About this file
Written by GovTribe AI
· Dec 28, 2023
This document outlines a request for proposal for upgrading a condenser water filtration system at a Defense Information Systems Agency facility in San Antonio, Texas. The contractor will be required to enhance cooling towers, replace piping, adjust water pumps and filtration controls, and provide temporary chillers for redundancy testing. A site visit will be held on March 31, 2021 to allow contractors to better understand the work location and requirements. Questions are due by April 9, 2021 and should be directed to the email address provided. The goal of the project is to improve system reliability, energy use, and redundancy in accordance with Department of Defense standards.
Other files for this federal contract opportunity
Other files attached to Condenser Water Filtration System Upgrade, newest first.
File
Type
Posted
HC102821R0018-Final Revised CLIN Pricing Worksheet_DP.xlsx
XLSX spreadsheet
Sep 14, 2021
HC102821R00180009.pdf
PDF
Sep 9, 2021
QandA.xlsx
XLSX spreadsheet
Sep 9, 2021
HC102821R00180007.pdf
PDF
Aug 19, 2021
HC102821R0018-New CLIN Pricing Worksheet.xlsx
XLSX spreadsheet
Jul 30, 2021
HC102821R00180005.pdf
PDF
Jun 25, 2021
HC102821R00180003.pdf
PDF
Apr 21, 2021
eHTX-0090-ICWT-Independent-Testing.pdf_safe.pdf
PDF
Apr 16, 2021
HC102821R00180002.pdf
PDF
Apr 16, 2021
Q and A on Water Filtration Upgrade.xlsx
XLSX spreadsheet
Apr 16, 2021
IMG_1622.JPG
JPG image
Apr 6, 2021
IMG_1619.JPG
JPG image
Apr 6, 2021
IMG_1610.JPG
JPG image
Apr 6, 2021
IMG_1604.JPG
JPG image
Apr 6, 2021
IMG_1603.JPG
JPG image
Apr 6, 2021
IMG_1600.JPG
JPG image
Apr 6, 2021
IMG_1595.JPG
JPG image
Apr 6, 2021
IMG_1598.JPG
JPG image
Apr 6, 2021
IMG_1587.JPG
JPG image
Apr 6, 2021
IMG_1580.JPG
JPG image
Apr 6, 2021
IMG_1624.JPG
JPG image
Apr 6, 2021
IMG_1626.JPG
JPG image
Apr 6, 2021
IMG_1625.JPG
JPG image
Apr 6, 2021
IMG_1616.JPG
JPG image
Apr 6, 2021
IMG_1612.JPG
JPG image
Apr 6, 2021
IMG_1611.JPG
JPG image
Apr 6, 2021
IMG_1606.JPG
JPG image
Apr 6, 2021
IMG_1605.JPG
JPG image
Apr 6, 2021
IMG_1608.JPG
JPG image
Apr 6, 2021
IMG_1597.JPG
JPG image
Apr 6, 2021
IMG_1591.JPG
JPG image
Apr 6, 2021
IMG_1592.JPG
JPG image
Apr 6, 2021
IMG_1588.JPG
JPG image
Apr 6, 2021
IMG_1584.JPG
JPG image
Apr 6, 2021
IMG_1582.JPG
JPG image
Apr 6, 2021
IMG_1579.JPG
JPG image
Apr 6, 2021
IMG_1576.JPG
JPG image
Apr 6, 2021
IMG_1623.JPG
JPG image
Apr 6, 2021
Appendix B - DISA Electrical Master Drawing (FOUO).pdf
PDF
Mar 12, 2021
Appendix N - SEC Inventory and EPL Format.xls
XLS spreadsheet
Mar 12, 2021
Appendix D - Pump Specification.docx
DOCX document
Mar 12, 2021
Appendix K - San Antonio Building Layout (FOUO).pdf
PDF
Mar 12, 2021
Appendix O - SEC Process.xlsx
XLSX spreadsheet
Mar 12, 2021
HC102821R0018.pdf
PDF
Mar 12, 2021
encl 4_qasp - SAT CW Filtration and Upgrades.pdf
PDF
Mar 12, 2021
Appendix J - Labeling Specification.docx
DOCX document
Mar 12, 2021
Appendix R - Temporary Chiller Connection Point Drawing.pdf
PDF
Mar 12, 2021
Appendix G - ASHRAE Standard 202 - 2013.pdf
PDF
Mar 12, 2021
Appendix E - VFD Specification.docx
DOCX document
Mar 12, 2021
HC102821R0018-CLIN Pricing Worksheet.xlsx
XLSX spreadsheet
Mar 12, 2021
Show all 50
Condenser Water Filtration System Upgrade has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
Download the original file
Contacts named in this file
Similar government files
Ask GovTribe AI about this file
File details come from the government source that posted it.
Updated Apr 6, 2021 .