183144S-eTCX-0210-SRV.pdf

PDF 159 KB Posted

Attached to
Condenser Water Filtration System Upgrade
Solicitation number
HC102821R0018
Issued by

About this file

This request for proposal from the Defense Information Systems Agency solicits bids to upgrade the condenser water filtration, controls and piping system at their facility in San Antonio, Texas. The contractor will be required to enhance the cooling towers, replace piping, adjust the water pump, run temporary chillers for redundancy testing and adjust the water filtration controls. A site visit will be offered on March 31st, 2021 with two sessions for contractors to better understand the work. Questions must be submitted in writing by April 9th, 2021.

View the file

Other files

File Type Posted
HC102821R00180010.pdf PDF
HC102821R0018-Final Revised CLIN Pricing Worksheet_DP.xlsx XLSX spreadsheet
Updated HC102821R0018-PaymentPlan.xlsx XLSX spreadsheet
HC102821R00180009.pdf PDF
QandA.xlsx XLSX spreadsheet
HC102821R00180008.pdf PDF
HC102821R00180007.pdf PDF
QandA on WaterFiltration Upgrade.xlsx XLSX spreadsheet
HC102821R00180006.pdf PDF
HC102821R0018-New CLIN Pricing Worksheet.xlsx XLSX spreadsheet
HC102821R0018-Payment Plan.xlsx XLSX spreadsheet
HC102821R00180005.pdf PDF
HC102821R0018-Revised CLIN Pricing Worksheet.xlsx XLSX spreadsheet
HC102821R00180004.pdf PDF
HC102821R00180003.pdf PDF
Appendix R - Temporary Chiller Connection Point Drawing V2.pdf PDF
Q and A on Water Filtration Upgrade.xlsx XLSX spreadsheet
HC102821R00180002.pdf PDF
eHTX-0090-ICWT-Independent-Testing.pdf_safe.pdf PDF
IMG_1588.JPG JPG image
IMG_1608.JPG JPG image
IMG_1621.JPG JPG image
IMG_1623.JPG JPG image
IMG_1581.JPG JPG image
IMG_1619.JPG JPG image
IMG_1605.JPG JPG image
IMG_1616.JPG JPG image
IMG_1592.JPG JPG image
IMG_1609.JPG JPG image
IMG_1593.JPG JPG image
IMG_1607.JPG JPG image
IMG_1614.JPG JPG image
IMG_1584.JPG JPG image
IMG_1582.JPG JPG image
IMG_1586.JPG JPG image
IMG_1574.JPG JPG image
IMG_1622.JPG JPG image
IMG_1591.JPG JPG image
IMG_1604.JPG JPG image
IMG_1600.JPG JPG image
IMG_1595.JPG JPG image
IMG_1603.JPG JPG image
IMG_1618.JPG JPG image
IMG_1576.JPG JPG image
IMG_1594.JPG JPG image
IMG_1602.JPG JPG image
IMG_1627.JPG JPG image
IMG_1579.JPG JPG image
IMG_1611.JPG JPG image
IMG_1624.JPG JPG image
Show 40 more

Latest 50 of 95 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PAPER COPIES ARE UNCONTROLLED.

APPROVED ENGINEERING CHANGE ORDER (ECO).

ONLY BE INCORPORATED AS DIRECTED BY AN

MAINTAINED BY A CAD SYSTEM. CHANGES SHALL

THIS DRAWING HAS BEEN GENERATED AND IS

COMPONENT LIST:

1 ELECTRICAL CONTROL BOX 3/60/460V W/120V TRANSFORMER.

2 SEPARATOR: eHTX-0090-V.

3 PUMP: 7.5 HP CENTRIFUGAL, 1750 rpm, 3/60/460V.

4 INLET/OUTLET PRESSURE GAUGES: 0-160 psi, GLYCERIN-FILLED.

5 PURGE EQUIPMENT: SRV-833.

6 STRAINER, SUCTION DIFFUSER.

NOTES:

INLET IS 4" PIPE (125# ANSI FLANGED).1.

OUTLET IS 3" PIPE (GROOVED).2.

PURGE OUTLET IS 3/4" PIPE.3.

MAXIMUM PRESSURE: 150 psi (10.3 bar).4.

MAX FLUID OPERATING TEMPERATURE: 100ºF (37.8ºC).5.

SPECIFIED FLOW RATES:6.

BASIN SWEEPING- 210 gpm (48 m³/hr).

SIDE STREAM & CLOSED LOOP- 250 gpm (57 m³/hr).

FINISH: AS ASSEMBLED.7.

POWER REQUIREMENT: 3/60/460V. (CUSTOMER SPECIFIED)8.

NEMA 4X MOTOR STARTER ENCLOSURE WITH9.

SAFETY DISCONNECT AND H.O.A. SWITCH.

APPROXIMATE DRY WEIGHT: 1018 lbs (461 kg).10.

INLET/OUTLET VALVE KIT RECOMMENDED: SEE FACTORY.11.

MINIMUM PIPE FROM TOWER BASIN TO TC SYSTEM IS 4" PIPE.12.

FLOODED SUCTION REQUIRED.13.

SUBMITTAL DRAWING

This drawing is submitted for spatial consideration only. Do not pre-plumb to these dimensions.

FRESNO, CALIFORNIA

WWW.LAKOS.COM

FILTRATION SOLUTIONS ®

EXCEPT AS OTHERWISE PROVIDED BY CONTRACT, THIS

DRAWING AND SPECIFICATIONS SHALL NOT BE

REPRODUCED, COPIED OR USED AS THE BASIS FOR

MANUFACTURE OR SALE OF MATTER DEPICTED HEREIN

WITHOUT THE EXPRESSED WRITTEN PERMISSION OF THE

LAKOS CORPORATION, OR ITS ASSIGNEES.

2-5/8" 67

66-7/8" 1699

FRONT VIEW W/O STRAINER

3/4" 19 TYP

1" 25 TYP

1/2" 13 TYP

8-7/16" 214

19-3/8" 49236" 914

10-3/4" 273 13-1/4" 337

45" 1143

TOP VIEW

16-1/4" 413

FRONT VIEW PUMP & STRAINER

10-5/8" 270

FRONT VIEW ROTATED STRAINER (OPTIONAL)

CEE

PER LAKOS SPEC

AS ASSEMBLED 8/21/19

XYLEM PUMP

REVISION HISTORY

ZONE REV DESCRIPTION DATE APPROVED

01 SUBMITTAL DRAWING 8/21/19 ADJ

C

D

SH

REV.

D W

G N

O

UNLESS OTHERWISE SPECIFIED:

DIMENSIONS ARE IN: INCHES [mm]

DECIMALS

MATERIAL

FINISH

.XXX

.XXXX

TOLERANCES ARE:

FRACTIONS

± ±.XX

WORK ORDER

REVIEW

ENGR

SCALE

QTY. C

SIZE

APPROVALS1/4°

± .005

.0005 ±

.01 ±

ANGLES

DRAWN

ENGINEERED FOR:

TITLE

DATE

DWG NO.

EST. WT. SHEET

REV.

eTCX-0210-SRV/XYL, TC SYSTEM HI EFFICIENCY eHTX-0090, 3/60/460V

183144 01

1:10 1 OF 1

183144

MODEL NO.

B

A A

C

D

4 12

2 14 3

8/21/19ADJDO NOT SCALE DRAWING

1018 lb

1"

Sheet1
Drawing View2
Drawing View3
Drawing View5
Drawing View6

File details come from the government source that posted it. Updated .