This is an Exhibit A site map and operational guide for landscaping services at the Decker Power Station, a facility managed by what appears to be a municipal or regional utility. The document outlines seven distinct landscaping zones across approximately 9 acres of plant buildings and grounds plus additional outlying areas requiring comprehensive vegetation management and maintenance services. The zones include the main plant building and grounds (Zone 1), outlying plant areas and photovoltaic regions (Zone 2), a backup control center (Zone 3), the 969 River Pump Station (Zone 4), Lindell Gas Yard (Zone 5), dam and lake-side perimeter areas (Zone 6), and a pipeline easement corridor (Zone 7). Landscaping activities across all zones include mowing, weed eating, shrub trimming, tree and vegetation removal up to specified diameter limits, debris removal from storm drains, fence line vegetation management, and stormwater channel maintenance. Several zones require advance scheduling and locked gate access coordinated with Decker management, and all contractor personnel must complete orientation videos, maintain valid hard hat stickers, and complete annual safety training.
Zone 6 includes quarterly treatment of rip-rap areas with herbicides to prevent vegetation growth, requiring contractors to possess appropriate licenses and certifications for herbicide application near the lake. Contractors electing alternative weed control methods must provide detailed descriptions on bid sheets. Safety Data Sheets (SDS) for any treatment materials must be submitted one month in advance for approval by Decker's Environmental Professional. Access procedures require valid identification at the South Gate Guard House, sign-in and sign-out at the Administration Building for each visit, one-hour advance notice for locked area access, and notification to management when starting and finishing work in each zone. The document references a full Landscaping Scope of Work and Decker Contractor Work Requirements (Appendix B) for complete service specifications, indicating this exhibit serves as a supplementary visual and logistical reference for contracted landscaping operations.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Exhibit A: Decker Power Station
Landscaping Site Maps
General Site Reminders:
• Review SOW and Decker Contractor Work Requirements (Appendix B)
• Enter South Gate 1/Guard House. Provide Guard with valid ID.
• Sign in and Out at the Admin Building every visit
• Inform management when starting and finishing a Zone.
• Give 1 hour notice before arriving at a locked area to allow time for a Decker employee to unlock it.
First visit for ALL contractors/crew: Watch Decker Contractor Orientation Video. Always wear and keep valid Decker Contractor hard hat sticker visible. Every contractor must complete safety orientation annually.
Note: Appendix A is an overview of each zone and some details may be omitted. Refer to Decker Landscaping Scope of Work for complete service details.
Plant Building and Grounds/9 acres: Zone 1
Zone 1 Notes: Decker Plant Bldgs., grounds, 3 entry gates/driveways, lake side, and all stormwater sampling points
• Lake side is locked, Call Decker management ahead of arrival.
Method: Mowing, weed eating, trimming shrubs around bldgs., cutting trees or weeds smaller than 3” in diameter, removing debris from storm drains, and mowing and trimming 3 FT on outside of perimeter fencing. Lake side consists of trimming, removal of growth from fence, and cutting trees/weeds smaller than 2” diameter.
Upon request, treat parking lots, curbs, boiler mats, roadways, and gravel areas for vegetation growth prevention.
Main Entry, South Gate #1:: Middle Gate # 2: North Gate #3:
Plant Building and Grounds/9 acres (continued): Zone 1
Zone 1 Notes: Decker Plant Bldgs., grounds, 3 entry gates/driveways, lake side, and all stormwater sampling areas.
• Lake side is locked, Call Decker management ahead of arrival.
Method: Mowing, weed eating, trimming shrubs around bldgs., cutting trees or weeds smaller than 3” in diameter, removing debris from storm drains, and mowing and trimming 3 FT on outside of perimeter fencing. Lake side consists of trimming, removal of growth from fence, and cutting trees/weeds smaller than 2” diameter.
Upon request, treat parking lots, curbs, boiler mats, roadways, and gravel areas for vegetation growth prevention.
Outlying Plant Areas: Zone 2
Notes: To include all outer areas not included in Zone 1. Includes photovoltaic area, road to boat ramp, along peninsula.
• Back Road to Boat ramp is LOCKED: Call Decker management ahead of arrival.
Method: Mowing (shredder), trimming, removing debris from storm drains, ditches, and gabions, removing vegetation from fence lines
Outlying Plant Areas, continued: Zone 2
Notes: To include all outer areas, photovoltaic area, back road to boat ramp, along peninsula, and all storm water sample locations.
• Back Road to Boat ramp is LOCKED: Call Decker management ahead of arrival.
Method: Mowing (shredder), weed eating, trimming shrubs around bldgs., cutting trees or weeds smaller than 2” in diameter, removing debris from storm drains concrete stormwater channels, ensuring paths are clear to sampling points, and mowing and trimming 3 FT on outside of perimeter fencing. Removing vegetation from fence lines.
Upon request, treat parking lots, curbs, boiler mats, roadways, and gravel areas for vegetation growth prevention.
Boat Ramp
Locked Gate
Back Up Control Center (BUCC): Zone 3
Notes: Enter through Decker Middle Gate 2 after checking in with security and Decker management.
Method: Mowing, weed eating, trimming shrubs around bldgs., cutting trees or weeds smaller than 2” in diameter
969 River Pump Station: Zone 4
Notes:
• LOCKED: Call Decker management ahead of arrival.
• Close cattle gates behind you when entering and exiting.
Method: trimming and mowing along the roadway from 969 to the river pump station. Trimming along river pump station fence, and mowing trimming up to tree line.
Lindell Gas Yard: Zone 5
Method: Mowing, trimming, inside and around the perimeter of the gas yard. Removing vegetation from fence.
Dam, Lake Side, Perimeter, Bar Ditches: Zone 6
• Main entrance via Walter E. Long Metropolotan Park
Method: Mowing, trimming around sprinklers and stormwater channels, removing debris and grass clippings from drains/ stormwater channels, trimming of vegetation growing on perimeter fencing, and weed/vegetation management along and in concrete stormwater channels.
Quarterly Treatment of rip-rap*
* Decker Dam has rip-rap that will be treated quarterly to prevent vegetation growth. Due to the proximity to the lake, Contractors must have appropriate license or certificates to complete the application of necessary herbicides. Contractor may elect to submit alternate method of controlling weed growth in these areas, but any changes from herbicides shall be specifically described on the bid sheets. Prior to performing any treatments, Contractors SHALL/MUST submit SDS one month in advance for review and approval by Decker’s Environmental Professional.
Locked Gate
Pipeline Easement (Decker Plant to Lindell Gas Yard): Zone 7
Notes: Decker Power Plant to Lindell Gas Yard along pipeline easement. Mowing/trimming 3 feet inside the perimeter fence and 7 feet outside the fence, following the gas pipeline along Decker Lane. Mowing /trimming inside the fenceline along Lindell Lane to the Lindell Gas Yard.
Method: Mowing, weed eating, cutting trees or weeds smaller than 2” in diameter, removing vegetation from fence lines
File details come from the government source that posted it. Updated .