J-4b_ZMP Gas Unit Heater Replacement Drawings (3).pdf

PDF 362 KB Posted

Attached to
Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN
Solicitation number
697DCK-25-R-00354
Issued by

About this file

These are architectural engineering drawings for a gas unit heater replacement project at the FAA Air Route Traffic Control Center in Farmington, Minnesota. The technical drawings detail the ground floor plan of the Power Service Building and Garage, showing the locations and specifications for ten new gas-fired unit heaters to be installed across multiple rooms including the Generator Room, Workshop, and other spaces. The drawings include a detailed Heater Schedule specifying technical parameters such as heating input/output, electrical requirements, motor data, and weight for each unit. Accompanying notes outline specific installation requirements, including reconnecting gas and electrical systems, providing new flue gas vent pipes, supporting heaters from ceiling structural steel, and ensuring proper sealing and coordination with existing infrastructure.

View the file

Other files

File Type Posted
697DCK-25-R-00354 Amendment 07.pdf PDF
PPQ for ZMP Project.pdf PDF
697DCK-25-R-00354_Amendment 06.pdf PDF
J-16_QA for ZMP Multiple Project_Final_7.31.2025.pdf PDF
Tower lights.pdf PDF
Epoxy Floor in Bolier Room.pdf PDF
Concrete Curb Photos.pdf PDF
697DCK-25-R-00354 Amendment 05.pdf PDF
Exterior Stairs and Concrete Work.pdf PDF
Exterior Doors.pdf PDF
697DCK-25-R-00354 Amendment 04.pdf PDF
J-16_QA for ZMP Multiple Project_15 July_Solo.pdf PDF
697DCK-25-R-00354_Amendment 03.pdf PDF
697DCK-25-R-00354 Amendment 02.pdf PDF
J-17_Excerpt_ZMP_RCLR_ID01922_Tower Assessment Report_2024_DNC.pdf PDF
J-16_Q and A for ZMP Multiple Project.pdf PDF
697DCK-25-R-00354_Amendment 01.pdf PDF
J-13_Hazardous Energy Standard Procedure.pdf PDF
J-9e_ZMP Boiler EOSH Impacts.pdf PDF
J-5_Scope of Work_380 Steam Humidifier.pdf PDF
J-14_DOL WD MN20250053 5 2 25.pdf PDF
J-9d_ZMP Boiler Drawing zmp-msp-e-5896-a02r Bid Option.pdf PDF
J-9b_ZMP Boiler Vent Stack Replacement Specifications.pdf PDF
J-8c_ZMP Power Panel EOSH Impacts.pdf PDF
J-8a_ZMP Panel Replace Specs.pdf PDF
J-6b ZMP AHU 12 and 13 Humidifier Replacement Drawings.pdf PDF
J-2_Scope of Work_Epoxy Floor.pdf PDF
697DCK-25-R-00354_Final.pdf PDF
J-15 Price proposal spreadsheet r.xlsx XLSX spreadsheet
J-12 FAA-C-1217H Chg 2.pdf PDF
J-10_Scope of Work_Exterior Concrete Work.pdf PDF
J-8b_ZMP Panel Replace Drawings Binder1.pdf PDF
J-4a_ZMP-04202024 GAS UNIT HEATER REPLACEMENT SPECS.pdf PDF
J-1b_Chilled Water Valve Replacement Drawings.pdf PDF
J-11 FAA-STD-019G.pdf PDF
J-9c_ZMP Boiler Drawing zmp-1203733-m001 Rev A.pdf PDF
J-9a_ZMP Boiler Scope of Work.pdf PDF
J-7_ZMP NASET Obstruction Lights SOW.pdf PDF
J-6c ZMP AHU 13 and 13 Humidifier Replace EOSH Impacts.pdf PDF
J-6a_ZMP AHU 12 and 13 Humidifier Replacement Spec.pdf PDF
J-4c_ZMP Gas Unit Heater EOSH Impacts.pdf PDF
J-3_Scope of Work_Exterior Doors.pdf PDF
J-1c_EOSH Impacts Chilled Water Valve Replace.pdf PDF
J-1a_Chilled Water Valve Replacement Project Spec.pdf PDF
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

H

G

F

E

D

C

B

A

0--

N

I n

EXISTING

2" GAS SUPPLY

SEALANT� ·�--��,...........��

RED DEVEL 081 6/01 "-.

AS REQ'D BY LOCAL �

CODES MIN 3'-0" --.=r 12"

(MIN)

2"

19' -4 1/4"

GUH-4

D �

O'.'. w D Oz f---- -<i: (_') O'.'. z ww z w

I

I I

I I 23' -9 1/4"

EXISTING

2" GAS SUPPLY

D N

O'.'. w D Oz f---- -

Cf®

ROOM

<i: (_') O'.'.

z GENERATOR

W W z w

EXISTING GUH-5

2" GAS SUPPLY

D n

O'.'. w oz f---- - <i: (_') O'.'.

z

W W z w

24' -6"

EXISTING

GAS SUPPLY

D

D

GUHt2

D ,tj-

O'.'. w Oz D f---- - <i: (_') O'.'.

z

W W z w

25' -10"

EXISTING

GAS SUPPLY

GUH-1

I f

OFFICE

HALL GAS

r=====:':;==f'l �..,..,.,.=-=' CONNECTION

WORKSHOP

SEE DETAIL

TYP.

PARTIAL POWER SERVICE BUILDING - HEATING GROUND FLOOR PLAN

----FLUE CAP

2"

MIN 18 GAUGE

CARBON STEEL

SEE PLAINS FOR SIZE

10 GAUGE VENTILATED

ROOF SLEEVE

MAX SNOW DEPTH • 16"

SCALE: 1/8" • 1'-0"

INSULATION

ROOF CONSTRUCTION ��:::::;a, SUPPORTS ON (4) SIDES �

LEGEND:

.5 DIA

(6" MIN)

FLUE THRU ROOF

NTS

MARK LOCATION SERVICE

GUH-1 GENERATOR GENERATOR

9"

(MIN)

ST ACK DIAMETER

DIA

� REF

-2 M16

HEATING HEATING

INPUT, MBH OUTPUT, MBH

GUH-2 ROOMS ROOM 1 04 , 1 05 125 100 GUH-3 104,105 EQUIPMENT

GUH-4

GUH-5

GAS FIRED UNIT

PROPELLER FAN DATA

CFM MOTOR RPM MOTOR HP

1980 1625 1 /8

1, PROVIDE HEATERS WITH ALL CEILING WALL MOUNTING ADAPTERS AND ACCESSORIES AS REQUIRED, 2, PROVIDE HEATERS WITH TWO STAGE GAS VALVE, NEW WALL MOUNTED THERMOSTATS.

7 6

HEATER SCHEDULE

AIR TEMP. MAX HEAT ELECTRICAL/MOTOR DATA WEIGHT BASED NOTES RI SE ( DEG F J THROW (FTJ VOLTS PHASE Hz ( LBS J ON

MODINE

47 56 120 1 60 125 MODEL 1 , 2

HD125

5 4

MIN

WING

ONTRO

WING .___�

AUTO

WING

POWER SERVICE BLDG

GENERAL NOTES:

1) ALL WORK, MATERIAL AND INSTALLATION SHALL CONFORM TO THE

REQUIREMENTS OF THE ORDINANCE AND CODE HAVING JURISDICTION.

2l ALL WORK SHALL BE IN ACCORDANCE WITH THE PROJECT SPECIFICATION.

3) ALL WORK SHALL BE PERFORMED IN A NEAT, ACCURATE, WORKMAN-LIKE

AND PROFESSIONAL MANNER.

4) CONTRACTOR SHALL VERIFY ALL DEMOLITION WORK, EXISTING CONDITIONS,

DIMENSIONS ANO NEW INSTALLATION PRIOR TO COMMENCEMENT OF WORK.

5) CONTRACTOR SHALL BE RESPONSIBLE FOR THE COMPLETE INTERLOCK

CONTROL WIRING REQUIRED FOR PROPER SYSTEM OPERATION.

6) CONTRACTOR SHALL COORDINATE AND SCHEDULE ALL DEMOLITION 8c

NEW CONSTRUCTION WORK WITH FM COR TO MINIMIZE OPERATION

DISRUPTIONS WHILE WORK IS IN PROGRESS.

NEW WORK NOTES:

A FURNISH ANO INST ALL NEW GAS FIRED UNIT HEATERS. RECONNECT PIPING, ELECTRICAL

'\Y' WIRING. PROVIDE ALL REQUIRED CONTROL FOR A COMPLETE FUNCTIONAL SYSTEM.

A PROVIDE NEW FLUE GAS VENT PIPE FROM HEATER EXHAUST. PROVIDE TRANSITION OR

"¢' ADAPTOR AS REQUIRED FROM 4" PIPE TO 6" VENT. EXTEND VENT TO ROOF ANO SEAL

JOINTS PROPERLY FOR PREVENTING LEAKAGE. REFER TO DETAIL 13/M18-2 AND ROOF

MANUFACTURER FOR PROPER FLASHING AROUND VENT.

A\. PROVIDE NEW 1/2" GAS LINE FROM GAS MAIN SUPPLY LINE TO INLET HEATER. INSTALLATION '.;7 OF DIRT LEG SHALL BE PER DETAIL 1. PROVIDE NEW GAS VALVE, UNION AND BALL SHUTOFF

VAL VE. REPAINT NEW GAS LINE WITH YELLOW COLOR TO MATCH EXISTING.

� SUPPORT UNIT HEATER FROM CEILING STRUCTURAL STEEL. PROVIDE NEW ROOS,

'v"' SWAY BRACES ANO ACCESSORIES. MODIFY EXISTING SUPPORTS, HANGERS AS REQUIRED.

� RE-USE EXISTING ELECTRICAL POWER SOURCE. PROVIDE NEW ELECTRICAL WIRING, CABLES

'.;7 AND CONTROL AS REQUIRED.

� PROVIDE NEW ELECTRICAL DISCONNECT TO EACH UNIT INSTALLED AND NEW WIRING FROM

"&' DISCONNECT TO UNIT

A. RECONNECT GAS FLUE VENT PIPING TO EACH UNIT INSTALLED. PROVIDE TRANSISTION OR

'.1/ ADAPTOR AS REQUIRED FROM 4" TO 6" VENT. IF SIGNS OF CORROSION EXIST REPLACE

FLUE. COROINATE WITH COR.

LEGEND

REV

--11..-

APPROVED

DATE

8c ABBREVIATIONS:

POINT OF CONTACT BETWEEN

EXISTING AND NEW WORK

EXISTING WORK

NEW/MODIFIED WORK

SHUTOFF VAL VE <BALL>

UNION

GAS VALVE

DESCRIPTION JCN

DEPARTMENT OF TRANSPORTATION

FEDERAL AVIATION ADMINISTRATION

REDLINE

DATE

H

G

F

E

D

C

APVD

ATO - TECHNICAL OPERATIONS CENTRAL SERVICE AREA �

ARTCC

POWER SERVICE BUILDING

UNIT HEATER REPLACEMENT

WHITE ENGINE GENERATOR ROOM

PLAN

l&J

� ,µ□

I 2J GARAGE

FARMINGTON MN

C �� E

PROJECT ENGINEER

DESIGNED

KEY PLAIN IRS

DRAWN

Vf,C

CHECKED

XXX

3 2

ISSUED BY

ENGINEERING SERVICES

ENROUTE/FSS

MGR: ENGINEERING

DATE

04/20/2024

JCN

DRAWING NO

ZMP-D-ARTCC-M038

REV

A� w

THIS DRAWING PRODUCED ON THE AGL REGION MICROST ATION SYSTEM

ZMP-GL-D-ARTCC-D009
ZMP-GL-D-ARTCC-M038
ZMP-GL-D-ARTCC-M039

File details come from the government source that posted it. Updated .