Exhibit_4_-_Crypts-101-Overall.pdf

PDF 9 MB Posted

Attached to
IFB - PCS-25-061 - ADVS-Sierra Vista-Southern Arizona Veterans' Memorial Cemetery Expansion
Solicitation number
BPM006982
Issued by
Cochise County, Arizona

About this file

This is an educational exhibit document prepared by the National Cemetery Administration detailing Pre-Placed Crypts (PPCs) technology for cemetery development and expansion projects. The document, created by Andrew J. Walters, PE Specialist for Cemetery Development & Improvement Service on June 24, 2021, serves as instructional material for the Southern Arizona Veterans' Memorial Cemetery Expansion project (IFB PCS-25-061) managed by the Arizona Department of Veterans' Services. The exhibit provides comprehensive technical guidance on PPC construction methodology, including crypt fabrication, installation procedures, site preparation requirements, and operational processes. PPCs are thin-walled concrete vessels designed to hold four caskets per quad unit, with installation requiring only 22-inch excavation depth rather than traditional 8-foot burial depths. The construction sequence encompasses concrete pouring into steel forms, 24-hour form removal with 48-hour curing, placement onto prepared plots with drainage systems, numbering and finishing procedures, backfill and landscaping, and final burial operations using simplified casket lowering devices. The document emphasizes critical protection requirements for PPC fields during cemetery expansion construction activities.

The exhibit identifies significant risk factors that can compromise PPC structural integrity during construction and development phases. Heavy equipment restrictions are paramount, with water trucks, concrete trucks, fully-loaded dump trucks, and tall material piles prohibited from operating within 10 yards of active PPC fields. This restriction directly impacts construction planning and contractor operations for the cemetery expansion project, requiring careful equipment staging and site logistics management. The document functions as a prerequisite reference for bidders responding to the IFB PCS-25-061 procurement, with proposals due July 10, 2025. Contractors must demonstrate understanding of PPC installation requirements, drainage systems, landscaping integration, and equipment management protocols to ensure successful cemetery expansion while protecting pre-installed crypt infrastructure.

View the file

Other files

File Type Posted
BPM006982_IFB_ADVS_Sierra_Vista_Cemetery_REV_1.pdf PDF
Responsive-Responsibility - Sierra.xlsx XLSX spreadsheet
Exhibit_7___Wage_Decision_Number_AZ20250038_07042025.pdf PDF
Sierra_Vista_Bid_Tab.pdf PDF
SV_25-102_Attachments_A__C__D__E__F__G___H.pdf PDF
KE_G_Seal_PDF_IFB_Forms_ATT_B_Bid_Schedule_-_Sierra_Vista_-KE_G_Final.pdf PDF
Required_Proposal_Docs (1).pdf PDF
Section_E_-_Issued_for_Construction_Plan_Set_-_Sierra_Vista.pdf PDF
Exhibit_8_-_29_CFR_Part_5.pdf PDF
Attachments_A__C__D__E__F__G___H.pdf PDF
Sierra Vista Bid Tab.pdf PDF
Exhibit_6_-_Crypts-101-Wall-Field-Repair.pdf PDF
Exhibit_2_-_Crypts-101-Buried-Testing.pdf PDF
Att H - Sierra Vista KEG.pdf PDF
Exhibit_3_-_Crypts-101-Field-Inspection-_-Protection.pdf PDF
Exhibit_7_-_Wage_Decision_Number_AZ20250038_06202025.pdf PDF
SV_Geotechnical_Report_Final.pdf PDF
Section_F_-_Technical_Specifications_-_Sierra_Vista.pdf PDF
Exhibit_1_-_BABAA-Language-for-Project-Manual-_as-of-01.2024_.pdf PDF
APS_Attachment_B_Bid_Schedule.pdf PDF
IFB_Forms_ATT_B_Bid_Schedule_-_Sierra_Vista_-KE_G_Final.xlsx XLSX spreadsheet
_BPM006982_Solicitation_Amendment_1__Attachments_A__C__D__E__F__G___H.pdf PDF
_IFB_-_PCS-25-061_-_ADVS-Sierra_Vista-Southern_Arizona_Veterans_.xlsx XLSX spreadsheet
IFB_Forms_ATT_B_Bid_Schedule_-_Sierra_Vista.xlsx XLSX spreadsheet
O&A Executed.pdf PDF
BPM006982 NOA Letter.pdf PDF
BPM006982_Solicitation_Amendment_3.pdf PDF
BPM006982_Solicitation_Amendment_1.pdf PDF
BPM006982_Solicitation_Amendment_2.pdf PDF
Exhibit_5_-_Crypts-101-Submittal-Review.pdf PDF
B314 IFB Contract Award and Executive Summary_Template_r0_04-10-23 (1).pdf PDF
Pre-Bid Sign-In Sheet 6.25.25.pdf PDF
Legal Ad.pdf PDF
APS_Attachment_B_Bid_Schedule.xlsx XLSX spreadsheet
KE_G_-_Attachments_A-H_-_Final.pdf PDF
Pre-Bid_Sign-In_Sheet_6.25.25.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Pre-Placed Crypts (PPCs) 101 Overall

June 24, 2021

Andrew J. Walters, PE Specialist, Cemetery Development & Improvement Service (41A2) National Cemetery Administration

Crypts 101 slides to date:

1. Overall

2. Inspection & Protection

3. On-site Buried Testing

4. Wall Repair

Why PPCs? Eliminates issues of 8-ft dig depth.

Besides only digging 22” to a crypt lid, this is avoided.

National Cemetery Administration

Pour fluid concrete into steel Quad crypt forms.

Remove forms in 24 hrs. Let cure for 48 hours.

Each Quad crypt has two lids and holds four caskets.

Crypts are thin-wall vessels (2” walls). Handle with care.

Excavate PPC fields, place fabric, install drain rock & piping.

Set crypts to ¼” tolerance onto 3-ft x 8-ft plots (typical).

Aerial View of same.

Lids lifted to paint crypt numbers on inside walls.

A proper inside-shelf fit. Shelf holds the 2nd casket if any.

Smooth inside walls and large floor drain holes.

Pea gravel installed into gaps between crypts

Backfill 22” over crypt lids with sand, dirt and topsoil.

Sod and lawn irrigation installed.

Dig is ONLY 22” to lid, remove lid & shelf. No 8-ft deep dig.

Ramps & Casket Lowering Device (CLD)

Lid replaced. Backfill graded dirt over lid and compacted.

Sod placed and headstones installed. Done.

So what can go wrong? Collapsed walls can happen if:

If water trucks get within 10 yds of the PPC field

If concrete trucks get within 10 yds of a PPC field.

If fully-loaded dump trucks get within 10 yds of PPC field If tall piles of material get within 10 yds of PPC field

END

Pre-Placed Crypts (PPCs) 101� Overall � June 24, 2021���
Slide Number 2
Slide Number 3
Slide Number 4
Slide Number 5
Slide Number 6
Slide Number 7
Slide Number 8
Slide Number 9
Slide Number 10
Slide Number 11
Slide Number 12
Slide Number 13
Slide Number 14
Slide Number 15
Slide Number 16
Slide Number 17
Slide Number 18
Slide Number 19
Slide Number 20
Slide Number 21
Slide Number 22

File details come from the government source that posted it. Updated .