About this file

The Performance Questionnaire is a standardized form for evaluating a contractor's past performance across seven key assessment areas: quality of products/services, performance, technical requirements, schedule adherence, cost control, customer satisfaction, and overall performance. The document is designed to support a source selection process for the Federal Aviation Administration (FAA), with evaluators rating contractor performance using a scale ranging from Exceptional (EX) to Unsatisfactory (US), including options for Very Good (VG), Satisfactory (S), Marginal (MG), and Not Observed (N/O).

The questionnaire is specifically related to a solicitation (No. 697DCK-25-R-00354) for multiple projects at the Air Route Traffic Control Center in Minneapolis, Minnesota, involving tasks such as replacing exterior doors, resurfacing concrete floors, removing and replacing epoxy flooring, and modifying lighting systems. The solicitation follows a Lowest Priced Technically Acceptable (LPTA) award methodology, with proposals originally due by July 31, 2025, but subsequently amended to August 8, 2025, at noon Central Time. Two site visits were offered (July 9 and July 28, 2025), and multiple amendments have been issued to adjust project scope, release Q&A documents, and provide additional site visit information.

View the file

Other files

File Type Posted
697DCK-25-R-00354 Amendment 07.pdf PDF
697DCK-25-R-00354_Amendment 06.pdf PDF
J-16_QA for ZMP Multiple Project_Final_7.31.2025.pdf PDF
Concrete Curb Photos.pdf PDF
697DCK-25-R-00354 Amendment 05.pdf PDF
Exterior Stairs and Concrete Work.pdf PDF
Exterior Doors.pdf PDF
Tower lights.pdf PDF
Epoxy Floor in Bolier Room.pdf PDF
697DCK-25-R-00354 Amendment 04.pdf PDF
697DCK-25-R-00354_Amendment 03.pdf PDF
J-16_QA for ZMP Multiple Project_15 July_Solo.pdf PDF
J-16_Q and A for ZMP Multiple Project.pdf PDF
697DCK-25-R-00354 Amendment 02.pdf PDF
J-17_Excerpt_ZMP_RCLR_ID01922_Tower Assessment Report_2024_DNC.pdf PDF
697DCK-25-R-00354_Amendment 01.pdf PDF
J-15 Price proposal spreadsheet r.xlsx XLSX spreadsheet
J-12 FAA-C-1217H Chg 2.pdf PDF
J-10_Scope of Work_Exterior Concrete Work.pdf PDF
J-8b_ZMP Panel Replace Drawings Binder1.pdf PDF
J-4a_ZMP-04202024 GAS UNIT HEATER REPLACEMENT SPECS.pdf PDF
J-1b_Chilled Water Valve Replacement Drawings.pdf PDF
J-11 FAA-STD-019G.pdf PDF
J-9c_ZMP Boiler Drawing zmp-1203733-m001 Rev A.pdf PDF
J-9a_ZMP Boiler Scope of Work.pdf PDF
J-7_ZMP NASET Obstruction Lights SOW.pdf PDF
J-6c ZMP AHU 13 and 13 Humidifier Replace EOSH Impacts.pdf PDF
J-6a_ZMP AHU 12 and 13 Humidifier Replacement Spec.pdf PDF
J-4c_ZMP Gas Unit Heater EOSH Impacts.pdf PDF
J-4b_ZMP Gas Unit Heater Replacement Drawings (3).pdf PDF
J-3_Scope of Work_Exterior Doors.pdf PDF
J-1c_EOSH Impacts Chilled Water Valve Replace.pdf PDF
J-1a_Chilled Water Valve Replacement Project Spec.pdf PDF
J-13_Hazardous Energy Standard Procedure.pdf PDF
J-9e_ZMP Boiler EOSH Impacts.pdf PDF
J-5_Scope of Work_380 Steam Humidifier.pdf PDF
J-14_DOL WD MN20250053 5 2 25.pdf PDF
J-9d_ZMP Boiler Drawing zmp-msp-e-5896-a02r Bid Option.pdf PDF
J-9b_ZMP Boiler Vent Stack Replacement Specifications.pdf PDF
J-8c_ZMP Power Panel EOSH Impacts.pdf PDF
J-8a_ZMP Panel Replace Specs.pdf PDF
J-6b ZMP AHU 12 and 13 Humidifier Replacement Drawings.pdf PDF
J-2_Scope of Work_Epoxy Floor.pdf PDF
697DCK-25-R-00354_Final.pdf PDF
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE QUESTIONNAIRE

Your assistance is requested in support of a source selection

TO BE COMPLETED BY OFFEROR

1. CONTRACTOR NAME & ADDRESS: 2. CONTRACT NO:

3. CONTRACT INITIATION DATE:

4. COMPLETION DATE:

5. TOTAL CONTRACT VALUE:

6. TYPE OF CONTRACT:

(Fixed Price, GMP, FPI, etc.)

7. D ESCRIPTION OF

TO BE COMPLETED BY EVALUATING ORGANIZATION REPRESENTATIVE

8. EVALUATION: a. EVALUATOR'S NAME, POSITION (Project Manager/ COR/ Other) AND ORGANIZATION:

b. EVALUATOR'S PHONE NUMBER: c. MONTHS PERFORMANCE MONITORED BY EVALUATOR:

Please circle the response code for each topic (A – G) that best reflects your experience with this contractor.

EX S = Satisfactory= Exceptional US = Unsatisfactory VG = Very Good N/O = Not ObservedMG = Marginal A. Quality of Products and Services - Assess the contractor’s conformance to contract requirements, specifications, and standards of good workmanship (e.g., technical, professional, environmental, or safety and health standards).

EX VG S MG US N/O

B. Performance – Assess the contractor’s performance as the General Contractor or Architect/Engineer (as appropriate) for the project.

EX VG S MG US N/O

C. Technical Requirements – Assess the contractor’s ability to fulfill the technical requirements of the contract.

EX VG S MG US N/O

D. Schedule – Assess the timeliness of contractor against the schedule of activities.

EX VG S MG US N/O

E. Cost Control – Assess the contractor’s ability to manage the contract budget and control costs.

EX VG S MG US N/O

F. Customer Satisfaction – Assess the contractor’s responsiveness to customer concerns and “user friendliness”

EX VG S MG US N/O

G. Overall Assessment.

EX VG S MG US N/O

Please complete this Questionnaire and email or send by facsimile to , Federal Aviation Administration Contracting Officer at:

Joni.L.Haynes and Karen.V-CTR.Czerwiec@faa.gov ZMP Multiple project

Factor 3: Past Performance

File details come from the government source that posted it. Updated .