AMENDMENT_001.pdf

PDF 57 KB Posted

Attached to
DESIGN/BUILD FRC HOMEPORTING SECTOR FIELD OFFICE (SFO) GALVESTON, GALVESTON, TX
Solicitation number
HSCG47-17-R-3EFK02
Issued by

About this file

Revised Table of Contents

View the file

Other files

File Type Posted
Wage_Determination_-_Building.pdf PDF
Amendment_No_0008.pdf PDF
HSCG4717R3EFK02_Amendment_No__0007.pdf PDF
Wage_Determination_-_Building.pdf PDF
Wage_Determination_-Heavy.pdf PDF
Amendment_No._0006.pdf PDF
Amendment_No._0005.pdf PDF
Industrial_Facility_and_Mobile_Boat_Hoist_-_PSI_Geotech_Report.pdf PDF
WAGE_DECISION_NO.__TX170067-_Heavy.pdf PDF
galveston085879sh29.pdf PDF
North_and_South_Pier.pdf PDF
WAGE_DECISION_NO._TX170298_-_Building.pdf PDF
Site_Visit_Attendance_Sheet.pdf PDF
Amendment_No._0004.pdf PDF
Amendment_No._0003.pdf PDF
Appendix D - Design Narrative-Sept2012.pdf PDF
Attachment Y - SFO Galveston EA Mar 2017_Final e-signed.pdf PDF
Appendix H - CSTO Electrical Shore Ties.pdf PDF
GALV_FRC_COMBINED_DRAWINGS_5795615_23MAY17.pdf PDF
Appendix C -FDCC File Naming-SEP 2014.pdf PDF
Appendix I - Boat Data.pdf PDF
Appendix J - Hydrant Flow Test Report.PDF PDF
GALVESTON_INDUSTRIAL_BLDG_ARCH_ELEVATIONS.pdf PDF
Appendix M - 154 FRC Mooring Concept.pdf PDF
Attachment O&M Part 2 Equipment Enrollment Form.pdf PDF
Attachment O&M Part 3 SAM Job Plan.pdf PDF
Appendix B -ElectDeliv-Sept2012.pdf PDF
Appendix G - CSTO Telecomm Shore Ties.pdf PDF
SFO_Galveston_FRC_Homeporting_Spec.pdf PDF
Attachment Z - USCG FONSI FRC Homeport at SFO Galveston.pdf PDF
Attachment X - 154-WPC_582_201_1_-_-MOORING AND TOWING A&D COMBINED.pdf PDF
RFP_HSCG47-17-R-3EFK02.pdf PDF
Appendix A-ComputerGenDrwgs-Sept2012.pdf PDF
Attachment O&M Part 1 Existing SAM Coast Guard Maintained Equipment.pdf PDF
Appendix E - Industry Standards for Const Docs-Sept2012.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

Design/Build Construction of Homeporting Sector Field Office (SFO) Galveston, Galveston, TX

This amendment is issued to Delete the Specification Table of Contents and Replace with the attached Specification Table of Contents titled "Guidespec_TOC_Revised"

Phase I written proposals are due 31 July 2017 no later than 2:00 p.m.

U.S. Coast Guard Facilities Design & Construction Center 5505 Robin Hood Rd, Suite K Norfolk, VA 23513

HSCG47-17-R-3EFK02

07/03/2017

06/30/2017

FRC Homeporting SFO Galveston SFRL: 08-5795615 Galveston, TX

Project No. 5758271 Page 1 of 1 Table of Contents

PROJECT RFP REQUIREMENTS

Section Title

TOC TABLE OF CONTENTS

01110 DESIGN-BUILD GENERAL PARAGRAPHS

01200 DESIGN-BUILD PROGRESS PAYMENTS

01320 DESIGN-BUILD PROGRESS SCHEDULE

01330 DESIGN-BUILD SUBMITTAL PROCEDURES

01450 QUALITY CONTROL

01500 TEMPORARY COR FACILITIES AND EQUIPMENT

01505 PROJECT MEETINGS

01781 OPERATION AND MAINTENANCE DATA DOCUMENTATION

01800 DESIGN-BUILD CRITERIA

1.1 GENERAL PROJECT REQUIREMENTS AND DESCRIPTION

1.2 ROLES OF RFP SPECIFICATIONS & DRAWINGS

1.3 SUSTAINABLE DESIGN AND LEED-NC CERTIFICATION

1.4 CIVIL AND SITE WORK

1.5 GEOTECHNICAL

1.6 LANDSCAPING

1.7 ARCHITECTURAL

1.8 STRUCTURAL

1.9 DEMOLITION

1.10 FIRE PROTECTION

1.11 PLUMBING

1.12 HEATING VENTILATING AND AIR CONDITIONING

1.13 ELECTRICAL

1.14 SECURITY SYSTEMS AND CCTV

1.15 CABLE TV

1.16 TELECOMMUNICATIONS AND PUBLIC ADDRESS

1.18 ENVIRONMENTAL DESIGN, PERMITS, CONTROLS, AND PROTECTION

01802 01803 01900

CONSTRUCTION DESIGN DOCUMENTS

RECORD DOCUMENTS AND DRAWINGS

LIST OF DRAWINGS

APPENDIX A COMPUTER GENERATED DRAWINGS

APPENDIX B CRITERIA FOR ELECTRONIC DELIVERABLES

APPENDIX C ADEPT FILE NAMING

APPENDIX D DESIGN NARRATIVE

APPENDIX E INDUSTRY STANDARDS FOR CONSTRUCTION DOCUMENTS

APPENDIX F

APPENDIX G

APPENDIX H

NOT USED

CSTO TELECOMM SHORE TIES

CSTO ELECTRICAL SHORE TIES

APPENDIX I

APPENDIX J

APPENDIS K

APPENDIX L

APPENDIX M

USCG BOAT DATA

HYDRANT FLOW TEST REPORT

NOT USED

STANDARD CLASSIFICATION FOR BUILDING ELEMENTS AND

RELATED SITEWORK – UNIFORMAT II

154 FRC MOORING CONCEPT

File details come from the government source that posted it. Updated .