PPQ for ZMP Project.pdf
PDF 193 KB Posted
- Attached to
- Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN
- Solicitation number
- 697DCK-25-R-00354
About this file
The Performance Questionnaire is a standardized form for evaluating a contractor's past performance across seven key assessment areas: quality of products/services, performance, technical requirements, schedule adherence, cost control, customer satisfaction, and overall performance. The document is designed to support a source selection process for the Federal Aviation Administration (FAA), with evaluators rating contractor performance using a scale ranging from Exceptional (EX) to Unsatisfactory (US), including options for Very Good (VG), Satisfactory (S), Marginal (MG), and Not Observed (N/O).
The questionnaire is specifically related to a solicitation (No. 697DCK-25-R-00354) for multiple projects at the Air Route Traffic Control Center in Minneapolis, Minnesota, involving tasks such as replacing exterior doors, resurfacing concrete floors, removing and replacing epoxy flooring, and modifying lighting systems. The solicitation follows a Lowest Priced Technically Acceptable (LPTA) award methodology, with proposals originally due by July 31, 2025, but subsequently amended to August 8, 2025, at noon Central Time. Two site visits were offered (July 9 and July 28, 2025), and multiple amendments have been issued to adjust project scope, release Q&A documents, and provide additional site visit information.
View the file
Other files
Show all 44
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE QUESTIONNAIRE
Your assistance is requested in support of a source selection
TO BE COMPLETED BY OFFEROR
1. CONTRACTOR NAME & ADDRESS: 2. CONTRACT NO:
3. CONTRACT INITIATION DATE:
4. COMPLETION DATE:
5. TOTAL CONTRACT VALUE:
6. TYPE OF CONTRACT:
(Fixed Price, GMP, FPI, etc.)
7. D ESCRIPTION OF
TO BE COMPLETED BY EVALUATING ORGANIZATION REPRESENTATIVE
8. EVALUATION: a. EVALUATOR'S NAME, POSITION (Project Manager/ COR/ Other) AND ORGANIZATION:
b. EVALUATOR'S PHONE NUMBER: c. MONTHS PERFORMANCE MONITORED BY EVALUATOR:
Please circle the response code for each topic (A – G) that best reflects your experience with this contractor.
EX S = Satisfactory= Exceptional US = Unsatisfactory VG = Very Good N/O = Not ObservedMG = Marginal A. Quality of Products and Services - Assess the contractor’s conformance to contract requirements, specifications, and standards of good workmanship (e.g., technical, professional, environmental, or safety and health standards).
EX VG S MG US N/O
B. Performance – Assess the contractor’s performance as the General Contractor or Architect/Engineer (as appropriate) for the project.
EX VG S MG US N/O
C. Technical Requirements – Assess the contractor’s ability to fulfill the technical requirements of the contract.
EX VG S MG US N/O
D. Schedule – Assess the timeliness of contractor against the schedule of activities.
EX VG S MG US N/O
E. Cost Control – Assess the contractor’s ability to manage the contract budget and control costs.
EX VG S MG US N/O
F. Customer Satisfaction – Assess the contractor’s responsiveness to customer concerns and “user friendliness”
EX VG S MG US N/O
G. Overall Assessment.
EX VG S MG US N/O
Please complete this Questionnaire and email or send by facsimile to , Federal Aviation Administration Contracting Officer at:
Joni.L.Haynes and Karen.V-CTR.Czerwiec@faa.gov ZMP Multiple project
Factor 3: Past Performance