Sector Miami FRC Home-porting Planning Proposal
_______________________________________________________________________________________ 5 for which Berth 3 is currently dedicated since the necessary supporting infrastructure for this work is located there.
2.3.2 FRC REQUIREMENTS SUMMARY
Table 2.1 (this page) reflects revised FRC requirements provided by the USCG in January 2009. The largest difference is a reduction in shore support facility requirements.
COMPONENT THRESHOLD OBJECTIVE
Depth at mooring max draft + 4' @ mean low water max draft + 7' @ mean low water Channel depth max draft X 1.3 @ mean low water max draft X 1.5 @ mean low water Mooring length 154' + 20' per cutter 154' + 40' per cutter
Slip width
Total number of dock spaces 6 7
Pier lay down space 2,000 NSF in addition to pier/wharf space;
within 1/2 mile of pier/wharf
4,000 NSF in addition to pier/wharf space;
within 1/2 mile of pier/wharf
Horizontal load
Vertical load Accessibility of AASHTO truck loading HS20; or accessible gov't. pier max 25 NM
Accessibility of AASHTO truck loading
HS20.
Mooring devices/deck fittings Min. 3 cleats & bollards per cutter each capable of holding 2 breasted FRCs
Min.4 cleats & bollards per cutter each capable of holding 2 breasted FRCs
Fendering Lighting Electrical Potable water Sewage
Telephone Min 6 telephone lines. Box to be waterproof, & corrosion-proof.
Min 10 telephone lines. Box to be waterproof, & corrosion-proof.
Cable TV Local Area Network (LAN)
Fire protection Cooperation w/ local fire dept.w/ 15-min.
response ability
2 - 2-1/2" shore connections w/ 500 gpm @ 125 psi
Refuse Removal Compressed Air None 125 psi @ 100 cfm per cutter Oily water disposal High Purity Water Fueling
Ammunition handling Facility capable of handling w/in 200 miles from homeport.
Capability to conduct load/off-load in homeport.
Parking stalls 57 spaces (80% of crew + 1 Gov't. vehicle per cutter)
69 spaces (100% of crew + 1 Gov't. vehicle per cutter)
Parking Arrangement 30 stalls w/in 500' of pierhead, 27 in secure lot w/in 2,000' of 5-min. drive of cutter
10 stallsadjacent to each cutter, 39 w/in 1,000' of of cutter
Cutter general storage 900 NSF total 1,800 NSF total Cutter machine/engine shops 0 NSF 600 NSF MAT 5,000 NSF + 600 NSF for boat bay 6,000 NSF + 600 NSF for boat bay Parts/Tool Storage Flammable Storage HAZMAT Storage
152.4' for single berth pier; 178' for multiple ships moored on 1 pierface; 204' for ships breasted on single berth pier; 229' for ships breasted on a multiple berth pier
5 Knots impact perpendicular to pier
Min 1,100 gal/day via 1-1/2" @100 gpm/min 30 psi - max 55 psi
Shore Infrastructure
Via truck (AASHTO) Via truck (AASHTO)
400 A @ 450VAC nom. sys. voltage, 3-phase, ungrounded within 60' of shoretie Comply with guidelines in UFC 4-025-01 (for AT/FP) Comply with guidelines in UFC 4-025-01 (for AT/FP)
Table 2.1 FRC Waterfront & Shore Support Infrastructure Requirements
Min capacity 1,500gal/day via 4" @ 150 gpm
One commercial service line
240 NSF
2,400 NSF total 150 NSF total
Capable of fueling at pier via truck (AASHTO)
4 pair Cat 5 fiber optic connectors that support 100 Mbps or 100/1,000 Mbps.
Applicable local procedures w/ 10'X10' dumpster within 50' of pierhead
Waterfront Infrastructure