J-17_Excerpt_ZMP_RCLR_ID01922_Tower Assessment Report_2024_DNC.pdf

PDF 623 KB Posted

Attached to
Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN
Solicitation number
697DCK-25-R-00354
Issued by

About this file

This document is a National NASET Assessment Program Structural Assessment Report for a Federal Aviation Administration (FAA) tower located in Farmington, Minnesota. The assessment, conducted on 07/25/2024, reveals critical and moderate findings for a self-supporting, coated steel-galvanized tower with a height of 205 feet, constructed in 1989.

Key findings include two critical structural issues: a cracked/broken diagonal brace angle on face C at 170 ft and bent internal bracing at the tower's center section. A moderate finding involves the existing Ladder Safety System (LSS), which is a non-MSA Dyna-Glide system that does not meet FAA approval. The report recommends removing and replacing defective structural members, restricting tower access to Level 2 climbers, and replacing the current LSS with an MSA Dyna-Glide LSS. The tower's structural condition is rated as "Poor", and the next assessment is scheduled for 07/25/2029.

View the file

Other files

File Type Posted
697DCK-25-R-00354 Amendment 07.pdf PDF
PPQ for ZMP Project.pdf PDF
697DCK-25-R-00354_Amendment 06.pdf PDF
J-16_QA for ZMP Multiple Project_Final_7.31.2025.pdf PDF
Epoxy Floor in Bolier Room.pdf PDF
Exterior Stairs and Concrete Work.pdf PDF
Concrete Curb Photos.pdf PDF
Tower lights.pdf PDF
697DCK-25-R-00354 Amendment 05.pdf PDF
Exterior Doors.pdf PDF
697DCK-25-R-00354 Amendment 04.pdf PDF
J-16_QA for ZMP Multiple Project_15 July_Solo.pdf PDF
697DCK-25-R-00354_Amendment 03.pdf PDF
697DCK-25-R-00354 Amendment 02.pdf PDF
J-16_Q and A for ZMP Multiple Project.pdf PDF
697DCK-25-R-00354_Amendment 01.pdf PDF
697DCK-25-R-00354_Final.pdf PDF
J-9d_ZMP Boiler Drawing zmp-msp-e-5896-a02r Bid Option.pdf PDF
J-14_DOL WD MN20250053 5 2 25.pdf PDF
J-11 FAA-STD-019G.pdf PDF
J-5_Scope of Work_380 Steam Humidifier.pdf PDF
J-13_Hazardous Energy Standard Procedure.pdf PDF
J-1b_Chilled Water Valve Replacement Drawings.pdf PDF
J-7_ZMP NASET Obstruction Lights SOW.pdf PDF
J-6c ZMP AHU 13 and 13 Humidifier Replace EOSH Impacts.pdf PDF
J-3_Scope of Work_Exterior Doors.pdf PDF
J-9a_ZMP Boiler Scope of Work.pdf PDF
J-8b_ZMP Panel Replace Drawings Binder1.pdf PDF
J-9e_ZMP Boiler EOSH Impacts.pdf PDF
J-10_Scope of Work_Exterior Concrete Work.pdf PDF
J-15 Price proposal spreadsheet r.xlsx XLSX spreadsheet
J-12 FAA-C-1217H Chg 2.pdf PDF
J-1c_EOSH Impacts Chilled Water Valve Replace.pdf PDF
J-4c_ZMP Gas Unit Heater EOSH Impacts.pdf PDF
J-4b_ZMP Gas Unit Heater Replacement Drawings (3).pdf PDF
J-9c_ZMP Boiler Drawing zmp-1203733-m001 Rev A.pdf PDF
J-1a_Chilled Water Valve Replacement Project Spec.pdf PDF
J-6a_ZMP AHU 12 and 13 Humidifier Replacement Spec.pdf PDF
J-4a_ZMP-04202024 GAS UNIT HEATER REPLACEMENT SPECS.pdf PDF
J-8c_ZMP Power Panel EOSH Impacts.pdf PDF
J-9b_ZMP Boiler Vent Stack Replacement Specifications.pdf PDF
J-8a_ZMP Panel Replace Specs.pdf PDF
J-2_Scope of Work_Epoxy Floor.pdf PDF
J-6b ZMP AHU 12 and 13 Humidifier Replacement Drawings.pdf PDF
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

National NASET Assessment Program Structural Assessment Report

Assessment Date: ___________

Prepared for : Unstaffed Infrastructure Sustainment Program Office

Version Date: July 16, 2024

Federal Aviation Administration

Revision/Change Record

Section Modified on Author Changes/Reason

Make selections to customize form (unused sections will be removed)

Tower Type (configuration) Material Platform Fixed Ladder

Stairway Antennas, Mounts and Cables Lightning Protection

Note to Assessor:

If wrong selection is made, you must start over with a new template.

The use of the PDF Edit Feature is prohibited.

1.3 SUMMARY OF FINDINGS AND RECOMMENDATIONS

Critical Findings - Critical Finding is defined as one or more of the following:

a) Tower is declared “Do Not Climb”

b) High risk to public safety such as collapsing tower into public area

c) High risk of loss of facility service

# Category Description Recommendations Photo Number or N/A

1.3 SUMMARY OF FINDINGS AND RECOMMENDATIONS

Moderate Findings

# Category Description Recommendations

Photo Number or N/A

2.0 TOWER ASSESSMENT FORMS

2.0.1 UIS AD SUMMARY

LOC ID

Material Primary Facility

Tower Height (ft) Tower Shape

Year Constructed

Leased Tower?

Yes No

Structural Condition

SSC

Anchor Replacement Year (YYYY)

City

Assessment Date State

District

Recommended Restrictions

# Critical Exceptions As-found overall plumb ratio

0.0025

As-found overall twist (degrees)

Relative Baseplate Elevation (+/- feet)

Baseplate A Baseplate B Baseplate C

Baseplate D

There were no items observed that would prevent a climber from safely accessing and climbing the Tower.

It is recommended that the Ladder Safety System not be used and access to the tower be limited to Authorized Person Level II Climber Only.

It is recommended that access to the tower be limited to windspeeds below mph.

It is recommended that the tower be off limits to climbing. See recommended actions in the following sections.

Structure ID (Unique Number)

Description +

Tower Type (Configuration)

Tower Access

# Moderate Exception Overall plumb Ratio after adjustments

Overall twist after adjustments (degrees)

# Minor Exceptions

Tower # or Stationing

Target maximum plumb ratio

Target Overall maximum twist (degrees)

Co-located Facility #1

Co-located Facility #2

Co-located Facility #3

Co-located Facility #4 Co-located Facility #5 Co-located Facility #6

Co-located Facility #7

Co-located Facility #8

Service Area

0.005 for monopoles

(MM/DD/YYYY)

(MM/DD/YYYY)Proposed Next Assessment Date

CORROSION DESCRIPTION REFERENCES

Please describe the severity of rust/corrosion on any tower component in terms of degree: 1st, 2nd or 3rd, and in terms of importance: priority 1, priority 2 or priority 3. The criteria for these are as follows:

1st Degree:

2nd Degree:

3rd Degree:

light surface corrosion exhibiting a chalky discoloration of the substrate moderate corrosion with evidence of pitting and breakdown of the galvanized coating material severe corrosion causing flaking and deformity of the substrate with loss of protective coating.

Critical:

Moderate:

2nd or 3rd degree of corrosion on component that may have immediate impact on structural integrity or personal safety.

2nd or 3rd degree of corrosion that does not impose an immediate concern, but should be corrected when possible.

Minor: 1st or 2nd degree of corrosion that is wide spread or that affect minor components that can be easily replaced.

> PLATFORM PART LOCATION REFERENCES

Locations referred to in the survey report are interpreted as follows:

> Reference "A" will start with the northernmost Leg or Face. Faces and Legs are labeled with Face first, then leg, i.e. Face A then Leg A.

Rest to follow suit in a clockwise manner.

> Platform sections will be numbered starting with one at first complete section closest to ground. Label any half sections at the foundation level as "O".

> Section panels shall be numbered starting with one at lowest elevation.

> Braces shall be label according to their location, i.e. top right, top left, bottom right, bottom left.

NORTH

FACE A

LEG D LEGA

FACED FACE 8

LEGC LEG 8

FACEC

2.0.24 LADDER SAFETY SYSTEM (LSS)

# Description (See JO 3900-63 for additional information) Yes No 📷

Is an LSS present?

Comments:

Is the LSS manufacturer MSA Dyna-Glide?

Comments:

Does the LSS start between 30” and 48” above grade?

Comments:

Does the LSS extend at least 42” above the platform?

Comments:

N/A

Is a pivot davit present? If Yes, provide condition and functionality. If No, recommend that one be installed.

Comments:

6 Additional Comments:

facility_ident_type_id: ZMP RCLR Tower ID 01922
facility_city_state: Farmington, Minnesota
prepared_dt: 07/25/2024
facility_photo:
revision_record:
section_0:
modify_0:
author_0:
reason_0:
section_1:
modify_1:
author_1:
reason_1:
section_2:
modify_2:
author_2:
reason_2:
section_3:
modify_3:
author_3:
reason_3:
section_4:
modify_4:
author_4:
reason_4:
tower_type_selection: [2]
material_type_selection: [Coated Steel-Galvanized]
platform_selection: [No]
fixed_ladder_selection: [Yes]
assessment:
material_type_other_1:
tower_number: 01922
name: [Tower]
number: [1]
stationing:
colocated_facility:
0:
1:
2:
3:
4:
5:
6:
7:
tower_type: Self-Supporting
loc_id: ZMP
material_type: Coated Steel - Galvanized
primary_facility: RCLR
material_type_other:
tower_height: 205
tower_shape: [Square Pyramid Base w/ Shaft Top]
year_constructed: 1989
leased_tower_q: N
structural_condition: [Poor]
ssc: Minneapolis ARTCC
anchor_replacement_dt:
anchor_replacement_chk_na: Off
anchor_replacement_lbl_na: N/A
city: Farmington
assessment_dt: 07/25/2024
state: [Minnesota]
next_assessment_dt: 7/25/2029
district: Minneapolis
service_area: [1]
access_restriction_0: Off
access_restriction_1: Off
access_restriction_2: Off
windspeeds:
access_restriction_3: Yes
plumb_ratio: 0.0008
plumb_adjustments: 0.0008
twist_degrees: -0.6659
twist_adjustments: -0.6659
baseplate_a: 3.3359
baseplate_b: 3.3593
baseplate_c: 3.3511
baseplate_d: 3.3521
stairway_selection: [No]
antennas_mounts_coaxial_cables_selection: [Yes]
lightning_protection_selection: [Yes]
critical_category:
0: STRUCTURAL MEMBERS AND CONNECTIONS - METAL
1: STRUCTURAL MEMBERS AND CONNECTIONS - METAL
2:
3:
4:
critical_description:
0: Tower diagonal brace angle is cracked/broken on face C at 170 ft.
1: Tower internal bracing is bent at the center of the tower, at section 11.
2:
3:
4:
critical_recommend:
0: Post DNC sign. Remove defective member and replace as soon as possible with the same member size, shape, length, and protecting coating. Follow established procedures for removal of structural members.
1: Post DNC sign. Remove defective member and replace as soon as possible with the same member size, shape, length, and protecting coating. Follow established procedures for removal of structural members.
2:
3:
4:
critical_photo:
0: 7
1: 8
2:
3:
4:
moderate_category:
0: LADDER SAFETY SYSTEM (LSS)
1:
2:
3:
4:
5:
6:
7:
8:
9:
moderate_description:
0: LSS is not FAA-approved.
1:
2:
3:
4:
5:
6:
7:
8:
9:
moderate_recommend:
0: Replace with MSA Dyna-Glide LSS. Restrict to Level 2 climbers until replacement.
1:
2:
3:
4:
5:
6:
7:
8:
9:
moderate_photo:
0: 9
1:
2:
3:
4:
5:
6:
7:
8:
9:
critical_number: 2
moderate_number: 1
minor_number: 28
lss:
question_1: Y
photo_1: 9
comment_1: [Existing LSS is Turris RAM Rail and is not a MSA Dyna-Glide LSS. ]
question_2: N
photo_2: 9
comment_2: [Minor – LSS is a non-MSA Dyna-Glide LSS.]
question_3: Y
photo_3:
comment_3: [LSS start height measures at 33".]
question_4: NA
photo_4:
comment_4: [ ]
question_5: N
photo_5: N/A
comment_5: Pivot davit is absent. No action is required.
additional_notes:

btn_attach_pdf_6:

File details come from the government source that posted it. Updated .