IFB_Forms_ATT_B_Bid_Schedule_-_Sierra_Vista.xlsx
XLSX spreadsheet 84 KB Posted
- Attached to
- IFB - PCS-25-061 - ADVS-Sierra Vista-Southern Arizona Veterans' Memorial Cemetery Expansion
- Solicitation number
- BPM006982
- Issued by
- Cochise County, Arizona
About this file
This is a Bid Schedule attachment for an Invitation for Bid (IFB) issued by the Arizona Department of Administration, General Services Division, for the Southern Arizona Veterans' Memorial Cemetery Expansion project in Sierra Vista (Solicitation No. BPM006982, Project No. PCS-25-061). The project encompasses comprehensive cemetery expansion work including general requirements, temporary construction, demolition of existing conditions, surveying, concrete work, masonry, exterior signage, earth moving, asphalt paving, site furnishings, landscape irrigation, landscaping, storm sewer utilities, permits, erosion control, construction water, and the design, fabrication, delivery, and installation of precast concrete crypts. All line items are bid on a lump-sum basis, with the subtotal base bid amount of $3,353,100.00 plus applicable tax of $291,719.70 for a grand total of $3,644,819.70. Bidders must maintain their bids for ninety calendar days following the bid closing date, execute an agreement within ten days of bid acceptance, and provide performance bonds, payment bonds, and certificates of insurance upon contract award. A bid security amount of $364,482.00 is required to be submitted with the proposal.
The pricing structure requires unit prices that encompass all labor, materials, water disposal, removal, overhead, profit, insurance, and related costs necessary to complete the project. The bid was submitted by Paradigm CCW JV LLC, represented by Construction Manager Brandon Curtis, holding Arizona Contractor's License No. #328071 (KB-1 classification). The owner reserves the right to reject any or all bids and waive any bidding informalities. Bid security must be submitted with the initial proposal, with an original to follow by mail within seven days of the bid due date.
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1 Solicitation No.
BPM006982
Project Name:
IFB -ADVS-Sierra Vista-Southern Arizona Veterans' Memorial Cemetery Expansion AgencyAgency Project No.
PCS-25-061 Arizona Department of Administration General Services Division 1400 W Washington St., Ste. B200 Phoenix, AZ 85007
ATTACHMENT B BID SCHEDULE
| Location | BASE BID | ||||
| ITEM NO. | DESCRIPTION | Estimated Quantity | Unit of Measure | Unit Price | Price Extension |
| BASE BID | |||||
| 1 | General Requirements | 1 | LS | $426,500.00 | $426,500.00 |
| 2 | Temporary Construction | 1 | LS | $42,000.00 | $42,000.00 |
| 2 | Exsiting Conditions Demolition | 1 | LS | $220,000.00 | $220,000.00 |
| 3 | Surveying | 1 | LS | $56,000.00 | $56,000.00 |
| 4 | Concrete | 1 | LS | $89,500.00 | $89,500.00 |
| 5 | Precast Architectural Concrete | 1 | LS | $0.00 | $0.00 |
| 7 | Units Masonry | 1 | LS | $0.00 | $0.00 |
| 8 | Exterior Signage | 1 | LS | $19,500.00 | $19,500.00 |
| 9 | Earth Moving | 1 | LS | $446,500.00 | $446,500.00 |
| 10 | Asphalt for Exterior Improvement | 1 | LS | $52,500.00 | $52,500.00 |
| 11 | Site Furnishings | 1 | LS | $28,500.00 | $28,500.00 |
| 12 | Landscape Irrigation | 1 | LS | $69,500.00 | $69,500.00 |
| 13 | Landscape | 1 | LS | $143,000.00 | $143,000.00 |
| 14 | Storm Sewer Utilities | 1 | LS | $317,000.00 | $317,000.00 |
| 16 | Permits | 1 | LS | $5,700.00 | $5,700.00 |
| 17 | SWPPP/Errosion Control | 1 | LS | $55,000.00 | $55,000.00 |
| 18 | Contruction Water | 1 | LS | $0.00 | $0.00 |
| 19 | Precast Concrete Crypt (Design, Fabrication and Delivery to Site) | 1 | LS | $842,000.00 | $842,000.00 |
| 20 | Precast Concrete Crypt (Installation Costs) | 1 | LS | $539,900.00 | $539,900.00 |
Subtotal BASE BID SUBTOTAL $3,353,100.00
TAX Your Tax Rate (Enter Rate Here)--------------------------------------------------------------> 8.7000% $291,719.70
GRAND TOTAL GRAND TOTAL (TO INCLUDE TAX) $3,644,819.70
Unit prices for shall include all labor, materials, water disposal, bailing, shoring, removal, disposal, overhead, profit, insurance, and all other related costs and work to complete the ADVS-Sierra Vista-Southern Arizona Veterans' Memorial Cemetery Expansion.
Bidder understands that the Owner reserves the right to reject any or all Bids, or portions thereof, and to waive any informalities in the bidding.
The Bidder agrees that this Bid shall be good and may not be withdrawn for a period of ninety (90) calendar days after the scheduled closing time for receiving Bids.
Upon receipt of written notice of the acceptance of this Bid, Bidder shall execute AND Agreement within 10 days and deliver a Performance Bond, Payment Bond, and Certificates of Insurance.
| Bid Security the sum of |
| $ 364,482.00 |
| is to become the property of the Owner in the event the Contract and Bond(s) are not executed and provided within the time above set forth, as liquidated damages for the delay and additional expense to the Owner caused thereby. **Please submit a copy of the Bid Security with your submission in APP with an original to follow via mail within seven (7) days of the Bid Due Date** |
| RESPECTFULLY SUBMITTED BY: | |
| BY: | Brandon Curtis |
| TITLE: | Construction Manager |
| FIRM: | Paradigm CCW JV LLC |
| ADDRESS | 5110 N 40th st. Ste 254 |
| CITY, STATE, ZIP | Phoenix, AZ 85018 |
| PHONE: | 602.315.4389 |
| FAX: | |
| Seal - if Bid by a corporation | |
| AZ Contractor's License No: | #328071 |
| License Type: | KB-1 |