This document is an Asbestos Survey Report for Building 6119 located at 382 4th Avenue on Dyess Air Force Base in Texas, conducted by Enprotec / Hibbs & Todd, Inc. on August 12, 2025. The survey identified multiple suspect asbestos-containing materials (ACM) throughout the building, including painted concrete masonry unit blocks, carpet mastic, drywall gypsum board with texture, ceiling tiles, ceramic wall and floor tiles, and floor tile with black mastic. Laboratory analysis confirmed asbestos presence in drywall gypsum board with smooth texture and joint compound (2,300 sq. ft.) and floor tile with black mastic (2,220 sq. ft.), classified as Category II and Category I non-friable ACM respectively.
The report recommends that prior to demolition, all identified asbestos-containing materials must be abated by a qualified asbestos abatement contractor under professional monitoring. Additionally, the report suggests notifying all personnel about asbestos locations and recommends testing any unsampled suspect materials encountered during demolition activities. This survey supports the concurrent federal contract opportunity (Solicitation Number FA466126Q0005) for complete demolition of Building 6119, which involves removing the entire structure, including foundations, utilities, and associated infrastructure.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B6119 Demo RFQ COMBO Amendment 0003.pdf | ||
| FNWZ 21-0071 Demo B6119 QA Sheet - Final (12-11-2025).pdf | ||
| B6119 Demo RFQ COMBO Amendment 0002.pdf | ||
| Demo B6119 QA Sheet (12-10-2025).pdf | ||
| B6119 Demo RFQ COMBO Amendment 0001.pdf | ||
| FNWZ 21-0071 - Attachment E - Pricing Worksheet - Contractor.xlsx | XLSX spreadsheet | |
| FNWZ 21-0071 - Att E - AF Form 3064.xlsx | XLSX spreadsheet | |
| FNWZ 21-0071 - Att E - AF Form 3065.xlsx | XLSX spreadsheet | |
| FNWZ 21-0071 Demo 6119 DWGs.pdf | ||
| Wage Determination.pdf | ||
| B6119 Demo RFQ COMBO.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MACC SOW BLDG 6119
FNWZ 21-0071
CUI
4.3 Haul Route: Approved haul route is from the Tye Gate/Third Street to Avenue A to 4th Street to Bldg 6119.
The Contractor is required to use the Tye Gate for all access.
4.4 Refer to Attachment “B” – Specifications for additional project requirements.
4.5 The Contractor shall haul in topsoil & grass seed the area disturbed by demolition & former building/walks/drives/slab locations. Topsoil shall be a minimum of 4” thick over a compacted subgrade (95% standard proctor). All areas shall slope away from former building & drive locations; no ponding of water shall be allowed. Prepare topsoil for receiving of grass; refer to Specifications.
5.1. EXISTING AS-BUILTS: All available and relevant as-built drawings are provided by the Government as electronic copy on *.pdf Adobe formats, refer to Attachment “C”. All existing site, utility, facility conditions and dimensions shall be field verified by Contractor.
6.1 DIRECTION: The Contractor shall accept directions only from the Dyess AFB Contracting Officer (CO).
Requests or desires of the users or using agency made directly to the Contractor shall be immediately brought to the attention of the CO. Any changes to the project scope or other provisions of the SoW must be authorized in writing by the CO.
7.1 PRICING SCHEDULE: Refer to Attachment “D” – Pricing Schedule and Bid Schedule
8.0 PROGRESS SCHEDULE AND PROGRESS REPORT: Refer to Attachment "E"
MACC SOW Dyess AFB, Texas
Attachment “A” – Asbestos Report
Dyess Air Force Base Building 6119 382 4th Avenue
Dyess AFB, Texas
Table of Contents
EXECUTIVE SUMMARY
1.0 INTRODUCTION
1.1 Client/Facility Location
1.2 Scope of Work
1.3 Regulatory Standards
1.4 Field Methods
1.5 Assessment of Suspect ACBM
1.5.1 Classification of ACBM
1.5.2 Prioritization
1.6 Laboratory Methods
1.7 Response Actions
2.0 SURVEY FINDINGS
2.1 Laboratory Results
3.0 RECOMMENDATIONS
4.0 STANDARDS/LIMITATIONS
Tables:
Table 1, Suspect ACM Summary
Appendix A - Terminology Abbreviations/Definitions
Appendix B - Survey Documentation
Laboratory Reports
Appendix C - License Documentation
Inspector’s License Documents Laboratory’s License Documents
Dyess AFB, Bldg. to be Demoed, 382 4th Ave., Dyess AFB, Texas Job No. 8251 Asbestos Survey Page 1 August 2025
EXECUTIVE SUMMARY
Enprotec / Hibbs & Todd, Inc. (eHT) was authorized by Dyess Air Force Base (Dyess AFB) to perform an asbestos survey of the Building (Bldg.) to be Demoed, located at 382 4th Avenue (Ave.), Dyess AFB, Texas.
Based on the assessment results, the following suspect asbestos containing materials (ACM) homogeneous areas were identified:
• Painted Concrete Masonry Unit (CMU) Block, located in the interior of the bldg. on the perimeter walls throughout;
• Carpet Mastic (yellow), located in carpet areas throughout;
• Drywall Gypsum Board (DWGB) with Texture (orange peel) and Joint Compound, located on walls throughout in the east half of the bldg.;
• 12” Adhered Ceiling Tile with Mastic Buttons (brown), located in east half of bldg.;
• 4” Ceramic Wall Tile with Grout, located in the restrooms;
• 1” Ceramic Floor Tile with Grout, located in the restrooms;
• Suspended Acoustic Tile (SAT), located spotted throughout the east and west halves of the bldg.;
• DWGB with Texture (smooth) and Joint Compound, located on walls throughout in the west half of the bldg.;
• Brick Mortar, located on exterior veneer; and
• Floor Tile with Mastic (black), located under carpet throughout the bldg.
The Asbestos Survey was performed on August 12, 2025, by Donnie Windland, Asbestos Consultant, license number 105844, expiration date 09/10/26. Thirty (30) bulk samples of suspected asbestos containing building materials (ACBMs) were collected and submitted to the laboratory for analysis.
Based on the laboratory results, the following samples contained one percent (1%) or greater of asbestos and the represented material is considered ACBMs. If a homogeneous material has one or more samples that test positive for asbestos, then all samples for that homogeneous material, are considered ACM:
• 022, 023, 024 – DWGB with ACM Texture (smooth) and ACM Joint Compound, located on walls throughout in the west half of the bldg.; and
• 028, 029, 030 – ACM Floor Tile with ACM Mastic (black), located under carpet throughout the bldg.
Asbestos Survey Page 2 August 2025
The DWGB with ACM Texture (smooth) and ACM Joint Compound is classified as a Category II non-friable ACM in accordance with National Emission Standards for Hazardous Air Pollutants (NESHAP). There is a total of approximately 2,300 square feet (sq. ft.) of the DWGB with ACM Texture (smooth) and ACM Joint Compound, located on walls throughout in the west half of the bldg.
The ACM Floor Tile with ACM Mastic (black) is classified as a Category I non-friable ACM in accordance with NESHAP. There is a total of approximately 2,220 sq. ft. of the ACM Floor Tile with ACM Mastic (black), located under carpet throughout the bldg.
The laboratory reports are presented in Appendix B. A table presenting the laboratory results is presented in the Tables Section.
Enprotec / Hibbs & Todd, Inc. recommends the following actions:
• Prior to demolition or renovation activities, ACBMs in the areas to be disturbed should be abated by a qualified asbestos abatement contractor under monitoring and supervision of a qualified asbestos consultant.
• Tenants, employees, maintenance personnel, contractors, and others that could potentially disturb asbestos during the course of their duties should be notified of the presence and location of asbestos in accordance with Texas Department of State Health Services (TDSHS) Occupational Safety and Health Agency (OSHA) regulations, 25 Texas Administrative Code (TAC) 296.191 (A) and 29 Code of Federal Regulations (CFR) 1926.1101, respectively.
• Any suspect building materials not sampled in this assessment that are encountered during demolition activities should be sampled and tested for possible asbestos content by qualified personnel prior to continuation of demolition activities.
Asbestos Survey Page 3 August 2025
1.0 INTRODUCTION:
1.1 Client/Facility Location
eHT was authorized by Dyess AFB to perform an asbestos survey of the Bldg. to be Demoed, located at 382 4th Ave., Dyess AFB, Texas.
1.2 Scope of Work:
In general, the scope of work included the performance of an asbestos survey on all accessible suspect ACBMs associated with the materials of the bldg. that may be disturbed during any renovation or demolition activities. The inspection was performed on August 12, 2025.
1.3 Regulatory Standards:
This study was conducted based on the Final Rules for Asbestos Exposure in General Industry and Construction, issued August 10, 1994. An employer or owner may demonstrate that Presumed Asbestos Containing Material (PACM) (includes thermal system insulation, sprayed-on or troweled-on surfacing material and debris in work areas where such material is present) does not contain asbestos by having an inspection conducted pursuant to the requirements of Asbestos Hazard Emergency Response Act (AHERA) (40 CFR 763, Subpart E). Such tests shall include analysis of a minimum of three (3) bulk samples of each homogenous area of PACM collected in a randomly distributed manner. The tests, evaluation, and sample collection shall be performed by an accredited inspector or by a Certified Industrial Hygienist (CIH). The employer/building owner may demonstrate that flooring material, including associated mastic and backing, does not contain asbestos, based upon recognized analytical techniques (point counting) showing that the material is asbestos free (contains <1% of asbestos).
State and Federal regulations require an asbestos survey to be performed prior to renovation or demolition of a public or commercial building. Renovation and demolition will disturb building materials and the asbestos materials likely to be disturbed must be removed by a qualified (i.e., certified and licensed) asbestos abatement contractor under monitoring and supervision of a qualified asbestos consultant.
Asbestos Survey Page 4 August 2025
Federal and State regulations only allow asbestos material to remain in-place during demolition activities under certain circumstances. The circumstances are: 1) a building is declared to be structurally unsound and in danger of collapse; or 2) regulated materials are removed, leaving only certain non-friable materials in-place. Regulated asbestos-containing materials (RACMs) are ACMs that are friable or may become friable during demolition.
Materials that may remain in-place include gaskets, packings, and asphalt roofing materials that are not friable and are not in poor condition (Category 1 Non-Friable ACM), as well as other non-friable materials (Category II Non-Friable ACM) that do not have a high probability of becoming or have not already become crumbled, pulverized, or reduced to powder by forces expected to act on the Material in the course of demolition activities.
According to NESHAP [40 CFR 61.145(A)(3)], a building may be demolished with friable and non-friable ACMs in-place if the facility is being demolished under an order of a State or Local government agency, issued because the facility is structurally unsound and in danger of imminent collapse. Texas Asbestos Health Protection Rules (TAHPR) similarly stated in 25 TAC 296.251(o), “The judgement that a structure is in danger of imminent collapse or that it is unsafe for anyone to enter shall be made by a professional engineer, registered architect, or government official and as such the building would no longer meet the requirements of a public building” [25 TAC 296.21(74)(F)]. Leaving the ACMs requires the use of wet demolition techniques and proper disposal of all the resulting debris as asbestos waste.
1.4 Field Methods:
Prior to collecting bulk samples of suspect ACBM, distinct homogeneous sampling areas and specific sampling sites were defined. A homogeneous sample area can be defined as a material that is similar in appearance, color, and generally having the same episode of installation as surrounding alike material. Attempts were made in all cases to obtain representative samples of like materials, as this is the most cost-effective method for determination of ACBM. It should be assumed by the building owner, contractor, and the abatement contractors that the compositions of like materials in a single homogeneous area are the same.
Asbestos Survey Page 5 August 2025
As the suspect ACBM was located and identified, bulk samples were obtained and placed in labeled individual containers. The sample identification number on the containers directly corresponds with the numbers listed on the Chain-of-Custody (COC) and laboratory reports presented in Appendix B. In the event that during any renovation or demolition, any suspect material is encountered behind any walls or other areas that were not accessible at the time this survey was conducted, samples of these suspect materials should be collected and analyzed by qualified asbestos inspectors and laboratories, respectively.
1.5 Assessment of Suspect ACBM:
In accordance with AHERA (October 30, 1986), verified or assumed ACBM discovered in an inspection or reinspection of a facility shall be assessed in view of past, present, or future likelihood of disturbance and may include the following:
• Location of material present;
• Condition of material: type of damage; severity of damage; and the extent or spread of damage;
• Accessibility of the materials;
• Potential for disturbance of the material;
• Known or suspected causes of damage (i.e., air erosion, vandalism, service or repair, vibration, and water);
• Preventative measures which might eliminate the possibility of undamaged ACBM from being significantly damaged; and
• Actions to be taken to protect human health.
1.5.1 Classification of ACBM: Verified ACBM are classified into one of the following categories:
• Damaged ACBM thermal system insulation;
• Significantly damaged ACBM thermal system insulation;
• Damaged friable surfacing ACBM;
• Significantly damaged friable surfacing ACBM;
• Damaged friable miscellaneous ACBM;
Asbestos Survey Page 6 August 2025
• Significantly damaged friable miscellaneous ACBM;
• ACBM with potential for damage;
• ACBM with potential for significant damage; and
• Remaining ACBM not fitting into categories above.
ACBM is defined as friable if the material contains 1% or greater asbestos that, when dry, can be crumbled, pulverized, or reduced to powder by hand pressure.
Friable materials are more likely to become airborne, thereby increasing the potential for health hazards.
1.5.2 Prioritization: The ACBM is usually examined and prioritized according to condition, location, potential for damage, and potential or fiber release. The priorities are usually divided into the following categories:
• Low Hazard - Those non-friable materials in good condition with low potential for disturbance (L).
• Moderate Hazard - Those currently non-friable or friable materials in good physical condition that have a moderate potential for disturbance or damage to make them friable and release asbestos fibers into the air (M).
• High Hazard - Those friable or non-friable materials that have become friable in poor physical condition and/or likely to be disturbed by air currents, water damage, construction, or other activities which could distribute airborne asbestos fibers (H).
• Immediate Hazard - Those friable or non-friable materials that have become friable, that are significantly damaged, have released material, and/or are highly likely to expose unprotected persons (I).
1.6 Laboratory Methods:
A total of 30 bulk samples were collected from the facility and were analyzed. Polarized Light Microscopy (PLM) methods were utilized with dispersion-staining techniques according to US Environmental Protection Agency (EPA) Method EPA 600/R-93/116. This type of analysis requires the microscopist to take a portion of the bulk sample and treat it with a
Asbestos Survey Page 7 August 2025 special light-refractive oil emulsion stain. This prepared slide is then subjected to a variety of tests while being viewed under varying polarization of light.
Each type of asbestos is determined by visual estimation. Even though this is estimation, any material that contains 1% or greater than 1% of any type of asbestos using the PLM method is considered an ACBM and must be handled according to OSHA and EPA regulations, if disturbed.
Friable materials may be reanalyzed using the objective point counting method. (Asbestos NESHAP Revision Final Rule to CFR 61.141). The point counting method shall take precedent when different to the standard PLM method.
The samples were submitted to Moody Labs in Farmers Branch, Texas for analysis. This laboratory is a National Voluntary Laboratory Accreditation Program (NVLAP) accredited laboratory and licensed by the TDSHS.
1.7 Response Actions:
The following four (4) basic response actions are options for each type of ACBM:
• Operations and Maintenance - Requires maintenance of the material in an undamaged condition. This includes the repair or removal of damaged materials, record keeping, worker training, re-inspection, prevalent level air monitoring, and documentation in a comprehensive Operations and Maintenance Program (O&M) specific to the building.
• Encapsulation - Requires sealing of the exposed surface of the ACBM with a bridging-type encapsulant or conversion from a friable to non-friable status with penetrating type encapsulant. Encapsulation work must be conducted under conditions which control the release of asbestos fibers into the building areas.
• Enclosure - Requires isolation of the ACBM behind or within air-tight barriers of gypsum wallboard, plyboard, etc. Enclosure work must be conducted under conditions which control the release of asbestos fibers into the building areas.
• Removal - Requires removal and disposal of the ACBM under full asbestos abatement conditions by licensed asbestos abatement contractors.
Asbestos Survey Page 8 August 2025
2.0 Survey Findings:
The following findings are based on site investigations performed on August 12, 2025. This asbestos survey was performed in accordance with the Texas Asbestos Health Protection Rules, 25 TAC 296.191).
The following materials were identified as suspect ACBM or PACM:
• Painted CMU Block, located in the interior of the bldg. on the perimeter walls throughout;
• Carpet Mastic (yellow), located in carpet areas throughout;
• DWGB with Texture (orange peel) and Joint Compound, located on walls throughout in the east half of the bldg.;
• 12” Adhered Ceiling Tile with Mastic Buttons (brown), located in east half of bldg.;
• 4” Ceramic Wall Tile with Grout, located in the restrooms;
• 1” Ceramic Floor Tile with Grout, located in the restrooms;
• SAT, located spotted throughout the east and west halves of the bldg.;
• DWGB with Texture (smooth) and Joint Compound, located on walls throughout in the west half of the bldg.;
• Brick Mortar, located on exterior veneer; and
• Floor Tile with Mastic (black), located under carpet throughout the bldg.
Materials observed but were not suspected of containing asbestos were not sampled. The non-sampled materials included fiberglass insulation, metal products, glass materials, plastic products, rubber products, and wood materials. A table presenting a summary of the ACMs is presented as Table 1 in the Tables Section.
The facility was viewed at 382 4th Ave., Dyess AFB, Texas on August 12, 2025. A total of 30 bulk samples of suspected ACBM materials were collected at this location. The laboratory reports are presented in Appendix B.
2.1 Laboratory Results:
Based on the laboratory results, the following samples contained 1% or greater of asbestos and the represented material is considered ACBMs. If a homogeneous material has one or more samples that test positive for asbestos, then all samples for that homogeneous material, are considered ACM:
Asbestos Survey Page 9 August 2025
• 022, 023, 024 – DWGB with ACM Texture (smooth) and ACM Joint Compound, located on walls throughout in the west half of the bldg.; and
• 028, 029, 030 – ACM Floor Tile with ACM Mastic (black), located under carpet throughout the bldg.
The DWGB with ACM Texture (smooth) and ACM Joint Compound is classified as a Category II non-friable ACM in accordance with NESHAP. There is a total of approximately 2,300 sq. ft. of the DWGB with ACM Texture (smooth) and ACM Joint Compound, located on walls throughout in the west half of the bldg.
The ACM Floor Tile with ACM Mastic (black) is classified as a Category I non-friable ACM in accordance with NESHAP. There is a total of approximately 2,220 sq. ft. of the ACM Floor Tile with ACM Mastic (black), located under carpet throughout the bldg.
3.0 RECOMMENDATIONS:
• Prior to demolition or renovation activities, ACBMs in the areas to be disturbed should be abated by a qualified asbestos abatement contractor under monitoring and supervision of a qualified asbestos consultant.
• Tenants, employees, maintenance personnel, contractors, and others that could potentially disturb asbestos during the course of their duties should be notified of the presence and location of asbestos in accordance with TDSHS and OSHA regulations, 25 TAC 296.191 (A) and 29 CFR 1926.1101, respectively.
• Any suspect building materials not sampled in this assessment encountered during demolition activities should be sampled and tested for possible asbestos content by qualified personnel prior to continuation of demolition activities.
4.0 STANDARDS/LIMITATIONS:
The work performed, in conjunction with the data developed, is intended as a description of available information at the dates and locations given. This report does not warrant against future operations or conditions, nor does it warrant against operations or conditions present of a type or at a location not investigated.
Asbestos Survey Page 10 August 2025
Opinions and recommendations presented herein apply to site conditions existing at the time of our investigation and those reasonably foreseeable; they cannot necessarily apply to site changes of which eHT is not aware and has not had the opportunity to evaluate.
This report is designed to aid the building owner, architect, construction manager, general contractor, and potential abatement contractor in locating ACBM. Under no circumstances is this report to be used as a bidding document or a project specification document. Building material quantities are approximated and abatement contractors should quantify building materials for their use in bidding.
Reasonable efforts were made to obtain representative samples of building materials and have those materials analyzed for asbestos content. Materials or conditions which were not observed due to the survey conditions stated herein may differ from those documented in this report. Should suspect materials be discovered during building renovation/demolition that have not been addressed, bulk samples of the material should be collected and analyzed for asbestos content prior to renovation and/or demolition.
Our professional services have been performed, our findings obtained, and recommendations prepared in accordance with customary principles and practices in the fields of environmental science and engineering. This warranty is in lieu of all other warranties either expressed or implied.
eHT is not responsible for the independent conclusions, opinions, or recommendations made by others based on the field exploration and laboratory test data presented in this report.
MACC SOW Dyess AFB, Texas
Attachment “B” – Specifications
SPECIFICATIONS
FOR
DEMOLISH FACILITY 6119
PROJECT FNWZ 21-0071
SEPTEMBER 2024
PREPARED: 7 CES/CENMP: REVIEWED: 7 CONS/LGCA:
Date Signature Date Signature
Mr. Darian Flores Ms. Traci Hughes
PROJECT MANAGER CONTRACTING OFFICER
These specifications consist of the various parts and provisions listed in the Table of Contents below and all attachments thereto:
TABLE OF CONTENTS
DIVISION 00 & 01 - GENERAL REQUIREMENTS
00 01 02 SPECIAL CONDITIONS
00 01 03 UTILITIES
00 01 04 ENVIRONMENTAL
00 01 05 FLIGHT LINE
01 78 00 AS-BUILT DRAWINGS
01 78 23 OPERATION & MAINTENANCE DATA
DIVISION 02 - EXISTING CONDITIONS
02 41 00 DEMOLITION
DIVISION 31 – EARTH WORK
31 23 00 EXCAVATION & FILL
DIVISION 32 – EXTERIOR IMPROVEMENTS
32 16 13 CONCRETE SIDEWALKS, CURBS, AND GUTTERS
32 92 19 SEEDING
TOC
Section 00 01 02
SPECIAL CONDITIONS
Dyess AFB, Texas
FNWZ 21-0071
Special Conditions – Section 00 01 02 - page 1 of 8
PART 1 – GENERAL
1. SCOPE: The work covered by this project consists of the Contractor furnishing all layout, survey, plant, labor, supervision, quality control, materials, equipment, machines, tools, appliances, services, supplies, and incidentals and of performing all operations in connection with the construction contract requirement at Dyess AFB, Texas, complete and in strict accordance with the plans and specifications.
2. WORKING CONDITIONS: Contractor shall carefully consider the following when contemplating any specific task identified by the government reflecting any special or unusual conditions which may affect the Contractor's work such as:
- phasing requirements
- work area availability
- joint occupancy
- scheduling
- down time
- required notice requirements
- requirements for Contractor employees to enter secured work areas
- traffic control
- temporary heating/cooling
- required certificates prior to award
- required work plans
- any other special conditions
Above all, insure this item is properly coordinated and discussed in detail with the user/occupant.
3. WORK SCHEDULE: Working hours for the Contractor will normally be between the hours of 7:30 a.m. and 4:30 p.m. excluding Saturdays, Sundays, and Federal holidays. If the Contractor desires to work during periods other than above, additional government inspection forces may be required. The Contractor must make their request to the Contracting Officer five (5) calendar days in advance of their intention to work during other periods to allow assignment of additional inspection forces. If such force is reasonably available, the Contracting Officer may authorize the Contractor to perform work during periods other than normal duty hours/days.
3.1 DOWN TIME: Down time shall be defined as delays in excess of one hour at a given period, caused by the Government through no fault of the Contractor.
a. MEASUREMENT:
(1) Down time will be measured by the unit time-of-the-clock hour which will include all Contractor and sub-Contractor (at any tier) work forces scheduled for or working during the hour.
Dyess AFB, Texas
FNWZ 21-0071
Special Conditions – Section 00 01 02 - page 2 of 8
(2) No delays less than one hour in duration at any given period will be measured nor considered for down time, nor will delays of less than one hour be cumulative over several time periods.
(3) Down time will not be measured/considered for delays before or after contract work schedule hours as defined in the contract General Provisions.
(4) No time after 10 minutes from the time that Contractor is notified that he can resume work after a stoppage will be considered down time.
Contractor shall comply with all security requirements under paragraph 13 of this specification section to qualify for down time compensation.
b. PAYMENT: Payment for down time will be made at the contract unit price for down time as shown on the bid schedule in accordance with the Contact Clause entitled Payments Under Fixed Price Construction Contracts.
4. SAFETY AND HEALTH:
4.1 All Contractor operations shall be conducted and performed in accordance with Department of Labor, OSHA requirements found in 29 CFR 1910 and 29 CFR 1926, project identified national standards, military manuals, instructions, pamphlets, and standards and handbooks.
4.2 All companies who conduct business within the state of Texas must, in accordance with Texas Workman Compensation laws (Texas House Bill 62), have an approved company safety policy and an Accident Prevention Plan. The plan, approved by the Texas Workman Compensation Commission (TWCC), shall be submitted For Information Only (FIO) in accordance with paragraph SUBMITTAL REQUIREMENTS. In addition to meeting the TWCC requirements; the plan must also include the requirements of COE Safety Manual, latest edition.
4.3 All holes/pits/trenches/manway openings, etc, that are to be left open shall be surrounded with a 48 inch high mesh fence with highly visible orange plastic coating. The fence shall be securely anchored with tension wires and posts as required to prevent sagging and located a minimum of 3 feet from the opening so as to prevent an individual, should they fall across the fencing, from falling into the opening. Holes shall also be covered, when not being worked in, with three quarter inch plywood or a metal grating that will prevent small children from entering the hole. If the hole/pit is too large to cover, then a ladder of sufficient length shall remain in the hole/pit for egress.
4.4 Radiation Permits and Authorizations: Contractors contemplating the use of devices containing radioactive materials (i.e., soil moisture/density probes) or non-ionizing radiation producing equipment (radio frequency radiation emitters or lasers) while performing work on this contract must obtain written authorization/permit from the Dyess AFB Radiation Safety Officer (RSO), 7 MDG/OMRS/SGXB. To obtain the required authorization permit, an application to bring a radioactive device on Dyess AFB must be forwarded to 7 MDG/OMRS/SGXB, 697 Louisiana Loop, Dyess AFB, TX 79607-1367 (this is mailing address, physical address is 880 Third St.) or (325)696-2325 / 3289, at least 45 days prior to the anticipated use. Without the proper authorization, Contractors will not be allowed to bring these devices on base. Also, Contractor shall provide Bioenvironmental Engineering (7 MDG/OMRS/SGXB) a copy of contractor’s radioactive materials permit and training certificates, if radioactive material will be brought onto Dyess
AFB.
4.5 Confined Space Entry: All operations involving entry into confined spaces shall meet the requirements of OSHA 29 CFR 1910.146, AFMAN 91-203 Chapter 23, and specifically the following:
a. All entry supervisors, attendees, and confined space entrants shall have been properly trained in the
Dyess AFB, Texas
FNWZ 21-0071
Special Conditions – Section 00 01 02 - page 3 of 8 safety hazards, proper use of Personal Protective Equipment (PPE), entry procedures, and self-rescue.
Records of this training must be readily available.
c. All confined spaces shall be tested by a qualified person using a properly calibrated monitor for percent oxygen, lower explosive limit (LEL), and toxicity each time before entry and periodically during operations that have the potential to alter atmospheric conditions.
4.6 Additionally, other special considerations which may apply such as speed limits in MFH, vehicles with catalytic converters operating within 50' of aircraft, work being performed in explosives clear zones, equipment disposition in the Munitions Storage Area (MSA) during and after work hours, etc. For most conditions FAR 52.236-13 Accident Prevention, which Contracting will include by reference, will be sufficient. A paragraph on "Airfield Safety Precautions," DFARS 252.236-7005, should automatically be included by reference by Contracting in the General Provisions of applicable airfield construction contracts.
Verify the FAR references to avoid duplication. Resolve with Contracting if in doubt.
5. STREET CLOSINGS: (Use only when required)
5.1 One lane of traffic shall be maintained at all times unless otherwise approved in writing by the Contracting Officer.
5.2 Contractor shall provide 14-day advance written notice to Contracting Officer prior to any street closures to insure that Fire Department and Emergency personnel are notified.
5.3. The final street repair shall be completed within 14 days after the start of any street demolition for utility crossings or other purposes. Any part of the street returned to service prior to final repair shall be maintained smooth with hot-mix cold-lay surface course.
5.4 Special note to Designers: Utilities are covered under Section 00 01 03. Also, IAW 05 May 97 HQ ACC/CE policy; trenching and excavation of pavements will be curtailed to the maximum extent possible.
The recommended method for utility installations crossing streets, sidewalks, curbs, or gutters is trenchless boring or jacking. Excavations must be kept to an absolute minimum and used in those rare cases; such as repair of existing utility lines and solid obstructions, which preclude the use of boring technology. A separate special specification section is normally required for jacking and boring.
6. DISPOSITION OF WASTE, EXCESS, SCRAP, AND SALVAGE MATERIALS: The title to all waste, excess, scrap, and salvage materials generated as a direct result of this contract is vested in the Contractor
- unless specifically excepted below. Further (unless listed below in exceptions), these materials shall be disposed of off the Base by the Contractor in accordance with all applicable Federal, State, and Local Regulations. Following is a list of materials (Exceptions) that will be generated as a result of this contract and shall be turned-in to the Government at a location at Dyess AFB designated by the Contracting Officer:
Exceptions: Government will identify salvage in SOW/SOO for each project.
7. STORAGE AREA (I.E. TEMPORARY FIELD OFFICE, STAGING AREAS, TOOL/JOB SHACKS,
AND OTHER CONSTRUCTION FACILITIES): There are no Government furnished covered or secure storage areas. Limited on-base, off-site storage will be permitted on a space available basis. The location on Dyess AFB of the Contractor’s temporary field office, storage, and other construction buildings required temporarily in the performance of the work, shall require written approval of the Contracting Officer. Plans showing temporary field office, storage, and other construction buildings shall be submitted for approval (GA) of the Contracting Officer. Utilities at the storage area may or may not be available for Contractor use. The Government implies no responsibility for lost or stolen materials, equipment or tools, the security of which lies solely with the Contractor. Contractor shall keep their storage areas clean, neat and orderly
Dyess AFB, Texas
FNWZ 21-0071
Special Conditions – Section 00 01 02 - page 4 of 8 and will keep grass mowed to a maximum height of 4 inches. Temporary fencing used by the Contractor to delineate constructor sites shall be securely anchored with tension wires and posts as required to prevent sagging and an unsightly appearance. Fencing shall be maintained by the Contractor in this manner throughout the life of the contract. Due to high winds in West Texas, Contractor shall take every precaution to preclude trash from blowing off site.
7.1 CONSTRUCTION AREA & CONTRACTOR LIMITS OF CONSTRUCTION: Contractor shall keep their construction areas clean, neat and orderly and will keep grass mowed to a maximum height of 4 inches.
8. TOILET FACILITIES:
8.1 Use of existing toilet facilities if available will identified in SOO/SOW. Contractor personnel will ensure facility cleanliness is maintained at all times.
8.2 If not identified in the SOO/SOW, there are no toilet facilities available for Contractor use. Contractor shall provide his own portable/temporary toilet facilities.
9. CLEAN-UP: The Contractor shall at all times keep the construction site and storage area(s) free from accumulation of waste, rubbish, or construction debris. All loose or lightweight materials shall be secured to prevent blowing or scattering. The burning of trash or construction debris is strictly prohibited on Dyess AFB. Prior to final inspection, the Contractor shall remove all construction debris, tools, equipment, and materials not the property of the Government. Upon completion of the work, the Contractor shall leave the work site and storage area(s) in a clean, neat and workmanlike condition satisfactory to the Contracting Officer.
9.1 Additional requirements may be specified in the SOO/SOW such as special noise limitations, dust protection or existing equipment protection, etc.
10. INSPECTIONS:
A. Above Ceiling Inspection: The Contractor shall advise the Contracting Officer of the Contractor's desired above ceiling inspection date seven (7) calendar days in advance of that desired date to permit proper coordination.
B. Final Inspection: The Contractor shall advise the Contracting Officer of the Contractor's desired final inspection date seven (7) calendar days in advance of that desired date to permit proper coordination.
The date selected shall provide adequate time for Contractor performed corrections of final inspection deficiencies within the contract performance time. The Contracting Officer will be the final authority for determining whether or not the Contractor's performance is sufficiently advanced to warrant a final inspection.
11. TESTING: Costs of all tests, unless specifically indicated as being performed by the Government, will be at the Contractor's expense. It is the responsibility of the Contractor to schedule all tests and to notify the Contracting Officer or his representative in a timely manner prior to any required testing. All test results shall be submitted to the Contracting Officer on AF Form 3000, Material Approval Submittal.
12. AS-BUILT DRAWINGS, INSTRUCTION MANUALS, AND TRAINING:
12.1 As-Built Drawings: Refer to Section 01 78 00. The Contractor shall maintain two sets of project drawings for "as-built" notations and marking. The Contractor shall update these plans to indicate "as-built" construction and shall submit them to the Contracting Officer prior to final inspection under the cover of an AF Form 3000. Updated notations and markings shall be neat, clear, and legible in all respects.
12.2 INSTRUCTION MANUALS (O&M Data): Refer to Section 01 78 23. Required instruction
Dyess AFB, Texas
FNWZ 21-0071
Special Conditions – Section 00 01 02 - page 5 of 8 manual(s) shall be provided in three ring binder(s) with tabs and an index/table of contents. Provide permanent label on front and side with project title, project number, facility number, street address, Contractor/Subcontractor name, address, phone number(s), and manual title/contents description. Include all wiring diagrams and parts lists. Manuals shall be submitted to the Contracting Office for approval prior to Final Inspection.
12.3 TRAINING REQUIREMENTS: Provide training for government operating and service personnel in the proper operation of contractor furnished equipment. Schedule training time(s) with Contracting Officer to permit maximum participation by government personnel. Each instruction or training period shall be videoed by the Contractor and files will be submitted to the Government in WMV, MPEG, or MP-4 format on a CD/DVD. The video shall include the entire session(s). The original CD/DVD video(s) shall be labeled and turned over to the Contracting Officer shall be of a quality to enable clear and understandable playbacks of the recorded events.
13. SECURITY REQUIREMENTS:
Dyess AFB security may be viewed as being one of three broad levels, the level in effect being dependent on the location or AREA of Dyess AFB in question.
a. The lowest level of security exists in GENERAL ACCESS AREAS. These AREAS are all of Dyess AFB outside of the "USAF Controlled" and "USAF Restricted" AREAS.
b. USAF Controlled Access AREAS are the mid-level security AREAS. Presence within the CONTROLLED ACCESS AREA is by authorization; however, the movement of authorized personnel in and out of these AREAS is generally not impeded. Contractor personnel are given access to these AREAS.
c. The third and highest level of security on Dyess AFB is that within the USAF RESTRICTED AREAS. These AREAS are further subdivided to be known as Protection Level 1, 2 or 3 AREAS.
13.1 Referencing the above, the work on this contract will be identified in the SOO/SOW.
13.2 Requests for changes to the work schedule for work in USAF restricted areas, must be submitted a minimum of 7 calendar days in advance for approval and coordination of Dyess AFB Security Forces.
13.3 Dyess Air Force Base is a closed base. All personnel entering must have specific permission of the installation commander for entry. This permission is granted when a Contractor employee is issued an identification card. Information necessary to obtain identification cards will be provided by the Contracting Officer at the pre-performance conference. The Contractor shall be responsible to ensure that all of its employees obtain and keep on their person at all times while working on the base, a USAF identification card. Upon completion of the work or termination of an employee, the Contractor shall be responsible for turn in of identification cards no longer needed to the Contracting Officer or to the Pass and Registration Office of the Security Forces. Failure to turn in badges will result in last payment of payroll to be withheld and revocation of any future badges issued by Pass and Registration Office to the employee and the contractor.
14. IDENTIFICATION OF CONTRACTOR VEHICLES: Contractor vehicles must be marked on each side with company name with either permanent or semi-permanent / magnetic signage.
15. WARRANTIES: Any warranties given to the Contractor or sub-Contractor at any tier from a manufacturer of equipment or other items which are provided under this contract shall be transferred to the Government upon final acceptance. Contractor shall submit in writing a single listing with all applicable warranties attached.
Dyess AFB, Texas
FNWZ 21-0071
Special Conditions – Section 00 01 02 - page 6 of 8
16. SUBMITTALS:
16.1 Required Submittals: All submittals required by the Contract Documents shall be submitted for approval to the Contracting Officer. Use a completed AF Form 3000 as a transmittal document. Where a submittal cannot be provided within the required submission date, Contractor shall submit in writing a letter stating the reasons why and furnishing a new projected submission date. All Material Submittals (Form AF 3000) and all submittal data shall be submitted electronically. All pdf’s shall be created from original electronic documents, no scans allowed due to file size, unless otherwise approved.
16.2 Variations/Deviations/Departures from the Contract Documents: Contractor proposed variations, deviations or departures from the contract requirements shall be noted/marked in red on each copy of the submittal data and shall be provided with a letter attachment to the AF Form 3000 summarizing the proposed variation, deviation, or departure. Variations, deviations, or departures shall contain sufficient information to permit complete evaluation. Additional sheets may be used to fully explain why a variation, deviation, or departure is requested. The Government reserves the right to disapprove or rescind inadvertent approval of submittals containing unnoted/unmarked/not-clearly-defined variations, deviations or departures.
17. INSURANCE REQUIREMENTS
17.1 For the purpose of this FAR 52.228-5 the following minimum limits are provided:
17.2 Workmen’s Compensation and Employers Liability Insurance as required by law except if this contract is to be performed in a State which does not require or permit private insurance, then compliance with the statutory or administrative requirements in any such State will be satisfactory. The required Workmen’s Compensation insurance shall extend to cover employer’s liability for accidental bodily injury or death and for occupational disease with a minimum liability limit of $100,000.
17.3 General Liability Insurance. Bodily injury liability insurance, in the minimum limits of $500,000 per occurrence shall be required on the comprehensive form of policy.
17.4 Automobile Liability Insurance. This insurance shall be required on the comprehensive form of policy and shall provide bodily injury liability and property damage liability covering the operation of all
Dyess AFB, Texas
FNWZ 21-0071
Special Conditions – Section 00 01 02 - page 7 of 8 automobiles used in connection with the performance of the contract. At least the minimum limits of $200,000 per person and $500,000 per occurrence for bodily injury and $20,000 per occurrence for property damage shall be required.
18. INVESTIGATION OF DAMAGE OR INJURY
18.1 The United States Government will have the right to conduct an investigation, or participate in the contractor’s investigation, of any damage or injury to United States Government property, equipment or personnel.
19. CONTRACTOR RESPONSIBILITY
19.1 Contractors operating on base shall be responsible for briefing and ensuring their employees adhere to the traffic rules and regulations. The foreman, job supervisor, and other personnel providing workman leadership will, when possible, ensure the workers comply with these rules and regulations. Speed limit on base is 30 MPH unless otherwise posted. The speed limit in base housing areas is 20 MPH and the speed limit in parking lots is 5 MPH. The school zone speed limit is 5 MPH. Individuals are to obey all entry procedures. If instructions are given by the Security Forces personnel on the entry points (gates), they will be complied with immediately. Security Forces utilize speed detection devices and citations will be issued to violators. Personnel who park on grass or seeded areas will be cited.
20. CONSTRUCTION EQUIPMENT
20.1 Equipment and vehicles to be used on base shall be safe and in good operating condition. The Contracting Officer, or authorized representative, reserves the right to inspect any on-base equipment and reject such equipment if he/she considers it unsafe, in poor operating condition, or inappropriate for work.
Contractor must notify the Contracting Officer of any contractor equipment that is broken down on Dyess AFB roads. Every effort should be made to move broken down equipment to the nearest parking lot before leaving it.
20.2 Vehicle and Equipment Maintenance: Outdoor vehicle or equipment maintenance is a significant potential source of storm water pollution. Activities often include engine repair, changing fluids, etc.
Such activities shall be prohibited at the job site. The construction Contractor shall verify proofs on routine maintenance of construction equipment and vehicles before bringing them to the job site.
20.3 Vehicle and Equipment Parking: Vehicle or equipment shall be regularly inspected for leaks and scheduled routine maintenance to reduce the potential for leaks. If leaks are observed at the job site, such vehicle or equipment shall be repaired immediately or removed from the site.
21. GOVERNMENT LIABILITY
21.1 The Government shall not be liable for any loss or damage to the contractor’s property, including stock, or for expense incidental to such loss or damage.
22. TELEPHONE COMMUNICATION SECURITY MONITORING
22.1 All communications with DOD organizations are subject to communications security (COMSEC) review. Contractor personnel will be aware telephone communications networks are continually subject to intercept by unfriendly intelligence organizations. The DOD has authorized that military departments conduct COMSEC monitoring and recording of telephone calls originating from, or terminating at, DOD organizations. Therefore, civilian contractor personnel are advised any time they place a call to, or receive
Dyess AFB, Texas
FNWZ 21-0071
Special Conditions – Section 00 01 02 - page 8 of 8 a call from, a USAF organization, they are subject to COMSEC procedures. The contractor will assume the responsibility for ensuring wide and frequent dissemination of the above information to all employees.
**** END OF SECTION ****
Section 00 01 03
UTILITIES
Dyess AFB, Texas
FNWZ 21-0071
Utilities – Section 00 01 03 - page 1 of 4
PART 1 – GENERAL
1. SCOPE: This section covers identification, interruption and use of utilities.
2. IDENTIFICATION: THE GOVERNMENT DOES NOT KNOW THE EXACT LOCATION OF
UTILITIES IN THE WORK AREA. Accordingly, the Contractor shall be SOLELY RESPONSIBLE for locating and marking the exact location of all existing utilities within the contract work area prior to any excavating, trenching, backfilling or disturbance. The Contractor is SOLELY RESPONSIBLE for any and all damage to existing utilities in the contract work area. Upon request by the Contractor, the Government shall furnish all available information in its possession concerning utilities in the contract work area.
However, the accuracy of the information provided by the Government is not guaranteed and is only intended to provide some measure of assistance to the Contractor. The Contractor shall furnish to the Contracting Officer as-built drawings clearly identifying the exact location of all utilities identified in the work area prior to project final inspection.
2.1 Contractor must initiate a Work Clearance Request AF Form 103 (digging permit) from 7 CES/ CEPM a minimum of fourteen (14) calendar days prior to the start of any construction work. Excavation is not authorized without issuance of a completed and approved AF Form 103. After initial issue, it is the Contractor's responsibility to keep the Work Clearance Request coordinated and up-to-date/current through the remainder of the contract. Contractor shall mark their proposed digging locations with white spray paint PRIOR to submitting AF Form 103 for all utility digging/trenching, any building additions /expansions, new construction building foundations, etc. It is also the contractor’s responsibility to maintain the markings / flags throughout the construction process. Contractor shall mark existing utilities identified by the government with 2” wooden stakes with multicolored (match utility color) whiskers 4” to 6” in length; maintain stakes for the project duration.
The government field markings of utilities are not guaranteed & the contractor is required to physically locate the utility & avoid damaging. This is typically accomplished with a “pot hole machine” and is the sole responsibility of the contractor.
2.2 Any removal/relocation/reconnection of any communication device shall be coordinated in advance with 7 CS/SCOIT at 696-8065. Any removal/relocation/reconnection of any Cable TV device shall be also be coordinated in advance with 7 CS/SCOIT (ask for the NCOIC of Cable TV) at 696-2400.
Communications and Cable TV devices to remain shall be protected as required when work proximity dictates.
2.3 Any removal/relocation/reconnection of any fire protection device or intrusion detection systems shall be coordinated in advance with 7 CES/CEOFE at 696-5184. Any removal/relocation/reconnection of any security system should be coordinated with 7 SFS/S5C at 696-8523.
2.4 Exposed Existing Utilities: When existing utilities to remain are exposed, the Contractor shall contact the Contracting Officer and 7 CES Geobase Shop to survey any exposed utility line or feature below the surface. In addition, when new utility lines are installed or constructed, the Contractor shall contact the Contracting Officer and 7 CES Geobase Shop to survey all utility features below the surface. The Contracting Officer and 7 CES Geobase Shop must be contacted 5 days prior to the utility lines being back-filled. 7 CES Geobase Shop may be contacted at 325-696-5630. The Contractor will be responsible for any additional costs for exposing new utility lines that have not been surveyed by 7 CES Geobase Shop.
Dyess AFB, Texas
FNWZ 21-0071
Utilities – Section 00 01 03 - page 2 of 4
3. INTERRUPTIONS:
3.1 Planned Utility Outages: The Contractor shall coordinate all requests for utility outages with the Contracting Officer in writing fourteen (14) calendar days prior to date of requested outage. Water, gas, steam, sewer and electrical outages shall be held to a maximum duration of 2 hours unless otherwise approved in writing. See Contractor Request for Utility Outage included in this Section.
3.2 Unplanned Utility Outages…