This document is a Questions and Answers (Q&A) file for a demolition project at Dyess Air Force Base (AFB), specifically for building B6119. The project involves complete demolition of a facility, with key requirements including removing the building, driveway, and aprons, handling potential asbestos, and disposing of all construction and hazardous materials off-base. Contractors must provide performance and payment bonds, follow federal/state regulations for waste removal, and have personnel with appropriate state identification. No landfill is available on-base for debris disposal, and contractors are responsible for obtaining necessary materials, water, and handling waste management.

Notable project specifications include: no power available on-site, no additional drawings beyond demolition plans, transformer to be retained by government, no FOD control required, and no SHPO concerns. The submission must be a consolidated document, bid guarantees are required, and past performance documentation is optional. The contract is a service contract, and the Request for Quote (RFQ) will not necessarily be awarded 30 days after submission. Contractors must refer to the Statement of Work (SoW) for detailed specifications on hours of operation, permits, and other project-specific guidelines.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Dyess AFB

B6119 Demolition

Questions and Answers

1. Can I get the foundation Blueprints

a. Foundation Blueprints were provided in the SoW

2. Will the gentleman that did the asbestos test have an Asbestos removal plan that he would like for us to abide by or do you want us to have another person come out and advise us.

a. Contractor will have to find another person to come out and advise them for a removal plan

3. Can we get Original blueprints

a. Original blueprints are provided in the SoW

4. What are the hours of operations allowed on base?

a. Please refer to the specifications in the SoW for the hours of operations.

5. Will the driveway by the building need to be removed. As well as the apron and will that need to be filled back with a concrete slab?

a. Yes, driveway and aprons need to be removed, please refer to the DWGs

6. Does this solicitation require any bonds? Thank you!

a. Yes, a Performance bond and Payment bond is required.

7. What wages for Asbestos Handlers are we to assume for the project?

a. As wage rates can vary based on location, project type, and current market conditions, it is the contractor’s responsibility to research and determine the appropriate prevailing wages for your workforce.

8. Is the building on lands that have ever been a range, or is there any history of MEC/UXO found on site?

a. None to our knowledge.

9. Are there ancillary items to remain on the facility site?

a. There are no ancillary items to remain on site.

10. Are there any restrictions to recycling concrete?

a. No restrictions, contractor must follow federal/state regulations in removing concrete.

11. Can we assume there will be water available within 50 feet at no cost to the contractor?

a. Yes, the contractor is responsible to fill out a Fire Hydrant Request Form from the SoW, to use the water.

12. If required, is there fill material available on site? If available, is there a charge for it?

a. There are no fill material available on site, the contractor is responsible to gather material.

13. Are there any disconnect fees for the utilities?

a. There are NO fees to disconnect any utilities.

14. If a permit is required, what is the permit process?

a. Please refer to the specifications, for the types of permits that are required.

15. Please confirm whether metal and machinery can be salvaged or if the installation is retaining any items.

a. Everything is to be removed, the only item that the government wants is the transformer. Please refer to the DWGs for further details.

16. Are there any specific guidelines that include the handling of C&D and ACM waste?

a. Please refer to the specifications for further guidelines.

17. Do all onsite personnel need to be U.S. citizens?

a. Onsite personnel needs a State I.D

18. Is the contractor responsible for FOD control?

a. No, the contractor is not responsible for FOD control since the work does not take place near the airfield.

19. Is SHPO a concern?

a. Not a concern.

20. Is power available at the site? Is it free of charge?

a. Power is NOT available on site.

21. Are there any additional drawings other than the project demolition and the as-builts?

a. There are no additional drawings for this building.

22. What is the SWPP/E&SC process, and is a permit required?

a. Please refer to the specifications in the SoW, no permit is required

23. Can the QC Manager, SSHO, and Superintendent be one person?

a. Yes, if that one person has all those certifications documents. The Superintendent is required to be onsite when work is being done.

24. Will the contract be awarded 30 days after proposals are submitted?

a. No, a Request for Quote (RFQ) contract will not necessarily be awarded 30 days after submissions.

25. Is there a landfill onsite where construction debris can be disposed of? Is there a fee?

a. There’s no landfill on base to dispose of construction debris, the contractor is responsible to remove them off base.

26. Is there a landfill on base to dispose of hazardous materials? If yes, is there a charge?

a. There’s no landfill on base to dispose of hazardous materials, the contractor is responsible to remove them off base.

27. Please provide the magnitude of construction per FAR 36.204: This is a service contract, therefore a Magnitude is not required.

28. Please confirm if bid guarantees are required: Bid guarantees are required.

29. Please confirm if the quotation package should include all sections in (1) consolidated document, or if each section should be submitted separately: The submission shall be one consolidated document.

30. Please confirm that no evaluations are required for Subsection 3 - Relevant Past Performance or Case Studies: The contractor shall submit past performance if it is relevant to the requirement. If no past performance is provided it will NOT be held against the contractor

File details come from the government source that posted it. Updated .