Attachment Z - USCG FONSI FRC Homeport at SFO Galveston.pdf

PDF 121 KB Posted

Attached to
DESIGN/BUILD FRC HOMEPORTING SECTOR FIELD OFFICE (SFO) GALVESTON, GALVESTON, TX
Solicitation number
HSCG47-17-R-3EFK02
Issued by

About this file

Attachment Z

View the file

Other files

File Type Posted
Wage_Determination_-_Building.pdf PDF
Amendment_No_0008.pdf PDF
HSCG4717R3EFK02_Amendment_No__0007.pdf PDF
Wage_Determination_-_Building.pdf PDF
Wage_Determination_-Heavy.pdf PDF
Amendment_No._0006.pdf PDF
Amendment_No._0005.pdf PDF
Industrial_Facility_and_Mobile_Boat_Hoist_-_PSI_Geotech_Report.pdf PDF
WAGE_DECISION_NO.__TX170067-_Heavy.pdf PDF
galveston085879sh29.pdf PDF
North_and_South_Pier.pdf PDF
WAGE_DECISION_NO._TX170298_-_Building.pdf PDF
Site_Visit_Attendance_Sheet.pdf PDF
Amendment_No._0004.pdf PDF
Amendment_No._0003.pdf PDF
AMENDMENT_001.pdf PDF
Appendix D - Design Narrative-Sept2012.pdf PDF
Attachment Y - SFO Galveston EA Mar 2017_Final e-signed.pdf PDF
Appendix H - CSTO Electrical Shore Ties.pdf PDF
GALV_FRC_COMBINED_DRAWINGS_5795615_23MAY17.pdf PDF
Appendix C -FDCC File Naming-SEP 2014.pdf PDF
Appendix I - Boat Data.pdf PDF
Appendix J - Hydrant Flow Test Report.PDF PDF
GALVESTON_INDUSTRIAL_BLDG_ARCH_ELEVATIONS.pdf PDF
Appendix M - 154 FRC Mooring Concept.pdf PDF
Attachment O&M Part 2 Equipment Enrollment Form.pdf PDF
Attachment O&M Part 3 SAM Job Plan.pdf PDF
Appendix B -ElectDeliv-Sept2012.pdf PDF
Appendix G - CSTO Telecomm Shore Ties.pdf PDF
SFO_Galveston_FRC_Homeporting_Spec.pdf PDF
Attachment X - 154-WPC_582_201_1_-_-MOORING AND TOWING A&D COMBINED.pdf PDF
RFP_HSCG47-17-R-3EFK02.pdf PDF
Appendix A-ComputerGenDrwgs-Sept2012.pdf PDF
Attachment O&M Part 1 Existing SAM Coast Guard Maintained Equipment.pdf PDF
Appendix E - Industry Standards for Const Docs-Sept2012.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FINDING OF NO SIGNIFICANT IMPACT

FOR

FAST RESPONSE CUTTER HOMEPORT

UNITED STATES COAST GUARD

SECTOR FIELD OFFICE GALVESTON, GALVESTON, TEXAS

This action has been thoroughly reviewed by the USCG and it has been determined, by the undersigned, that this project will have no significant effect on the human environment. This finding of no significant impact is based on the environmental assessment (EA) prepared by Mitchell Barido, Environmental Protection Specialist, which has been independently evaluated by the USCG and determined to adequately and accurately discuss the environmental issues and impacts of the proposed project and provides sufficient evidence and analysis for determining that an environmental impact statement is not required. The USCG takes full responsibility for the accuracy, scope, and content of the attached environmental assessment.

Chief, Environmental Branch, CEU Miami Date Andrew Bobick Title/Position Environmental Reviewer

I have considered the information contained in the EA, which is the basis for this FONSI. Based on the information in the EA and this FONSI document, I agree that the proposed action as described above, and in the EA, will have no significant impact on the environment.

Commanding Officer, CEU Miami Date R. A. Hueller, CDR Title/Position Responsible Official

ALBobick Typewritten Text 28 March, 2017

ALBobick Typewritten Text

2017-03-28T14:19:11-0400
BOBICK.ANDREW.L.1017690970
I have reviewed this document
2017-03-29T09:36:08-0400
HUELLER.ROBERT.A.1186443370

File details come from the government source that posted it. Updated .