The file is a Price Proposal Spreadsheet for a solicitation (697DCK-25-R-00354) issued by the Department of Transportation Federal Aviation Administration Southwestern Region for multiple renovation projects at the Air Route Traffic Control Center in Minneapolis, MN. The spreadsheet outlines ten primary project line items including replacing chilled water and condenser water flow control valves, removing and replacing epoxy flooring, exterior doors, gas heaters, humidifiers, lighting systems, power panels, and boiler vent stacks, as well as resurfacing an exterior concrete floor. The solicitation allows contractors to bid on all, some, or individual line items, with award to be made on a Lowest Priced Technically Acceptable (LPTA) basis.

Key response dates include: site visit requests due by July 08, 2025, site visit scheduled for July 09, 2025 at 9AM Central Time, questions due by July 14, 2025, and proposals due by July 31, 2025, all at Noon Central Time. The price proposal spreadsheet provides a template for contractors to break down labor, materials, and total costs for each project line item, including provisions for overhead, profit, and bonding. However, in this specific spreadsheet, all line item and total costs are currently populated with $0.00, suggesting it is a blank template for potential bidders to complete.

View the file

Other files

File Type Posted
697DCK-25-R-00354 Amendment 07.pdf PDF
PPQ for ZMP Project.pdf PDF
697DCK-25-R-00354_Amendment 06.pdf PDF
J-16_QA for ZMP Multiple Project_Final_7.31.2025.pdf PDF
Exterior Doors.pdf PDF
Concrete Curb Photos.pdf PDF
697DCK-25-R-00354 Amendment 05.pdf PDF
Exterior Stairs and Concrete Work.pdf PDF
Tower lights.pdf PDF
Epoxy Floor in Bolier Room.pdf PDF
697DCK-25-R-00354 Amendment 04.pdf PDF
697DCK-25-R-00354_Amendment 03.pdf PDF
J-16_QA for ZMP Multiple Project_15 July_Solo.pdf PDF
J-16_Q and A for ZMP Multiple Project.pdf PDF
697DCK-25-R-00354 Amendment 02.pdf PDF
J-17_Excerpt_ZMP_RCLR_ID01922_Tower Assessment Report_2024_DNC.pdf PDF
697DCK-25-R-00354_Amendment 01.pdf PDF
J-11 FAA-STD-019G.pdf PDF
J-9c_ZMP Boiler Drawing zmp-1203733-m001 Rev A.pdf PDF
J-9a_ZMP Boiler Scope of Work.pdf PDF
J-7_ZMP NASET Obstruction Lights SOW.pdf PDF
J-6c ZMP AHU 13 and 13 Humidifier Replace EOSH Impacts.pdf PDF
J-6a_ZMP AHU 12 and 13 Humidifier Replacement Spec.pdf PDF
J-4c_ZMP Gas Unit Heater EOSH Impacts.pdf PDF
J-4b_ZMP Gas Unit Heater Replacement Drawings (3).pdf PDF
J-3_Scope of Work_Exterior Doors.pdf PDF
J-1c_EOSH Impacts Chilled Water Valve Replace.pdf PDF
J-1a_Chilled Water Valve Replacement Project Spec.pdf PDF
J-12 FAA-C-1217H Chg 2.pdf PDF
J-10_Scope of Work_Exterior Concrete Work.pdf PDF
J-8b_ZMP Panel Replace Drawings Binder1.pdf PDF
J-4a_ZMP-04202024 GAS UNIT HEATER REPLACEMENT SPECS.pdf PDF
J-1b_Chilled Water Valve Replacement Drawings.pdf PDF
J-13_Hazardous Energy Standard Procedure.pdf PDF
J-9e_ZMP Boiler EOSH Impacts.pdf PDF
J-5_Scope of Work_380 Steam Humidifier.pdf PDF
J-14_DOL WD MN20250053 5 2 25.pdf PDF
J-9d_ZMP Boiler Drawing zmp-msp-e-5896-a02r Bid Option.pdf PDF
J-9b_ZMP Boiler Vent Stack Replacement Specifications.pdf PDF
J-8c_ZMP Power Panel EOSH Impacts.pdf PDF
J-8a_ZMP Panel Replace Specs.pdf PDF
J-6b ZMP AHU 12 and 13 Humidifier Replacement Drawings.pdf PDF
J-2_Scope of Work_Epoxy Floor.pdf PDF
697DCK-25-R-00354_Final.pdf PDF
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

PRICE PROPOSAL SPREADSHEET

Complete this Price Proposal Excel Spreadsheet for all work in accordance with all Attachments for each requirement on which your firm is placing an offer. If a price proposal is submitted in a different format, they may be determined to be non-responsive and eliminated from consideration for award. The contractor is responsible for providing all labor, materials, equipment, insurance and etc. necessary to meet each requirement offered. Any omission of any required pricing information constitutes incomplete pricing and therefore, non-responsive.

ItemDivisionDescription$ Labor$ Materials$ Labor & Materials
11Replace two (2) Chilled Water Flow Control Valves and one (1) Condenser Water Flow Control Valve.0.000.000.00
22Remove and replace Epoxy Flooring in the Boiler Room0.000.000.00
33Remove and replace four (4) exterior doors in Power Service Building and Maintenance Garage0.000.000.00
44Demolish existing gas heaters and replace with ten (10) new gas unit heaters0.000.000.00
55Remove and replace HU-380 Humidifiers0.000.000.00
66Remove and replace AHU-12 and AHU-13 Humidifiers0.000.000.00
77Remove existing red-light and white strobe lights and replace with new dual LED lighting system0.000.000.00
88Remove and replace power panels0.000.000.00
99Remove and replace two (2) boiler vent stacks0.000.000.00
1010Resurface exterior concrete floor and adjust concrete curb0.000.000.00

11 Subtotals: 0.00 0.00 0.00

12Project Subtotal for Labor and Materials:0.00
13Overhead (Applied to Line 12)0.00%0.00
14Profit (Applied to Line 12)0.00%0.00
15Bond (Applied to Line 12)0.00%0.00

16 Project Grand Total (Total of lines 12, 13, 14, 15) $0.00