Amendment_No_0008.pdf

PDF 173 KB Posted

Attached to
DESIGN/BUILD FRC HOMEPORTING SECTOR FIELD OFFICE (SFO) GALVESTON, GALVESTON, TX
Solicitation number
HSCG47-17-R-3EFK02
Issued by

About this file

Amendment 0008

View the file

Other files

File Type Posted
Wage_Determination_-_Building.pdf PDF
HSCG4717R3EFK02_Amendment_No__0007.pdf PDF
Wage_Determination_-_Building.pdf PDF
Wage_Determination_-Heavy.pdf PDF
Amendment_No._0006.pdf PDF
Amendment_No._0005.pdf PDF
Industrial_Facility_and_Mobile_Boat_Hoist_-_PSI_Geotech_Report.pdf PDF
WAGE_DECISION_NO.__TX170067-_Heavy.pdf PDF
galveston085879sh29.pdf PDF
North_and_South_Pier.pdf PDF
WAGE_DECISION_NO._TX170298_-_Building.pdf PDF
Site_Visit_Attendance_Sheet.pdf PDF
Amendment_No._0004.pdf PDF
Amendment_No._0003.pdf PDF
AMENDMENT_001.pdf PDF
Appendix D - Design Narrative-Sept2012.pdf PDF
Attachment Y - SFO Galveston EA Mar 2017_Final e-signed.pdf PDF
Appendix H - CSTO Electrical Shore Ties.pdf PDF
GALV_FRC_COMBINED_DRAWINGS_5795615_23MAY17.pdf PDF
Appendix C -FDCC File Naming-SEP 2014.pdf PDF
Appendix I - Boat Data.pdf PDF
Appendix J - Hydrant Flow Test Report.PDF PDF
GALVESTON_INDUSTRIAL_BLDG_ARCH_ELEVATIONS.pdf PDF
Appendix M - 154 FRC Mooring Concept.pdf PDF
Attachment O&M Part 2 Equipment Enrollment Form.pdf PDF
Attachment O&M Part 3 SAM Job Plan.pdf PDF
Appendix B -ElectDeliv-Sept2012.pdf PDF
Appendix G - CSTO Telecomm Shore Ties.pdf PDF
SFO_Galveston_FRC_Homeporting_Spec.pdf PDF
Attachment Z - USCG FONSI FRC Homeport at SFO Galveston.pdf PDF
Attachment X - 154-WPC_582_201_1_-_-MOORING AND TOWING A&D COMBINED.pdf PDF
RFP_HSCG47-17-R-3EFK02.pdf PDF
Appendix A-ComputerGenDrwgs-Sept2012.pdf PDF
Attachment O&M Part 1 Existing SAM Coast Guard Maintained Equipment.pdf PDF
Appendix E - Industry Standards for Const Docs-Sept2012.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

1 3

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4 REQUISITION/PURCHASE REQ NO. PROJECT NO. (If applicable)

0008 16 January 2018 N/A

6. ISSUED BY Code 7. ADMINISTERED BY (If other than item 6.) Code N/A

Contracting Division

USCG, Facilities Design & Construction Center

5505 Robin Hood Road, Suite K

Norfolk, VA 23513-2431

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) 9A. AMENDMENT OF SOLICITATION NO.

HSCG47-17-R-3EFK02

9B. DATED (SEE ITEM 11)

30 June 2017

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended is not extended . Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning 1 copy of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (if required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14. ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATION CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103 (b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER: (specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

DESIGN/BUILD FRC HOMEPORTING SECTOR FIELD OFFICE (SFO) GALVESTON,

GALVESTON, TX

DESCRIPTION OF AMENDMENT CONTINUED ON PAGE 2

FAILURE TO ACKNOWLEDGE AMENDMENT MAY BE CAUSE FOR REJECTION OF

YOUR OFFER.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR (Same as Item 8) 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY

(Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV.1-83) 0224-3(10-90)

PREVIOUS EDITION UNUSABLE Prescribed by GSA

FAR (49 CFR) 53.243

HSCG47-17-R-3EFK02

SOLICITATION NO. HSCG47-17-R-3EFK02 IS AMENDED AS FOLLOWS:

1. SECTION J, LIST OF ATTACHMENTS: DELETE Attachment J.5 DOL Wage Determination: General Wage Decision Number TX180298 dated 01/05/2018 and Replace with General Wage Decision Number TX180298 Modification Number 1 dated 01/12/2018 attached. This wage determination is applicable to Option Item 0001 work.

ANSWERS TO RFI QUESTIONS:

1. Paragraph 1.13.1.2.2 of section 01800 in the RFP requires the new South Pier shore ties to be connected to 1200amp switchboard MSB. Paragraph 1.13.2.4 requires the replacement of the existing switchboard and maintaining the electrical service to equipment that is existing to remain. Amendment 0006 states to connect the new building to the new switchboard. Please provide the demand electrical load for the existing equipment that will remain connected to switchboard MSB. The existing load is required to size the new switchboard.

Response:

The designer of record will need to confirm exact loading of the 1200 Amp switchboard.

The latest trend data indicated that switchboard electric load was at 750 Amps.

2. To limit down time for the existing to remain loads in switchboard MSB, we plan to install a new switchboard next to the existing and provide new feeders for the existing to remain circuits from the new switchboard to the existing one. The circuit breakers and busbar would be removed from the existing switchboard and it would be used as a splice box. Please confirm that is approach is acceptable.

Response:

The Coast Guard has no issues with this approach. The Contractor assumes all responsibility with using this approach.

3. I am respectfully requesting an extension to the bid date to 25 January. The extra time will help us coordinate with several divisions of work and deliver better pricing.

Response:

Please see Amendment 0007 for the new receipt for proposal date.

4. Would you consider a longer duration for the design and construction of the FRC building? As with any design build you have several prescribed design and design review periods that also include USCG feedback and response. The design phase will likely take an aggressive 6.5 months to complete only leaving roughly 7 months for construction. Although the building can be built in 7 months it will be a bit rushed.

Taking into consideration commissioning, testing and outfitting we feel that a construction duration of 10 months will provide a better quality project. Would you consider making the design and construction duration for the FRC building 490 days?

HSCG47-17-R-3EFK02

Response:

The design and construction duration for the FRC building is extended from 400 to 490 days.

5. Are there any restrictions or temporary controls associated with the pier work as it relates to after-hours work, off hours work, separated walk ways for USCG personnel, special signage etc? Are the piers going to be use by the USCG during our construction work, specifically the South pier, will you remove the boats from the south pier during our construction work? I believe the retrofitting of the North pier can be done during normal working hours with it being occupied by USCG if proper controls are in place.

Response:

The work hours are restricted to 0630 to 1830 Monday through Friday. No work on Weekends or Federal holidays unless authorized in advanced by the Contracting Officer. The vessels associated with the South Pier will be relocated to another Pier during the construction of the South Pier. The vessel associated with the Southside of the North Pier will be relocated during construction of the North Pier. The Contractor will need to share the Pier when the vessel associated with the Northside of the North Pier is in port.