Appendix B -ElectDeliv-Sept2012.pdf

PDF 13 KB Posted

Attached to
DESIGN/BUILD FRC HOMEPORTING SECTOR FIELD OFFICE (SFO) GALVESTON, GALVESTON, TX
Solicitation number
HSCG47-17-R-3EFK02
Issued by

About this file

Appendix B

View the file

Other files

File Type Posted
Wage_Determination_-_Building.pdf PDF
Amendment_No_0008.pdf PDF
HSCG4717R3EFK02_Amendment_No__0007.pdf PDF
Wage_Determination_-_Building.pdf PDF
Wage_Determination_-Heavy.pdf PDF
Amendment_No._0006.pdf PDF
Amendment_No._0005.pdf PDF
Industrial_Facility_and_Mobile_Boat_Hoist_-_PSI_Geotech_Report.pdf PDF
WAGE_DECISION_NO.__TX170067-_Heavy.pdf PDF
galveston085879sh29.pdf PDF
North_and_South_Pier.pdf PDF
WAGE_DECISION_NO._TX170298_-_Building.pdf PDF
Site_Visit_Attendance_Sheet.pdf PDF
Amendment_No._0004.pdf PDF
Amendment_No._0003.pdf PDF
AMENDMENT_001.pdf PDF
Appendix D - Design Narrative-Sept2012.pdf PDF
Attachment Y - SFO Galveston EA Mar 2017_Final e-signed.pdf PDF
Appendix H - CSTO Electrical Shore Ties.pdf PDF
GALV_FRC_COMBINED_DRAWINGS_5795615_23MAY17.pdf PDF
Appendix C -FDCC File Naming-SEP 2014.pdf PDF
Appendix I - Boat Data.pdf PDF
Appendix J - Hydrant Flow Test Report.PDF PDF
GALVESTON_INDUSTRIAL_BLDG_ARCH_ELEVATIONS.pdf PDF
Appendix M - 154 FRC Mooring Concept.pdf PDF
Attachment O&M Part 2 Equipment Enrollment Form.pdf PDF
Attachment O&M Part 3 SAM Job Plan.pdf PDF
Appendix G - CSTO Telecomm Shore Ties.pdf PDF
SFO_Galveston_FRC_Homeporting_Spec.pdf PDF
Attachment Z - USCG FONSI FRC Homeport at SFO Galveston.pdf PDF
Attachment X - 154-WPC_582_201_1_-_-MOORING AND TOWING A&D COMBINED.pdf PDF
RFP_HSCG47-17-R-3EFK02.pdf PDF
Appendix A-ComputerGenDrwgs-Sept2012.pdf PDF
Attachment O&M Part 1 Existing SAM Coast Guard Maintained Equipment.pdf PDF
Appendix E - Industry Standards for Const Docs-Sept2012.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project name PN: xxxxxxx City, State

Appendix B Page 1 of 1

CRITERIA FOR ELECTRONIC DELIVERABLES

A. ACCEPTABLE DIGITAL MEDIA:

All electronic (digital) files shall be delivered on recordable compact disks (CD-R). Files shall not be compressed.

Compact Disk Requirements:

Each CD-R shall have an external label noting at a minimum, the Contractor’s name, USCG project number, project title, type of submittal and date.

B. FILE FORMATS:

All files shall be saved on the CD-R in an organized manner using separate file folders for drawings, specifications, calculations, data files, permits, etc. Drawings, specifications and permit file names shall be in accordance with FDCC’s Adept File Naming Guide (See Appendix C). File types shall be saved in the following formats:

Specifications - MS WORD “.doc”, and Adobe Acrobat 8 or earlier “.pdf” Calculations and Reports - Adobe Acrobat 8 or earlier "pdf" Drawings - Autodesk ".dwg" Version 2009 or earlier and

Adobe Acrobat 8 or earlier “.pdf” (all submittals) Permit Documents - Adobe Acrobat 8 or earlier "pdf" Data files, catalog cuts - Adobe Acrobat 8 or earlier "pdf"

C. PERMIT DOCUMENTS:

Final permit documents shall be optically scanned as individual documents.

Criteria for Electronic deliverables

File details come from the government source that posted it. Updated .