_IFB_-_PCS-25-061_-_ADVS-Sierra_Vista-Southern_Arizona_Veterans_.xlsx
XLSX spreadsheet 85 KB Posted
- Attached to
- IFB - PCS-25-061 - ADVS-Sierra Vista-Southern Arizona Veterans' Memorial Cemetery Expansion
- Solicitation number
- BPM006982
- Issued by
- Cochise County, Arizona
About this file
This is a bid schedule attachment for an Invitation for Bid (IFB) solicitation issued by the Arizona Department of Administration, General Services Division, for the Southern Arizona Veterans' Memorial Cemetery Expansion project in Sierra Vista (Solicitation No. BPM006982, Project No. PCS-25-061). The project encompasses comprehensive cemetery expansion work including general requirements, temporary construction, demolition of existing conditions, surveying, concrete work, precast architectural concrete, masonry, exterior signage, earth moving, asphalt paving, site furnishings, landscape irrigation and installation, storm sewer utilities, permits, erosion control, construction water, and the design, fabrication, delivery, and installation of precast concrete crypts. All line items are bid on a lump-sum basis with 20 distinct work categories. The bid remains valid for 90 calendar days following the scheduled bid closing time, and upon acceptance, the contractor must execute an agreement within 10 days and provide a Performance Bond, Payment Bond, and Certificates of Insurance.
The base bid subtotal is $3,451,749.00, with a required bid security of $364,358.00 (approximately 10 percent of the base bid). The grand total including 8.55 percent tax amounts to $3,643,579.95. All unit prices must include labor, materials, water disposal, debris removal, shoring, overhead, profit, insurance, and all related costs for project completion. The submitted bid was from Blue World Construction (Arizona Division Manager Thomas Gilliam, located in Glendale, Arizona) and includes Arizona Contractor's License Nos. ROC 333437 and ROC 356158, with license types for A General Engineering and KB-2 Dual Residential and Small Commercial work. Bid security must be submitted with the application, with an original to follow via mail within seven days of the bid due date.
View the file
Other files
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1 Solicitation No.
BPM006982
Project Name:
IFB -ADVS-Sierra Vista-Southern Arizona Veterans' Memorial Cemetery Expansion Agency Project No.
PCS-25-061 Arizona Department of Administration General Services Division 1400 W Washington St., Ste. B200 Phoenix, AZ 85007
ATTACHMENT B BID SCHEDULE
| Location | BASE BID | ||||
| ITEM NO. | DESCRIPTION | Estimated Quantity | Unit of Measure | Unit Price | Price Extension |
| BASE BID | |||||
| 1 | General Requirements | 1 | LS | $140,047 | $140,047.00 |
| 2 | Temporary Construction | 1 | LS | $55,937 | $55,937.00 |
| 2 | Exsiting Conditions Demolition | 1 | LS | $71,118 | $71,118.00 |
| 3 | Surveying | 1 | LS | $138,562 | $138,562.00 |
| 4 | Concrete | 1 | LS | $201,891 | $201,891.00 |
| 5 | Precast Architectural Concrete | 1 | LS | $95,411 | $95,411.00 |
| 7 | Units Masonry | 1 | LS | $82,483 | $82,483.00 |
| 8 | Exterior Signage | 1 | LS | $18,390 | $18,390.00 |
| 9 | Earth Moving | 1 | LS | $95,964 | $95,964.00 |
| 10 | Asphalt for Exterior Improvement | 1 | LS | $75,440 | $75,440.00 |
| 11 | Site Furnishings | 1 | LS | $63,359 | $63,359.00 |
| 12 | Landscape Irrigation | 1 | LS | $63,504 | $63,504.00 |
| 13 | Landscape | 1 | LS | $93,891 | $93,891.00 |
| 14 | Storm Sewer Utilities | 1 | LS | $72,020 | $72,020.00 |
| 16 | Permits | 1 | LS | $8,648 | $8,648.00 |
| 17 | SWPPP/Errosion Control | 1 | LS | $34,253 | $34,253.00 |
| 18 | Contruction Water | 1 | LS | $86,644 | $86,644.00 |
| 19 | Precast Concrete Crypt (Design, Fabrication and Delivery to Site) | 1 | LS | $851,523 | $851,523.00 |
| 20 | Precast Concrete Crypt (Installation Costs) | 1 | LS | $1,202,664 | $1,202,664.00 |
Subtotal BASE BID SUBTOTAL $3,451,749.00
TAX Your Tax Rate (Enter Rate Here)--------------------------------------------------------------> 8.55% $191,830.95
GRAND TOTAL GRAND TOTAL (TO INCLUDE TAX) $3,643,579.95
Unit prices for shall include all labor, materials, water disposal, bailing, shoring, removal, disposal, overhead, profit, insurance, and all other related costs and work to complete the ADVS-Sierra Vista-Southern Arizona Veterans' Memorial Cemetery Expansion.
Bidder understands that the Owner reserves the right to reject any or all Bids, or portions thereof, and to waive any informalities in the bidding.
The Bidder agrees that this Bid shall be good and may not be withdrawn for a period of ninety (90) calendar days after the scheduled closing time for receiving Bids.
Upon receipt of written notice of the acceptance of this Bid, Bidder shall execute AND Agreement within 10 days and deliver a Performance Bond, Payment Bond, and Certificates of Insurance.
| Bid Security the sum of |
| $ 364,358.00 |
| is to become the property of the Owner in the event the Contract and Bond(s) are not executed and provided within the time above set forth, as liquidated damages for the delay and additional expense to the Owner caused thereby. **Please submit a copy of the Bid Security with your submission in APP with an original to follow via mail within seven (7) days of the Bid Due Date** |
| RESPECTFULLY SUBMITTED BY: | |
| BY: | Thomas Gilliam |
| TITLE: | Arizona Division Manager |
| FIRM: | Blue World Construction |
| ADDRESS | 23650 N. 35th Drive, Suite 120/125 |
| CITY, STATE, ZIP | Glendale, Arizona 85310 |
| PHONE: | (928) 533-6474 |
| FAX: | |
| Seal - if Bid by a corporation | |
| AZ Contractor's License No: | ROC 333437 ROC 356158 |
| License Type: | A General Engineering KB-2 Dual Residential and Small Commercial |
image1.png
File details come from the government source that posted it. Updated .