This document is an Attachment J-1502000-08e detailing Periodic Inspection and Maintenance Actions, updated in accordance with UFC 3-460-03 (Change 2, August 2023). The document outlines comprehensive maintenance requirements for five key infrastructure systems: Filters and Separators, Hydrant Pits and Valves, Cathodic Protection Systems, Spill Containment Areas, and Oil Water Separators (OWS). Each system has specific inspection and maintenance protocols with prescribed frequencies ranging from weekly to annually, including tasks such as inspecting for external damage, verifying operational integrity, measuring electrical parameters, cleaning components, and ensuring compliance with environmental standards.
The maintenance actions are meticulously detailed, specifying precise activities like recording differential pressure for filters, lubricating valve stems, measuring pipe-to-soil potential, inspecting containment areas for cracks and corrosion, and verifying compliance with permit requirements for oil water separators. Each section references specific paragraphs from the UFC 3-460-03 standard, indicating a structured approach to infrastructure maintenance that emphasizes preventative care, operational reliability, and environmental safety across multiple critical system components.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT J-1502000-08e
PERIODIC INSPECTION AND MAINTENANCE ACTIONS
Updated in accordance with UFC 3-460-03 (Change 2, August 2023)
1. Filters and Separators
• Inspect for external leaks, corrosion, and physical damage – Weekly (UFC 3-460-03 § 6-3.2.2)
• Record differential pressure; replace elements if DP > 15 psi – Weekly (UFC 3-460-03 § 6- 3.2.3)
• Verify gasket condition and element seating – Weekly (UFC 3-460-03 § 6-3.2.3)
• Inspect placards, labels, and markings – Monthly (UFC 3-460-03 § 6-3.2.5)
• Drain water/sediment from sumps – Weekly or As Needed (UFC 3-460-03 § 6-3.2.4)
2. Hydrant Pits and Valves
• Inspect pit covers, seals, and internal condition – Weekly (UFC 3-460-03 § 6-2.2)
• Verify valve operation and position indicators – Monthly (UFC 3-460-03 § 6-2.3)
• Lubricate valve stems and mechanical parts – Monthly (UFC 3-460-03 § 6-2.4)
• Confirm electrical grounding continuity – Monthly (UFC 3-460-03 § 6-6.1)
• Clean debris and ensure drain function – Weekly (UFC 3-460-03 § 6-2.2)
3. Cathodic Protection Systems
• Inspect rectifier output and verify voltage/amperage – Monthly (UFC 3-460-03 § 6-7.2.2)
• Record rectifier output and compare to baseline – Monthly (UFC 3-460-03 § 6-7.2.2)
• Measure pipe-to-soil potential at test stations – Quarterly (UFC 3-460-03 § 6-7.2.3)
• Verify continuity of protected structure – Annually or per system design (UFC 3-460-03 § 6- 7.2.4)
4. Spill Containment Areas
• Inspect for cracks, corrosion, and ponding – Monthly (UFC 3-460-03 § 6-8.1)
• Clean sumps and drains – Monthly or As Needed (UFC 3-460-03 § 6-8.1)
• Inspect signage and markings – Monthly (UFC 3-460-03 § 6-8.2)
• Verify slope, grading, and drainage performance – Monthly (UFC 3-460-03 § 6-8.3)
• Inspect containment walls, berms, and seals – Monthly (UFC 3-460-03 § 6-8.1)
5. Oil Water Separators (OWS)
• Inspect for sediment buildup, operational integrity – Monthly (UFC 3-460-03 § 6-9.3)
• Check valves, inlet/outlet piping for corrosion/leaks – Monthly (UFC 3-460-03 § 6-9.3)
• Remove floating oil and clean separator components – Monthly or As Needed (UFC 3-460-03 § 6-9.3)
• Record maintenance in environmental log – Monthly (UFC 3-460-03 § 6-9.3)
• Verify compliance with permit requirements – Monthly (UFC 3-460-03 § 6-9.4)