HC102821R0018-Payment Plan.xlsx

XLSX spreadsheet 12 KB Posted

Attached to
Condenser Water Filtration System Upgrade Federal contract opportunity
Solicitation number
HC102821R0018
Issued by
Defense Information Systems Agency

About this file

This document contains a payment plan sheet and solicitation for the Condenser Water Filtration System Upgrade project at the Defense Information Systems Agency facility in San Antonio, Texas. The solicitation requests proposals to upgrade the existing condenser water filtration, controls and piping system to improve reliability, energy use, and redundancy. Key work includes enhancing the cooling towers, replacing piping, adjusting the water pump, running temporary chillers for redundancy testing, and adjusting the water filtration controls. The payment plan outlines lump sum and recurring monthly payments for mobilization, overhead support, submittals, equipment procurement, installation, testing and balance, and closeout. The site visit is scheduled for March 31, 2021 with questions due by April 9, 2021.

View the file

Other files for this federal contract opportunity

Other files attached to Condenser Water Filtration System Upgrade, newest first.
File Type Posted
HC102821R00180010.pdf PDF
HC102821R0018-Final Revised CLIN Pricing Worksheet_DP.xlsx XLSX spreadsheet
Updated HC102821R0018-PaymentPlan.xlsx XLSX spreadsheet
QandA on WaterFiltration Upgrade.xlsx XLSX spreadsheet
HC102821R00180006.pdf PDF
HC102821R0018-New CLIN Pricing Worksheet.xlsx XLSX spreadsheet
HC102821R00180005.pdf PDF
183144S-eTCX-0210-SRV.pdf PDF
eHTX-0090-ICWT-Independent-Testing.pdf_safe.pdf PDF
IMG_1627.JPG JPG image
IMG_1618.JPG JPG image
IMG_1620.JPG JPG image
IMG_1614.JPG JPG image
IMG_1601.JPG JPG image
IMG_1602.JPG JPG image
IMG_1594.JPG JPG image
IMG_1586.JPG JPG image
IMG_1574.JPG JPG image
HC102821R00180001.pdf PDF
IMG_1622.JPG JPG image
IMG_1619.JPG JPG image
IMG_1610.JPG JPG image
IMG_1604.JPG JPG image
IMG_1603.JPG JPG image
IMG_1600.JPG JPG image
IMG_1595.JPG JPG image
IMG_1598.JPG JPG image
IMG_1587.JPG JPG image
IMG_1580.JPG JPG image
IMG_1624.JPG JPG image
IMG_1626.JPG JPG image
IMG_1625.JPG JPG image
IMG_1616.JPG JPG image
IMG_1612.JPG JPG image
IMG_1611.JPG JPG image
IMG_1606.JPG JPG image
IMG_1605.JPG JPG image
Appendix C - Pump Submittal Example.pdf PDF
Appendix B - DISA Electrical Master Drawing (FOUO).pdf PDF
Appendix N - SEC Inventory and EPL Format.xls XLS spreadsheet
Appendix D - Pump Specification.docx DOCX document
Appendix K - San Antonio Building Layout (FOUO).pdf PDF
Appendix O - SEC Process.xlsx XLSX spreadsheet
HC102821R0018.pdf PDF
encl 4_qasp - SAT CW Filtration and Upgrades.pdf PDF
Appendix J - Labeling Specification.docx DOCX document
Appendix R - Temporary Chiller Connection Point Drawing.pdf PDF
Appendix G - ASHRAE Standard 202 - 2013.pdf PDF
Appendix E - VFD Specification.docx DOCX document
HC102821R0018-CLIN Pricing Worksheet.xlsx XLSX spreadsheet
Show all 50

Condenser Water Filtration System Upgrade has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Payment Plan HC1028-2X-X-XXXX
ABCDE
Item #Work DescriptionScheduled AmountQuantityTotal
1Mobilization (paid as a lump sum for initial mobilization ($XX)1$ - 0
2Overhead support including travel (reoccurring for overhead $XX / month for 12 months)12$ - 0
3Submittals (paid as a lump sum for the complete submission and acceptance of all submittal items outlined in 6.1 of the PWS)1$ - 0
4Mechanical Equipment Procurement (paid for equipment in receipt of the manufacturer's paid invoice / local off site storage with inspection by government with a 1 week notice is authorized)1$ - 0
5Electrical Equipment Procurement (paid for equipment in receipt of the manufacturer's paid invoice / local off site storage with inspection by government with a 1 week notice is authorized)1$ - 0
6Installation (paid as a lump sum upon completion of the installation)4$ - 0
7Test and Balance per PWS 6.6 (paid as a lump sum upon completion)1$ - 0
8Close-out (paid lump sum upon completion and submission of all close out documentation, drawings, warranty information, site training and spare parts)1$ - 0

TOTALS: $ - 0 $ - 0

File details come from the government source that posted it. Updated .