eHTX-0090-ICWT-Independent-Testing.pdf_safe.pdf

PDF 227 KB Posted

Attached to
Condenser Water Filtration System Upgrade Federal contract opportunity
Solicitation number
HC102821R0018
Issued by
Defense Information Systems Agency

About this file

This request for proposal is for upgrading the condenser water filtration, controls and piping system at the Defense Information Systems Agency facility in San Antonio, Texas. The contractor will enhance the cooling towers, replace piping, adjust the water pump, run temporary chillers for redundancy testing, and adjust the water filtration controls. The project is working on the IT mechanical system separately from the building mechanical system. A site visit is scheduled for March 31, 2021 with two sessions for contractors to better understand the work requirements. Questions are due by April 9, 2021 to mark.e.kraft2.civ@mail.mil. The Defense Information Systems Agency is the issuing agency.

View the file

Other files for this federal contract opportunity

Other files attached to Condenser Water Filtration System Upgrade, newest first.
File Type Posted
HC102821R0018-Final Revised CLIN Pricing Worksheet_DP.xlsx XLSX spreadsheet
HC102821R00180009.pdf PDF
QandA.xlsx XLSX spreadsheet
HC102821R00180007.pdf PDF
HC102821R0018-New CLIN Pricing Worksheet.xlsx XLSX spreadsheet
HC102821R00180005.pdf PDF
HC102821R00180003.pdf PDF
HC102821R00180002.pdf PDF
Q and A on Water Filtration Upgrade.xlsx XLSX spreadsheet
IMG_1624.JPG JPG image
IMG_1626.JPG JPG image
IMG_1625.JPG JPG image
IMG_1616.JPG JPG image
IMG_1612.JPG JPG image
IMG_1611.JPG JPG image
IMG_1606.JPG JPG image
IMG_1605.JPG JPG image
IMG_1608.JPG JPG image
IMG_1597.JPG JPG image
IMG_1591.JPG JPG image
IMG_1592.JPG JPG image
IMG_1588.JPG JPG image
IMG_1584.JPG JPG image
IMG_1582.JPG JPG image
IMG_1579.JPG JPG image
IMG_1576.JPG JPG image
IMG_1623.JPG JPG image
IMG_1621.JPG JPG image
IMG_1622.JPG JPG image
IMG_1619.JPG JPG image
IMG_1610.JPG JPG image
IMG_1604.JPG JPG image
IMG_1603.JPG JPG image
IMG_1600.JPG JPG image
IMG_1595.JPG JPG image
IMG_1598.JPG JPG image
IMG_1587.JPG JPG image
IMG_1580.JPG JPG image
encl 4_qasp - SAT CW Filtration and Upgrades.pdf PDF
Appendix J - Labeling Specification.docx DOCX document
Appendix R - Temporary Chiller Connection Point Drawing.pdf PDF
Appendix G - ASHRAE Standard 202 - 2013.pdf PDF
Appendix E - VFD Specification.docx DOCX document
HC102821R0018-CLIN Pricing Worksheet.xlsx XLSX spreadsheet
Appendix B - DISA Electrical Master Drawing (FOUO).pdf PDF
Appendix N - SEC Inventory and EPL Format.xls XLS spreadsheet
Appendix D - Pump Specification.docx DOCX document
Appendix K - San Antonio Building Layout (FOUO).pdf PDF
Appendix O - SEC Process.xlsx XLSX spreadsheet
HC102821R0018.pdf PDF
Show all 50

Condenser Water Filtration System Upgrade has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Filtration Test completed on Lakos Separator Model: eHTX-0090-V

The filter assembly was installed with test components defined as follows:

1) 3” turbine-type flow meter

2) 20 micron disc filter assembly

3) 4” pipe spool with sand-injection pump

4) 3” pipe spool

5) Separator under test

6) 3” pipe spool

7) 20 micron disc filter assembly

Test Conditions: 200 US gpm, 11.4 psi loss

Test Date: August 1, 2012

Joe C. Oliphant Hydraulics Lab Manager

Media Sample 45-75 micron: 75 grams

Media: Quartz, specific gravity: 2.6, Silicon Dioxide by Powder Technology Inc

Media Recovery From downstream filters: 1.0 grams

Filter Efficiency 74.0 / 75.0 = 98.7%

File details come from the government source that posted it. Updated .