This document outlines a request for proposal for upgrading a condenser water filtration system at a Defense Information Systems Agency facility in San Antonio, Texas. The contractor will be required to enhance cooling towers, replace piping, adjust water pumps and filtration controls, and provide temporary chillers for redundancy testing. A site visit will be held on March 31, 2021 to allow contractors to better understand the work location and requirements. Questions are due by April 9, 2021 and should be directed to the email provided. The goal of the project is to improve system reliability, energy use, and redundancy in line with Department of Defense standards.
Other files for this federal contract opportunity
Other files attached to Condenser Water Filtration System Upgrade, newest first.
File
Type
Posted
HC102821R00180010.pdf
PDF
Sep 14, 2021
Updated HC102821R0018-PaymentPlan.xlsx
XLSX spreadsheet
Sep 9, 2021
HC102821R00180008.pdf
PDF
Aug 31, 2021
QandA on WaterFiltration Upgrade.xlsx
XLSX spreadsheet
Aug 10, 2021
HC102821R00180006.pdf
PDF
Jul 30, 2021
HC102821R0018-Payment Plan.xlsx
XLSX spreadsheet
Jul 30, 2021
HC102821R0018-Revised CLIN Pricing Worksheet.xlsx
XLSX spreadsheet
Jun 11, 2021
HC102821R00180004.pdf
PDF
Jun 11, 2021
Appendix R - Temporary Chiller Connection Point Drawing V2.pdf
PDF
Apr 21, 2021
183144S-eTCX-0210-SRV.pdf
PDF
Apr 16, 2021
IMG_1627.JPG
JPG image
Apr 6, 2021
IMG_1618.JPG
JPG image
Apr 6, 2021
IMG_1620.JPG
JPG image
Apr 6, 2021
IMG_1614.JPG
JPG image
Apr 6, 2021
IMG_1601.JPG
JPG image
Apr 6, 2021
IMG_1602.JPG
JPG image
Apr 6, 2021
IMG_1594.JPG
JPG image
Apr 6, 2021
IMG_1586.JPG
JPG image
Apr 6, 2021
IMG_1574.JPG
JPG image
Apr 6, 2021
HC102821R00180001.pdf
PDF
Apr 6, 2021
IMG_1617.JPG
JPG image
Apr 6, 2021
IMG_1613.JPG
JPG image
Apr 6, 2021
IMG_1615.JPG
JPG image
Apr 6, 2021
IMG_1599.JPG
JPG image
Apr 6, 2021
IMG_1596.JPG
JPG image
Apr 6, 2021
IMG_1590.JPG
JPG image
Apr 6, 2021
IMG_1589.JPG
JPG image
Apr 6, 2021
IMG_1585.JPG
JPG image
Apr 6, 2021
IMG_1583.JPG
JPG image
Apr 6, 2021
IMG_1578.JPG
JPG image
Apr 6, 2021
IMG_1572.JPG
JPG image
Apr 6, 2021
IMG_1577.JPG
JPG image
Apr 6, 2021
IMG_1575.JPG
JPG image
Apr 6, 2021
IMG_1573.JPG
JPG image
Apr 6, 2021
IMG_1609.JPG
JPG image
Apr 6, 2021
IMG_1581.JPG
JPG image
Apr 6, 2021
IMG_1593.JPG
JPG image
Apr 6, 2021
IMG_1607.JPG
JPG image
Apr 6, 2021
Appendix C - Pump Submittal Example.pdf
PDF
Mar 12, 2021
Appendix A - Mechanical Drawing Set (FOUO).pdf
PDF
Mar 12, 2021
Appendix Q - Contractor NDA.docx
DOCX document
Mar 12, 2021
Appendix P - Electrical Safety Program.pdf
PDF
Mar 12, 2021
Appendix L - 2018 BAS Drawings (FOUO).pdf
PDF
Mar 12, 2021
Appendix M - Sample MOP Detail.docx
DOCX document
Mar 12, 2021
Appendix H - Temporary Chiller Submittal Example.pdf
PDF
Mar 12, 2021
Appendix B - DISA Electrical Master Drawing (FOUO).pdf
PDF
Mar 12, 2021
Appendix N - SEC Inventory and EPL Format.xls
XLS spreadsheet
Mar 12, 2021
Appendix D - Pump Specification.docx
DOCX document
Mar 12, 2021
Appendix K - San Antonio Building Layout (FOUO).pdf
PDF
Mar 12, 2021
Appendix O - SEC Process.xlsx
XLSX spreadsheet
Mar 12, 2021
Show all 50
Condenser Water Filtration System Upgrade has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
Download the original file
Contacts named in this file
Similar government files
Ask GovTribe AI about this file
File details come from the government source that posted it.
Updated Apr 6, 2021 .