Attachment O&M Part 2 Equipment Enrollment Form.pdf

PDF 136 KB Posted

Attached to
DESIGN/BUILD FRC HOMEPORTING SECTOR FIELD OFFICE (SFO) GALVESTON, GALVESTON, TX
Solicitation number
HSCG47-17-R-3EFK02
Issued by

About this file

Attachment O&M Part 2

View the file

Other files

File Type Posted
Wage_Determination_-_Building.pdf PDF
Amendment_No_0008.pdf PDF
HSCG4717R3EFK02_Amendment_No__0007.pdf PDF
Wage_Determination_-_Building.pdf PDF
Wage_Determination_-Heavy.pdf PDF
Amendment_No._0006.pdf PDF
Amendment_No._0005.pdf PDF
Industrial_Facility_and_Mobile_Boat_Hoist_-_PSI_Geotech_Report.pdf PDF
WAGE_DECISION_NO.__TX170067-_Heavy.pdf PDF
galveston085879sh29.pdf PDF
North_and_South_Pier.pdf PDF
WAGE_DECISION_NO._TX170298_-_Building.pdf PDF
Site_Visit_Attendance_Sheet.pdf PDF
Amendment_No._0004.pdf PDF
Amendment_No._0003.pdf PDF
AMENDMENT_001.pdf PDF
Appendix D - Design Narrative-Sept2012.pdf PDF
Attachment Y - SFO Galveston EA Mar 2017_Final e-signed.pdf PDF
Appendix H - CSTO Electrical Shore Ties.pdf PDF
GALV_FRC_COMBINED_DRAWINGS_5795615_23MAY17.pdf PDF
Appendix C -FDCC File Naming-SEP 2014.pdf PDF
Appendix I - Boat Data.pdf PDF
Appendix J - Hydrant Flow Test Report.PDF PDF
GALVESTON_INDUSTRIAL_BLDG_ARCH_ELEVATIONS.pdf PDF
Appendix M - 154 FRC Mooring Concept.pdf PDF
Attachment O&M Part 3 SAM Job Plan.pdf PDF
Appendix B -ElectDeliv-Sept2012.pdf PDF
Appendix G - CSTO Telecomm Shore Ties.pdf PDF
SFO_Galveston_FRC_Homeporting_Spec.pdf PDF
Attachment Z - USCG FONSI FRC Homeport at SFO Galveston.pdf PDF
Attachment X - 154-WPC_582_201_1_-_-MOORING AND TOWING A&D COMBINED.pdf PDF
RFP_HSCG47-17-R-3EFK02.pdf PDF
Appendix A-ComputerGenDrwgs-Sept2012.pdf PDF
Attachment O&M Part 1 Existing SAM Coast Guard Maintained Equipment.pdf PDF
Appendix E - Industry Standards for Const Docs-Sept2012.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Coast Guard Maintained Equipment with Corresponding Means PM Plan

Bldg # Floor Room #

D304008 e.g. Air Handling Unit 3159 1st Boiler Rm Carrier YE3666OER21 7112LO3306 10/1/2004 $ 1,200.00 $ 500.00 10/1/2005 300 CFM, 480V, Phase 3, 5 ton 1780‐Q, 1778‐A Q/A

D202002 e g. Backflow Preventer 3159 1st Mech Rm Watts 900 112112 1/1/2000 $ 4,500.00 $ 1,200.00 1/1/2001 2.5 IN 1972‐A A

D303002 e.g. Condensing Unit 3159 Roof N/A Trane TTTR025C10 L204P9GAF 5/15/1996 $ 2,500.00 $ 1,000.00 5/15/1997 R‐22, 4.2lbs, 300/300 PSI 1826Q, 1825A Q/A

D302002 e.g. Hot Water Boiler 3159 1st Mech Rm Cleaver Brooks MCF MB586 6/30/2012 $ 1,500.00 $ 700.00 6/30/2013 900 MBH 1914‐M, 1913‐Q, 1912‐A M/Q/A

D302003 e.g. Package Unit Forced Air, Gas 3159 N/A N/A York D2NX04D09 N1D0784403 9/15/2008 $ 3,000.00 $ 1,500.00 9/15/2009 250 MBH, R‐22, 6.3lbs, 278/144 1937Q, 1936A Q/A

B301099 e.g. Roof 3159 Roof N/A N/A N/A N/A 1/1/1990 $ 25,000.00 $ 10,000.00 1/1/2015 10700 SF, Shingles 9069‐A A

Bldg 3159

CG SAM "JOB PLAN"

Number: (Correlates with a RS Means Preventative

Maintenance Ref number ‐ See Appendix O&M Parts

1&3)

PM Job Plan(s) w/ Frequency

(i.e. 1921‐M, 1920‐Q, 1919‐ A)

Landlord OPFAC SAM Site #

Serial # Installation

Date Purchase Price1 Replacement

Cost2 Warranty Expiration

Date

Equipment Attributes3

(Identification/Name Plate Information)

1. Purchase Price: Total cost of installation to include cost of equipment, labor, shipping, etc…

2. Replacement Cost: Cost of equipment only.

General Instructions:

3. Equipment Attributes: To include sizes (i.e. motor HP, SF, LF, etc…), capacities (other than size), and ratings.

Uniformat II Level 4

To be filled out by Contractor (white blocks)

Landlord/Unit Name

Equipment Enrollment Form

To be filled out by Government (shaded blocks)

Physical Location

Equipment Description Manufacturer

Name Model #

SAM Location/Bldg # SAM Location Description

SAM Location # 4542342 = Bldg 3159

Version 1.0

APPENDIX O&M - PART 2

File details come from the government source that posted it. Updated .