About this file
Written by GovTribe AI
· Dec 28, 2023
This document outlines a request for proposal for upgrading a condenser water filtration system at a Defense Information Systems Agency facility in San Antonio, Texas. The contractor will be required to enhance cooling towers, replace piping, adjust water pumps and filtration controls, and provide temporary chillers for redundancy testing. A site visit will be held on March 31, 2021 for potential offerors to better understand the work location and requirements. Questions are due by April 9, 2021 and should be directed to the email provided. The project concerns only the IT mechanical system and not the overall building system.
Other files for this federal contract opportunity
Other files attached to Condenser Water Filtration System Upgrade, newest first.
File
Type
Posted
HC102821R00180009.pdf
PDF
Sep 9, 2021
QandA.xlsx
XLSX spreadsheet
Sep 9, 2021
HC102821R00180008.pdf
PDF
Aug 31, 2021
HC102821R00180007.pdf
PDF
Aug 19, 2021
HC102821R00180003.pdf
PDF
Apr 21, 2021
Appendix R - Temporary Chiller Connection Point Drawing V2.pdf
PDF
Apr 21, 2021
HC102821R00180002.pdf
PDF
Apr 16, 2021
Q and A on Water Filtration Upgrade.xlsx
XLSX spreadsheet
Apr 16, 2021
IMG_1624.JPG
JPG image
Apr 6, 2021
IMG_1626.JPG
JPG image
Apr 6, 2021
IMG_1625.JPG
JPG image
Apr 6, 2021
IMG_1616.JPG
JPG image
Apr 6, 2021
IMG_1612.JPG
JPG image
Apr 6, 2021
IMG_1611.JPG
JPG image
Apr 6, 2021
IMG_1606.JPG
JPG image
Apr 6, 2021
IMG_1605.JPG
JPG image
Apr 6, 2021
IMG_1608.JPG
JPG image
Apr 6, 2021
IMG_1597.JPG
JPG image
Apr 6, 2021
IMG_1591.JPG
JPG image
Apr 6, 2021
IMG_1592.JPG
JPG image
Apr 6, 2021
IMG_1588.JPG
JPG image
Apr 6, 2021
IMG_1584.JPG
JPG image
Apr 6, 2021
IMG_1582.JPG
JPG image
Apr 6, 2021
IMG_1579.JPG
JPG image
Apr 6, 2021
IMG_1576.JPG
JPG image
Apr 6, 2021
IMG_1623.JPG
JPG image
Apr 6, 2021
IMG_1621.JPG
JPG image
Apr 6, 2021
IMG_1617.JPG
JPG image
Apr 6, 2021
IMG_1613.JPG
JPG image
Apr 6, 2021
IMG_1615.JPG
JPG image
Apr 6, 2021
IMG_1599.JPG
JPG image
Apr 6, 2021
IMG_1596.JPG
JPG image
Apr 6, 2021
IMG_1590.JPG
JPG image
Apr 6, 2021
IMG_1589.JPG
JPG image
Apr 6, 2021
IMG_1585.JPG
JPG image
Apr 6, 2021
IMG_1583.JPG
JPG image
Apr 6, 2021
IMG_1578.JPG
JPG image
Apr 6, 2021
IMG_1572.JPG
JPG image
Apr 6, 2021
IMG_1577.JPG
JPG image
Apr 6, 2021
IMG_1575.JPG
JPG image
Apr 6, 2021
IMG_1573.JPG
JPG image
Apr 6, 2021
encl 4_qasp - SAT CW Filtration and Upgrades.pdf
PDF
Mar 12, 2021
Appendix J - Labeling Specification.docx
DOCX document
Mar 12, 2021
Appendix R - Temporary Chiller Connection Point Drawing.pdf
PDF
Mar 12, 2021
Appendix G - ASHRAE Standard 202 - 2013.pdf
PDF
Mar 12, 2021
Appendix E - VFD Specification.docx
DOCX document
Mar 12, 2021
HC102821R0018-CLIN Pricing Worksheet.xlsx
XLSX spreadsheet
Mar 12, 2021
Appendix A - Mechanical Drawing Set (FOUO).pdf
PDF
Mar 12, 2021
Appendix Q - Contractor NDA.docx
DOCX document
Mar 12, 2021
Appendix P - Electrical Safety Program.pdf
PDF
Mar 12, 2021
Show all 50
Condenser Water Filtration System Upgrade has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
Download the original file
Contacts named in this file
Similar government files
Ask GovTribe AI about this file
File details come from the government source that posted it.
Updated Apr 6, 2021 .