF |
|
| J-5_Scope of Work_380 Steam Humidifier.pdf |
PDF |
|
| J-14_DOL WD MN20250053 5 2 25.pdf |
PDF |
|
| J-9d_ZMP Boiler Drawing zmp-msp-e-5896-a02r Bid Option.pdf |
PDF |
|
| J-9b_ZMP Boiler Vent Stack Replacement Specifications.pdf |
PDF |
|
| J-8c_ZMP Power Panel EOSH Impacts.pdf |
PDF |
|
| J-8a_ZMP Panel Replace Specs.pdf |
PDF |
|
| J-6b ZMP AHU 12 and 13 Humidifier Replacement Drawings.pdf |
PDF |
|
| J-2_Scope of Work_Epoxy Floor.pdf |
PDF |
|
| 697DCK-25-R-00354_Final.pdf |
PDF |
|
| J-11 FAA-STD-019G.pdf |
PDF |
|
| J-9c_ZMP Boiler Drawing zmp-1203733-m001 Rev A.pdf |
PDF |
|
| J-9a_ZMP Boiler Scope of Work.pdf |
PDF |
|
| J-7_ZMP NASET Obstruction Lights SOW.pdf |
PDF |
|
| J-6c ZMP AHU 13 and 13 Humidifier Replace EOSH Impacts.pdf |
PDF |
|
| J-6a_ZMP AHU 12 and 13 Humidifier Replacement Spec.pdf |
PDF |
|
| J-4c_ZMP Gas Unit Heater EOSH Impacts.pdf |
PDF |
|
| J-4b_ZMP Gas Unit Heater Replacement Drawings (3).pdf |
PDF |
|
| J-3_Scope of Work_Exterior Doors.pdf |
PDF |
|
| J-1c_EOSH Impacts Chilled Water Valve Replace.pdf |
PDF |
|
| J-1a_Chilled Water Valve Replacement Project Spec.pdf |
PDF |
|
Show all 44
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it.
Updated .