The file is a Price Proposal Spreadsheet for a solicitation (697DCK-25-R-00354) issued by the Department of Transportation Federal Aviation Administration Southwestern Region for multiple renovation projects at the Air Route Traffic Control Center in Minneapolis, MN. The spreadsheet outlines ten primary project line items including replacing chilled water and condenser water flow control valves, removing and replacing epoxy flooring, exterior doors, gas heaters, humidifiers, lighting systems, power panels, and boiler vent stacks, as well as resurfacing an exterior concrete floor. The solicitation allows contractors to bid on all, some, or individual line items, with award to be made on a Lowest Priced Technically Acceptable (LPTA) basis.
Key response dates include: site visit requests due by July 08, 2025, site visit scheduled for July 09, 2025 at 9AM Central Time, questions due by July 14, 2025, and proposals due by July 31, 2025, all at Noon Central Time. The price proposal spreadsheet provides a template for contractors to break down labor, materials, and total costs for each project line item, including provisions for overhead, profit, and bonding. However, in this specific spreadsheet, all line item and total costs are currently populated with $0.00, suggesting it is a blank template for potential bidders to complete.
View the file
Other files
Show all 44
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
PRICE PROPOSAL SPREADSHEET
Complete this Price Proposal Excel Spreadsheet for all work in accordance with all Attachments for each requirement on which your firm is placing an offer. If a price proposal is submitted in a different format, they may be determined to be non-responsive and eliminated from consideration for award. The contractor is responsible for providing all labor, materials, equipment, insurance and etc. necessary to meet each requirement offered. Any omission of any required pricing information constitutes incomplete pricing and therefore, non-responsive.
| Item | Division | Description | $ Labor | $ Materials | $ Labor & Materials |
| 1 | 1 | Replace two (2) Chilled Water Flow Control Valves and one (1) Condenser Water Flow Control Valve. | 0.00 | 0.00 | 0.00 |
| 2 | 2 | Remove and replace Epoxy Flooring in the Boiler Room | 0.00 | 0.00 | 0.00 |
| 3 | 3 | Remove and replace four (4) exterior doors in Power Service Building and Maintenance Garage | 0.00 | 0.00 | 0.00 |
| 4 | 4 | Demolish existing gas heaters and replace with ten (10) new gas unit heaters | 0.00 | 0.00 | 0.00 |
| 5 | 5 | Remove and replace HU-380 Humidifiers | 0.00 | 0.00 | 0.00 |
| 6 | 6 | Remove and replace AHU-12 and AHU-13 Humidifiers | 0.00 | 0.00 | 0.00 |
| 7 | 7 | Remove existing red-light and white strobe lights and replace with new dual LED lighting system | 0.00 | 0.00 | 0.00 |
| 8 | 8 | Remove and replace power panels | 0.00 | 0.00 | 0.00 |
| 9 | 9 | Remove and replace two (2) boiler vent stacks | 0.00 | 0.00 | 0.00 |
| 10 | 10 | Resurface exterior concrete floor and adjust concrete curb | 0.00 | 0.00 | 0.00 |
11 Subtotals: 0.00 0.00 0.00
| 12 | Project Subtotal for Labor and Materials: | 0.00 | |
| 13 | Overhead (Applied to Line 12) | 0.00% | 0.00 |
| 14 | Profit (Applied to Line 12) | 0.00% | 0.00 |
| 15 | Bond (Applied to Line 12) | 0.00% | 0.00 |
16 Project Grand Total (Total of lines 12, 13, 14, 15) $0.00