This Statement of Work (SOW) details a project for replacing the tower lighting system at 512 Division Street in Farmington, MN. The specific scope involves removing the existing red-light and white strobe systems from the tower and building, and installing a new dual LED lighting system. The project requires installing the controller, wiring the lighting system, grounding as needed, and testing all modes and alarms in accordance with Advisory Circular 70/7460-1M. The work is to be completed within one week, during hours of 7:00am to 5:00pm, with a preconstruction conference to be coordinated at least one week prior to the start time. The new lighting power supply will be run from an existing 120V power panel, and the contractor must coordinate security and badging requirements with local site personnel. The SSC point of contact is Alan Kiel, and no government-furnished materials are specified.

View the file

Other files

File Type Posted
697DCK-25-R-00354 Amendment 07.pdf PDF
PPQ for ZMP Project.pdf PDF
J-16_QA for ZMP Multiple Project_Final_7.31.2025.pdf PDF
697DCK-25-R-00354_Amendment 06.pdf PDF
Epoxy Floor in Bolier Room.pdf PDF
Concrete Curb Photos.pdf PDF
697DCK-25-R-00354 Amendment 05.pdf PDF
Exterior Stairs and Concrete Work.pdf PDF
Tower lights.pdf PDF
Exterior Doors.pdf PDF
697DCK-25-R-00354 Amendment 04.pdf PDF
J-16_QA for ZMP Multiple Project_15 July_Solo.pdf PDF
697DCK-25-R-00354_Amendment 03.pdf PDF
J-17_Excerpt_ZMP_RCLR_ID01922_Tower Assessment Report_2024_DNC.pdf PDF
697DCK-25-R-00354 Amendment 02.pdf PDF
J-16_Q and A for ZMP Multiple Project.pdf PDF
697DCK-25-R-00354_Amendment 01.pdf PDF
J-14_DOL WD MN20250053 5 2 25.pdf PDF
J-9d_ZMP Boiler Drawing zmp-msp-e-5896-a02r Bid Option.pdf PDF
J-9b_ZMP Boiler Vent Stack Replacement Specifications.pdf PDF
J-8c_ZMP Power Panel EOSH Impacts.pdf PDF
J-8a_ZMP Panel Replace Specs.pdf PDF
J-6b ZMP AHU 12 and 13 Humidifier Replacement Drawings.pdf PDF
J-2_Scope of Work_Epoxy Floor.pdf PDF
697DCK-25-R-00354_Final.pdf PDF
J-15 Price proposal spreadsheet r.xlsx XLSX spreadsheet
J-12 FAA-C-1217H Chg 2.pdf PDF
J-10_Scope of Work_Exterior Concrete Work.pdf PDF
J-8b_ZMP Panel Replace Drawings Binder1.pdf PDF
J-4a_ZMP-04202024 GAS UNIT HEATER REPLACEMENT SPECS.pdf PDF
J-1b_Chilled Water Valve Replacement Drawings.pdf PDF
J-13_Hazardous Energy Standard Procedure.pdf PDF
J-9e_ZMP Boiler EOSH Impacts.pdf PDF
J-5_Scope of Work_380 Steam Humidifier.pdf PDF
J-11 FAA-STD-019G.pdf PDF
J-9c_ZMP Boiler Drawing zmp-1203733-m001 Rev A.pdf PDF
J-9a_ZMP Boiler Scope of Work.pdf PDF
J-6c ZMP AHU 13 and 13 Humidifier Replace EOSH Impacts.pdf PDF
J-6a_ZMP AHU 12 and 13 Humidifier Replacement Spec.pdf PDF
J-4c_ZMP Gas Unit Heater EOSH Impacts.pdf PDF
J-4b_ZMP Gas Unit Heater Replacement Drawings (3).pdf PDF
J-3_Scope of Work_Exterior Doors.pdf PDF
J-1c_EOSH Impacts Chilled Water Valve Replace.pdf PDF
J-1a_Chilled Water Valve Replacement Project Spec.pdf PDF
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

Project Title ZMP LED Tower Lighting System

Location/Address 512 Division Street, Farmington, MN 55024

General Scope Remove existing red-light system from the tower and the controller from building.

Remove the existing white strobe from the tower and the controller from the building.

Supply and install a new Dual LED lighting system on the tower.

Install controller, wire in the lighting system, and ground as required.

Test new lighting system in all modes to ensure proper operation, and test all alarms, in accordance with Advisory Circular 70/7460-1M.

Properly dispose of old lighting system.

Hours of Work 7:00am – 5:00pm

Period of Performance 1 week

Preconstruction Conference PreCon to be coordinated no later than one week prior to start time

Security: Coordinate all security and badging requirements with local SSC and site personnel.

Specific Scope of Work Decommission existing electrical and Incandescent lighting system

Install new dual LED lighting system

New lighting power supply to be run from existing 120V Power panel.

COTR/COR (Name, Contact

Numbers)

SSC POC (Name, Contact

Numbers)

Alan Kiel

Government furnished materials

N/A

December 03, 2024

File details come from the government source that posted it. Updated .