IMG_1596.JPG

JPG image 6 MB Posted

Attached to
Condenser Water Filtration System Upgrade Federal contract opportunity
Solicitation number
HC102821R0018
Issued by
Defense Information Systems Agency

About this file

This document provides details on a request for proposal for upgrading the condenser water filtration system at a Defense Information Systems Agency facility in San Antonio, Texas. The contractor will be required to enhance the cooling towers, replace piping, adjust the water pump, run temporary chillers for redundancy testing, and adjust the water filtration controls. A site visit will be offered on March 31, 2021 with two sessions for contractors to better understand the work requirements. Questions are due by April 9, 2021 and should be addressed to the email listed. The Defense Information Systems Agency is seeking these upgrades to improve reliability, energy use, and redundancy at the facility.

View the file

Other files for this federal contract opportunity

Other files attached to Condenser Water Filtration System Upgrade, newest first.
File Type Posted
HC102821R00180010.pdf PDF
HC102821R0018-Final Revised CLIN Pricing Worksheet_DP.xlsx XLSX spreadsheet
Updated HC102821R0018-PaymentPlan.xlsx XLSX spreadsheet
QandA on WaterFiltration Upgrade.xlsx XLSX spreadsheet
HC102821R00180006.pdf PDF
HC102821R0018-Payment Plan.xlsx XLSX spreadsheet
HC102821R0018-New CLIN Pricing Worksheet.xlsx XLSX spreadsheet
HC102821R00180005.pdf PDF
183144S-eTCX-0210-SRV.pdf PDF
eHTX-0090-ICWT-Independent-Testing.pdf_safe.pdf PDF
IMG_1627.JPG JPG image
IMG_1618.JPG JPG image
IMG_1620.JPG JPG image
IMG_1614.JPG JPG image
IMG_1601.JPG JPG image
IMG_1602.JPG JPG image
IMG_1594.JPG JPG image
IMG_1586.JPG JPG image
IMG_1574.JPG JPG image
HC102821R00180001.pdf PDF
IMG_1622.JPG JPG image
IMG_1619.JPG JPG image
IMG_1610.JPG JPG image
IMG_1604.JPG JPG image
IMG_1603.JPG JPG image
IMG_1600.JPG JPG image
IMG_1595.JPG JPG image
IMG_1598.JPG JPG image
IMG_1587.JPG JPG image
IMG_1580.JPG JPG image
IMG_1624.JPG JPG image
IMG_1626.JPG JPG image
IMG_1625.JPG JPG image
IMG_1616.JPG JPG image
IMG_1612.JPG JPG image
IMG_1611.JPG JPG image
IMG_1606.JPG JPG image
Appendix C - Pump Submittal Example.pdf PDF
Appendix B - DISA Electrical Master Drawing (FOUO).pdf PDF
Appendix N - SEC Inventory and EPL Format.xls XLS spreadsheet
Appendix D - Pump Specification.docx DOCX document
Appendix K - San Antonio Building Layout (FOUO).pdf PDF
Appendix O - SEC Process.xlsx XLSX spreadsheet
HC102821R0018.pdf PDF
encl 4_qasp - SAT CW Filtration and Upgrades.pdf PDF
Appendix J - Labeling Specification.docx DOCX document
Appendix R - Temporary Chiller Connection Point Drawing.pdf PDF
Appendix G - ASHRAE Standard 202 - 2013.pdf PDF
Appendix E - VFD Specification.docx DOCX document
HC102821R0018-CLIN Pricing Worksheet.xlsx XLSX spreadsheet
Show all 50

Condenser Water Filtration System Upgrade has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .