This is an equipment inventory form for landscaping and grounds maintenance services supporting Austin Energy's operations in Texas. The form, titled Exhibit B Power Plant Landscaping Equipment List, requires contractors bidding on landscaping and grounds maintenance services for Sand Hill Energy Center and Decker Creek Power Station to provide a detailed inventory of all equipment they will use to service the contract if awarded. Contractors must complete the equipment list with specifications including equipment type, brand and model, size, year made, EPA/CARB certification numbers, fuel type, and condition for each piece of equipment. The listed equipment must be available for inspection by City representatives within two weeks following contract award.
The form indicates a preference for low-emissions equipment, alternative fuel options, electric-powered equipment, and machinery manufactured in or after 2007 with low-emissions profiles. Contractors must certify under their signature and provide their full company name and the certification date that all listed equipment will be available for contract services if the award is made. The form does not specify pricing terms, contract duration, renewal options, set-asides, or funding sources.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXHIBIT B
POWER PLANT LANDSCAPING EQUIPMENT LIST
Equipment Inventory List
Sand Hill Energy Center and Decker Creek Power Station
Company Name: _______________________________________________
Please list equipment which you will use to service this contract if awarded. All information for each piece of equipment must be filled out including year made and fuel type. The equipment listed must be available for City Representative(S) to inspect within 2 weeks after contract award is made.
Equipment Type Brand/Model Size Year Made EPA/CARB# Fuel Type Condition
Note: Low Emissions Equipment, Alternative Fuel, Electric Power, and equipment manufactured on, or after, 2007 with low emissions profile will be given preference.
I certify that the above equipment will be available for services this contract if award
Contractor’s Full Name: ______________________________________________
Contractor’s Signature: _________________________________________ Date: ___________________