FNWZ 21-0071 - Attachment E - Pricing Worksheet - Contractor.xlsx

XLSX spreadsheet 24 KB Posted

Attached to
Demo B6119
Solicitation number
FA466126Q0005
Issued by

About this file

This document is a Pricing Worksheet for a demolition contract (FNWZ 21-0071) at Dyess Air Force Base, Texas. The pricing breakdown is structured by construction division categories, with the primary focus on demolishing Building 6119, which has an approximate total square footage of 2,892. The project requires complete demolition of the building, including concrete slabs, foundations, sidewalks, drives, utilities, and associated structural and systems components such as HVAC units, electrical systems, plumbing fixtures, and roofing materials.

The pricing worksheet shows minimal cost entries, with only Divisions 1 and 3 having a nominal $1.00 allocation, representing 50% of estimated costs for each division. The contract is issued by the Department of the Air Force Global Strike Command, with a requirement for contractors to submit detailed pricing within two hours after the official bid time. The demolition scope encompasses comprehensive removal of building infrastructure down to three feet below existing grade elevation, including all associated site and systems dismantling.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

ATTACHMENT E
PRICE BREAKDOWN BY DIVISIONContractor:
Date:
Dyess AFB, TXNote: Due no later than 2 hours after official bid time.
FNWZ 21-0071Color Legend:Pricing AreasFormula Areas
Division Line Items Include the Items Below:
0001-Base Pricing, Item 1 – FNWZ 21-0071 – Demo Building 6119
CONTRACTOR PRICEDivision 1: typically bonds, general liability, builders risk, O&P
(529 Funds)LABORMATERIALEQUIPMENTSUBCONTRACTTOTAL% of EstNotes: If DB, typically includes design fees, geotechnical, CAD as-builts, materials testing, etc.
Division 1 - General Conditions$ 1.00$ - 0$ - 0$ - 0$ 1.0050.00%Notes: If Bid-Build, typically includes CAD as-builts, materials testing, superintendent, storage containers, vehicles, small tools, trash dumpsters, portable toilets, project signage,

bulletin board, plan sets, temporary fencing, cleanup, etc.

Division 2 - Existing Conditions$ - 0$ - 0$ - 0$ - 0$ - 00.00%Division 2: earthwork, asbestos abatement, selective building demolition, site grading, tree trimming & removal, termite treatment, seeding, etc.
Division 3 - Concrete$ 1.00$ - 0$ - 0$ - 0$ 1.0050.00%Division 3: basic concrete materials & methods, forms, accesssories, reinforcement, concrete placement & labor
Division 4 - Masonry$ - 0$ - 0$ - 0$ - 0$ - 00.00%Division 4: masonry, grout, labor
Division 5 - Metals$ - 0$ - 0$ - 0$ - 0$ - 00.00%Division 5: structural framing, metal deck & joists, cold-formed metal framing, ornamental metal, expansion control
Division 6 - Woods & Plastic$ - 0$ - 0$ - 0$ - 0$ - 00.00%Division 6: rough & finish carpentry, casework
Division 7 - Thermal/Moisture$ - 0$ - 0$ - 0$ - 0$ - 00.00%Division 7: dampproofing, waterproofing, thermal protection, roofing, flashing, roof specialties, fire & smoke protection, joint sealers
Division 8 - Doors & Windows$ - 0$ - 0$ - 0$ - 0$ - 00.00%Division 8: doors, frames, windows, entrances & storefronts, skylights, hardware, glazing
Division 9 - Finishes$ - 0$ - 0$ - 0$ - 0$ - 00.00%Division 9: metal support facilities, gypsum board, tile, ceilings, flooring, wall finishes, acoustical treatment, paints & coatings
Division 10 - Miscellaneous Specialties$ - 0$ - 0$ - 0$ - 0$ - 00.00%Division 10: visual display boards, grilles & screens, architectural louvers & vents, corner guards, access flooring, flagpoles, identification devices/signage
Division 12 - Furnishings$ - 0$ - 0$ - 0$ - 0$ - 00.00%Division 11: loading dock equipment, residential equipment
Division 15 - Plumbing & HVAC$ - 0$ - 0$ - 0$ - 0$ - 00.00%Division 12: manufactured casework
Division 16 - Electrical, Communication, & Fire Alarm$ - 0$ - 0$ - 0$ - 0$ - 00.00%Division 13: sound, vibration & seismic control, lightning protection, pre-engineered structures, swimming pools, hazardous material remediation, building automation & control,
100.00%Division 14: elevator and associated equipment
LABORMATERIALEQUIPMENTSUBCONTRACTTOTALDivision 15: building services piping, fire protection piping, plumbing fixtures & equipment, HVAC equipment, air distribution, HVAC instrumentation & controls, HVAC testing & balancing
0001-Base Pricing, Item 1 – FNWZ 21-0071 – Demo Building 6119 Totals:2.000.000.000.00$ 2.00Division 16: fire detection & alarms, wiring methods, electrical power, transmission & distribution, lighting, communications

Total Construction Cost: $ 2.00

File details come from the government source that posted it. Updated .