This Statement of Work (SOW) details a project for replacing the tower lighting system at 512 Division Street in Farmington, MN. The specific scope involves removing the existing red-light and white strobe systems from the tower and building, and installing a new dual LED lighting system. The project requires installing the controller, wiring the lighting system, grounding as needed, and testing all modes and alarms in accordance with Advisory Circular 70/7460-1M. The work is to be completed within one week, during hours of 7:00am to 5:00pm, with a preconstruction conference to be coordinated at least one week prior to the start time. The new lighting power supply will be run from an existing 120V power panel, and the contractor must coordinate security and badging requirements with local site personnel. The SSC point of contact is Alan Kiel, and no government-furnished materials are specified.
View the file
Other files
Show all 44
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
Project Title ZMP LED Tower Lighting System
Location/Address 512 Division Street, Farmington, MN 55024
General Scope Remove existing red-light system from the tower and the controller from building.
Remove the existing white strobe from the tower and the controller from the building.
Supply and install a new Dual LED lighting system on the tower.
Install controller, wire in the lighting system, and ground as required.
Test new lighting system in all modes to ensure proper operation, and test all alarms, in accordance with Advisory Circular 70/7460-1M.
Properly dispose of old lighting system.
Hours of Work 7:00am – 5:00pm
Period of Performance 1 week
Preconstruction Conference PreCon to be coordinated no later than one week prior to start time
Security: Coordinate all security and badging requirements with local SSC and site personnel.
Specific Scope of Work Decommission existing electrical and Incandescent lighting system
Install new dual LED lighting system
New lighting power supply to be run from existing 120V Power panel.
COTR/COR (Name, Contact
Numbers)
SSC POC (Name, Contact
Numbers)
Alan Kiel
Government furnished materials
N/A