This is a submittal review guide document prepared by the National Cemetery Administration (NCA) for the evaluation of concrete crypt installations at federal, state, and tribal veteran cemeteries. The document outlines the comprehensive crypt submittal review process developed over 18 years by Andrew J. Walters, PE, a Specialist with the Cemetery Development & Improvement Service. The guide details 12 to 20 instructional slides focusing on critical review items including verification of concrete precast plant NPCA certification, lid lifting apparatus specifications, galvanized anchor designations, drainage requirements, concrete mix design parameters with fly ash and fiber reinforcement, and structural calculations with emphasis on proper steel rebar placement and sizing. The document identifies five Professional Engineers employed by concrete precast companies who provide PE-stamped structural calculations: Gary Munkelt (Lindsay/Wieser/Universal/United Precast), Larry Jones (Wilbert Precast), Harrison (Creter Precast), Rivera-Smith (Sanipoli/Whited Precast), and Decent (Tribute Precast). The guide includes a typical review email dated December 23, 2024, from Walters regarding the Cheyanne National Cemetery crypt submittal, recommending resubmission with specified modifications and requiring three weeks advance notice for on-site buried load testing with a 12,000-pound axle load.

The submittal review process mandates testing of exterior and interior crypts plus oversized perimeter crypts where applicable, with buried testing serving to validate steel rebar grade, size, and placement in buttress walls rather than merely concrete compressive strength. The document emphasizes that standard operating procedure excludes fiber reinforcement from crypt lids to achieve superior top surface finishes while maintaining reinforcing steel in walls and floors. Critical structural elements requiring dimensional documentation include exact rebar location measurements from interior crypt wall faces, particularly in quad perimeter crypts. Walters' review commentary demonstrates the NCA's rigorous quality assurance approach, requiring submittal reductions addressing concrete mix design specifications, fiber reinforcement placement, and on-site testing protocols with photographic documentation of typical buried testing setups and inside-shelf removal tools.

View the file

Other files

File Type Posted
Attachments_A__C__D__E__F__G___H.pdf PDF
Sierra Vista Bid Tab.pdf PDF
Exhibit_6_-_Crypts-101-Wall-Field-Repair.pdf PDF
Exhibit_2_-_Crypts-101-Buried-Testing.pdf PDF
Att H - Sierra Vista KEG.pdf PDF
Exhibit_3_-_Crypts-101-Field-Inspection-_-Protection.pdf PDF
BPM006982_Solicitation_Amendment_3.pdf PDF
BPM006982_Solicitation_Amendment_1.pdf PDF
BPM006982_Solicitation_Amendment_2.pdf PDF
B314 IFB Contract Award and Executive Summary_Template_r0_04-10-23 (1).pdf PDF
Pre-Bid Sign-In Sheet 6.25.25.pdf PDF
Legal Ad.pdf PDF
APS_Attachment_B_Bid_Schedule.xlsx XLSX spreadsheet
KE_G_-_Attachments_A-H_-_Final.pdf PDF
Pre-Bid_Sign-In_Sheet_6.25.25.pdf PDF
Exhibit_7_-_Wage_Decision_Number_AZ20250038_06202025.pdf PDF
SV_Geotechnical_Report_Final.pdf PDF
Section_F_-_Technical_Specifications_-_Sierra_Vista.pdf PDF
Exhibit_1_-_BABAA-Language-for-Project-Manual-_as-of-01.2024_.pdf PDF
APS_Attachment_B_Bid_Schedule.pdf PDF
IFB_Forms_ATT_B_Bid_Schedule_-_Sierra_Vista_-KE_G_Final.xlsx XLSX spreadsheet
_BPM006982_Solicitation_Amendment_1__Attachments_A__C__D__E__F__G___H.pdf PDF
_IFB_-_PCS-25-061_-_ADVS-Sierra_Vista-Southern_Arizona_Veterans_.xlsx XLSX spreadsheet
IFB_Forms_ATT_B_Bid_Schedule_-_Sierra_Vista.xlsx XLSX spreadsheet
O&A Executed.pdf PDF
BPM006982 NOA Letter.pdf PDF
BPM006982_IFB_ADVS_Sierra_Vista_Cemetery_REV_1.pdf PDF
Exhibit_4_-_Crypts-101-Overall.pdf PDF
Responsive-Responsibility - Sierra.xlsx XLSX spreadsheet
Exhibit_7___Wage_Decision_Number_AZ20250038_07042025.pdf PDF
Sierra_Vista_Bid_Tab.pdf PDF
SV_25-102_Attachments_A__C__D__E__F__G___H.pdf PDF
KE_G_Seal_PDF_IFB_Forms_ATT_B_Bid_Schedule_-_Sierra_Vista_-KE_G_Final.pdf PDF
Required_Proposal_Docs (1).pdf PDF
Section_E_-_Issued_for_Construction_Plan_Set_-_Sierra_Vista.pdf PDF
Exhibit_8_-_29_CFR_Part_5.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Submittal Review Crypts 101

➢ Genesis:

National Cemetery Administration

18 years ago, Mr. Muro announced that the new NCA’s Crypt Specialist is to review Crypt submittals. Fed, State & Tribal:

Since Mr. Muro’s decision, I review each project’s crypt submittal, and send my comments to the PM who then adds my comments to AE’s review (if any) and eventual final approval.

For new & reno Cemetery projects, the NCA contracts with AE design firms that provide Plans, Specs, Submittals review, Inspection, As-Builts, etc. for crypt install projects. The AE has in-house or contracts for design disciplines such as electrical, mechanical, and structural, etc.. Most, if not all of the AE’s Professional Structural Engineers (PE) do not get involved with thin-wall concrete vessels (2” walls & less); most likely from not trusting “fiber” as reinforcement and/or higher risk of wall failure tarnishing their PE license. The five PEs listed below are the exception, but all work for the concrete Precasters only.

That is where I play a part providing expertise.

With my 10 years of private industry experience providing Structural Engineering, I review & comment on the crypt submittal in its entirety including the “PE stamped” Structural Calculations as provided by one of the five (5) PE’s below. My approval of the crypt submittal including Calculations makes all involved very happy.

The five (5) PE’s hired by the concrete Precasters are listed below.

I also provide crypt submittal reviews for State & Tribal Veteran Cemetery crypt install projects. 95% of the time I am the only one doing this review.

OK, with all that said, I can put together 12 to 20 slides of what to look for in a Crypt 101 Submittal review. It will be boring!! No actual field pictures. Slides will be pages from an actual submittal that will have yellow highlight areas and maybe some red lines & arrows, plus some pithy text to point out what to look for.

➢ Items to Review.

National Cemetery Administration

Proposed Crypt Submittal “Reviewing” Slides:

1) Check for concrete precast plant’s NPCA certificate is current.

2) Assure proper lid lifting wire rope apparatus.

3) Assure inside-shelf lid lifting apparatus included.

4) Check Lid anchors are designated “Hot Dipped Galvanized.”

5) Check 4-inch (tapering) diameter crypt floor drainholes are shown.

6) Check the concrete Mix Design has:

i) fly ash, proper SCC slump/spread, etc…..

ii) Fly ash waiver if applicable. Why is that acceptable.

iii) Has fiber reinforcement. Fiber not necessary in lids.

7) Structural Calculations: (including OverSized)

i) Confirm use of 24-inch fill cover over lids for installs that are not stepped crypts.

ii) Steel rebar in crypt perimeter walls is consistent. Use all #5s or all #4s. Not both in a crypt. Explain why.

iii) Steel rebar shown in the proper position for perimeter wall bending area is critical.

8) Typical Quad crypt detail pages: (including OverSized)

i) Quad interior crypt

ii) Quad perimeter crypt (steel rebar is in the proper place in buttresses)

iii) Oversized crypts.

➢List of PEs in the past

National Cemetery Administration

Professional Engineers (PE) hired by concrete Precasters for “PE stamped” crypt loading “Structural Calculations” in crypt submittals:

Lindsay/Wieser/Universal/United Precast uses Mr. Gary Munkelt, PE Wilbert Precast uses Mr. Larry Jones, PE Creter Precast uses Mr. Harrison, PE Sanipoli/Whited Precast uses Rivera-Smith, PE Tribute Precast uses Mr. Decent, PE

Submittal

Review

Crypts 101

➢ Typical Review email

National Cemetery Administration

From: Walters, Andrew J. <Andrew.Walters3@va.gov> Sent: Monday, December 23, 2024 7:48 AM To: Derrick Morris <derrick.morris@valiint.com> Cc: Paul Crowe <paul.crowe@valiint.com> Subject: RE: Crypt Submittal Review

Mr. Morris, Mr. Crowe, My review comments are following of Cheyanne National Cemetery’s concrete Crypt

Submittal dated Dec. 6, 2024 with Structural Design Calculations. Oversized crypts are NOT submitted. Crypts are to be provided by Lindsay Precast in Colorado Springs CO.

I would recommend resubmitting of this crypt submittal based on addressing the following:

1. The concrete Mix Design has fly ash. Excellent.

2. The concrete Mix design shows fiber reinforcing in crypt walls and floor. Excellent. Standard operating procedure is fiber is NOT included in the crypt lids for better top lid surface finishes since reinforcing steel is present. Excellent again.

3. The submittal page “BURIAL CRYPT – QUAD PERIMETER shows three #5 rebars in the Quad’s beams but does not show exact location of the rebar from the inside crypt wall face. This dimension is structurally critical and needs to be inserted into said page.

On-site Crypt buried load testing needs to include exterior & interior crypts plus an Oversized perimeter crypt (if applicable). Pic of typical buried testing set-up and be provided. Please bring the inside-shelf removal tool(s) for the buried testing.

Also, please allow me three (3) weeks of advance notice to schedule travel to witness the on-site testing.

Thanks, Andy

Andrew J. Walters, PE Specialist, Cemetery Development & Improvement Service (41A2) National Cemetery Administration 1700 Clairmont Road Decatur, GA 30033 O. 404-929-5910 C. 678-699-4896

Reasons to do Buried Crypt test:

The crypt confined buried test w/ 12,000 lb axle load running over it will test a whole lot more than the concrete’s compressive strength. Such as:

1. Steel rebar is the right grade, properly sized, and in the proper locations in perimeter crypts’ buttress walls.

Maximum load over Crypts (12,000 lb axle):

➢ Test Crypts Layout option Simplistic (and acceptable):

National Cemetery Administration

Slide 1
Slide 2
Slide 3
Slide 4
Slide 5
Slide 6