Updated HC102821R0018-PaymentPlan.xlsx

XLSX spreadsheet 15 KB Posted

Attached to
Condenser Water Filtration System Upgrade Federal contract opportunity
Solicitation number
HC102821R0018
Issued by
Defense Information Systems Agency

About this file

This document contains a payment plan template and solicitation for a condenser water filtration system upgrade project. The project involves upgrading the existing condenser water filtration, controls and piping system at a Defense Information Systems Agency facility in San Antonio, Texas. The contractor will enhance the cooling towers, replace piping, adjust the water pump, run temporary chillers for redundancy testing, and adjust the water filtration controls. The payment plan template outlines line items and scheduled payments for base work including mobilization, overhead support, submittals, equipment procurement, installation, testing and balance, and closeout. It also includes optional line items and payments for additional work. The solicitation provides an opportunity type, description of work required, agency information, and instructions for an optional site visit and questions deadline. The site visit will be offered on March 31, 2021 and questions are due by April 9, 2021.

View the file

Other files for this federal contract opportunity

Other files attached to Condenser Water Filtration System Upgrade, newest first.
File Type Posted
HC102821R00180009.pdf PDF
QandA.xlsx XLSX spreadsheet
HC102821R00180007.pdf PDF
HC102821R0018-New CLIN Pricing Worksheet.xlsx XLSX spreadsheet
HC102821R00180005.pdf PDF
HC102821R00180003.pdf PDF
HC102821R00180002.pdf PDF
Q and A on Water Filtration Upgrade.xlsx XLSX spreadsheet
eHTX-0090-ICWT-Independent-Testing.pdf_safe.pdf PDF
IMG_1624.JPG JPG image
IMG_1626.JPG JPG image
IMG_1625.JPG JPG image
IMG_1616.JPG JPG image
IMG_1612.JPG JPG image
IMG_1611.JPG JPG image
IMG_1606.JPG JPG image
IMG_1605.JPG JPG image
IMG_1608.JPG JPG image
IMG_1597.JPG JPG image
IMG_1591.JPG JPG image
IMG_1592.JPG JPG image
IMG_1588.JPG JPG image
IMG_1584.JPG JPG image
IMG_1582.JPG JPG image
IMG_1579.JPG JPG image
IMG_1576.JPG JPG image
IMG_1623.JPG JPG image
IMG_1621.JPG JPG image
IMG_1622.JPG JPG image
IMG_1619.JPG JPG image
IMG_1610.JPG JPG image
IMG_1604.JPG JPG image
IMG_1603.JPG JPG image
IMG_1600.JPG JPG image
IMG_1595.JPG JPG image
IMG_1598.JPG JPG image
IMG_1587.JPG JPG image
IMG_1580.JPG JPG image
encl 4_qasp - SAT CW Filtration and Upgrades.pdf PDF
Appendix J - Labeling Specification.docx DOCX document
Appendix R - Temporary Chiller Connection Point Drawing.pdf PDF
Appendix G - ASHRAE Standard 202 - 2013.pdf PDF
Appendix E - VFD Specification.docx DOCX document
HC102821R0018-CLIN Pricing Worksheet.xlsx XLSX spreadsheet
Appendix B - DISA Electrical Master Drawing (FOUO).pdf PDF
Appendix N - SEC Inventory and EPL Format.xls XLS spreadsheet
Appendix D - Pump Specification.docx DOCX document
Appendix K - San Antonio Building Layout (FOUO).pdf PDF
Appendix O - SEC Process.xlsx XLSX spreadsheet
HC102821R0018.pdf PDF
Show all 50

Condenser Water Filtration System Upgrade has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BASE (CLIN 0001)

Payment Plan HC1028-2X-X-XXXXBASE BID
ABCDE
Item #Work DescriptionScheduled AmountQuantityTotal
1Mobilization (paid as a lump sum for initial mobilization ($XX)1$ - 0
2Overhead support including travel (reoccurring for overhead $XX / month for 12 months)12$ - 0
3Submittals (paid as a lump sum for the complete submission and acceptance of all submittal items outlined in 6.1 of the PWS)1$ - 0
4Mechanical Equipment Procurement (paid for equipment in receipt of the manufacturer's paid invoice / local off site storage with inspection by government with a 1 week notice is authorized)1$ - 0
5Electrical Equipment Procurement (paid for equipment in receipt of the manufacturer's paid invoice / local off site storage with inspection by government with a 1 week notice is authorized)1$ - 0
6Installation (paid as a lump sum upon completion of the installation)4$ - 0
7Test and Balance per PWS 6.6 (paid as a lump sum upon completion)1$ - 0
8Close-out (paid lump sum upon completion and submission of all close out documentation, drawings, warranty information, site training and spare parts)1$ - 0

TOTALS: $ - 0 $ - 0

Optional CLIN 0003

Payment Plan HC1028-2X-X-XXXXOPTION 1
ABCDE
Item #Work DescriptionScheduled AmountQuantityTotal
1Mobilization (paid as a lump sum for initial mobilization ($XX)1$ - 0
2Overhead support including travel (reoccurring for overhead $XX / month for 12 months)12$ - 0
3Submittals (paid as a lump sum for the complete submission and acceptance of all submittal items outlined in 6.1 of the PWS)1$ - 0
4Equipment Procurement (paid for equipment in receipt of the manufacturer's paid invoice / local off site storage with inspection by government with a 1 week notice is authorized)1$ - 0
6Installation (paid as a lump sum upon completion of the installation)4$ - 0
8Close-out (paid lump sum upon completion and submission of all close out documentation, drawings, warranty information, site training and spare parts)1$ - 0

TOTALS: $ - 0 $ - 0

Optional CLIN 0004

OPPayment Plan HC1028-2X-X-XXXXOPTION 2
ABCDE
Item #Work DescriptionScheduled AmountQuantityTotal
1Mobilization (paid as a lump sum for initial mobilization ($XX)1$ - 0
2Overhead support including travel (reoccurring for overhead $XX / month for 12 months)12$ - 0
3Submittals (paid as a lump sum for the complete submission and acceptance of all submittal items outlined in 6.1 of the PWS)1$ - 0
4Mechanical Equipment Procurement (paid for equipment in receipt of the manufacturer's paid invoice / local off site storage with inspection by government with a 1 week notice is authorized)1$ - 0
5Electrical Equipment Procurement (paid for equipment in receipt of the manufacturer's paid invoice / local off site storage with inspection by government with a 1 week notice is authorized)1$ - 0
6Installation (paid as a lump sum upon completion of the installation)4$ - 0
7Test and Balance per PWS 6.6 (paid as a lump sum upon completion)1$ - 0
8Close-out (paid lump sum upon completion and submission of all close out documentation, drawings, warranty information, site training and spare parts)1$ - 0

TOTALS: $ - 0 $ - 0

File details come from the government source that posted it. Updated .