This package includes construction documents for a project to fully renovate approximately 1,200 square feet of an existing Nuclear Medicine department at a Veterans Affairs medical center in order to install a new PET CT scanner. The documents include structural framing plans, an equipment schedule and details, as well as sections and details. Key equipment to be installed includes a Biograph Vision gantry, patient table, common power distribution units, a Medrad injector, and an overhead lift system. Structural upgrades involve installing unistrut supports, a new catwalk, and anchoring various medical equipment. The project is to be conducted according to specifications and drawings in full compliance with all applicable building codes.
View the file
Other files
Show all 44
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXPANSION BOLTS IN CRACKED AND UNCRACKED CONCRETE
ADHESIVE ANCHOR SYSTEM FOR THREADED ROD OR REBAR IN CONCRETE
ACCEPTABLE PRODUCTS
HILTI - KWIK BOLT TZ
SIMPSON - STRONG-BOLT 2
BOLT DIAMETER INSTALLATION TORQUE (FT-LB)
3/8" 2 1/2" 30
1/2" 60
5/8" 90
3/4" 150
4 1/2"
5"
ACCEPTABLE PRODUCTS ICC-ES EVALUATION REPORT
HILTI HIT - RE-500 V3
THREAD ROD
DIAMETER
MINIMUM EMBEDMENT
DEPTH (U.N.O.)
TESTING FORCE
3/8" DIA 3
" 3,400 LB
1/2" DIA 5,600 LB
5/8" DIA 9,300 LB
3/4" DIA 13,450 LB
6"
8"
10"
#3
#4
#5
#6
AN EQUIVALENT PRODUCT ACCEPTABLE TO ENGINEER
AN EQUIVALENT PRODUCT ACCEPTABLE TO ENGINEER
REBAR SIZE
ICC-ES EVALUATION REPORT
ESR-1917
ESR-3037
ESR-3814
HILTI KWIK BOLT TZ
BOLT DIAMETER EFFECTIVE MIN. DEPTH
(U.N.O.)
INSTALLATION TORQUE (FT-LB)
3/8" 2" 25
1/2" 40
5/8" 60
3/4" 110
4"
4 3/4"
SIMPSON STRONG-TIE STRONG-BOLT 2
3 1/4"
3 3/8"
EFFECTIVE MIN. DEPTH
(U.N.O.)
POST-INSTALLED ANCHORAGE INTO CONCRETE
1. ANCHORAGE SHALL BE INSTALLED PER MANUFACTURER'S WRITTEN INSTRUCTIONS, AND SHALL COMPLY WITH ACI CHAPTER 17 OF
ACI 318-14 AND IBC.
2. ADHESIVE ANCHOR INSTALLERS SHALL BE CERTIFIED IN ACCORDANCE WITH THE ACI-CRSI ADHESIVE ANCHOR INSTALLER
CERTIFICATION PROGRAM.
3. THE CONTRACTOR SHALL PREPARE A WRITTEN PROCEDURE PRIOR TO CONSTRUCTION FOR AN INSTALLATION METHOD TO AVOID
DRILLING INTO OR CONTACTING IN ANY WAY REINFORCING STEEL AND OTHER EMBEDDED ITEMS. APPROVED METHODS COULD
INCLUDE PLASTIC MARKINGS FORMED INTO THE CONCRETE SURFACE, OR USE OF GROUND PENETRATING RADAR EQUIPMENT
SUCH AS HILTI FERROSCAN PS200. ANCHORS SHALL CLEAR EXISTING REBAR BY 1" MINIMUM.
4. CONFORM WITH ICC RECOMMENDED VALUES FOR ANCHOR SPACING AND EDGE DISTANCE TO DEVELOP FULL (100%) ALLOWABLE
TENSION/SHEAR LOADS LISTED IN ICC REPORTS. DO NOT USE REDUCED SPACING AND EDGE DISTANCE UNLESS SPECIFICALLY
NOTED OTHERWISE BY THE DETAILS.
5. ANCHORS SHALL BE INSTALLED ACCORDING TO THE ANCHORING SYSTEM'S SPECIFICATIONS. DO NOT DAMAGE REINFORCING
STEEL OR OTHER EMBEDDED ITEMS. FILL UNUSED HOLES WITH NON-SHRINK GROUT.
6. DRILLED HOLE SHALL BE CLEANED WITH A BRUSH AND CLEAN COMPRESSED AIR IN COMPLIANCE WITH ICC ESR REQUIREMENTS.
7. WHILE ATTACHING STEEL MEMBERS TO THE CONCRETE OR MASONRY USING ANCHORS, INSTALL ANCHORS BEFORE DRILLING THE
HOLES IN ATTACHED STEEL MEMBERS. THE HOLES IN STEEL MEMBERS SHALL MATCH THE LOCATION OF INSTALLED ANCHORS.
8. WHILE ANCHORING STEEL MEMBERS AGAINST CONCRETE, PROVIDE LOCK-WASHER AND NUT AT EACH ANCHOR ROD.
9. CONCRETE SCREW ANCHORS MAY BE HILTI KWIK CON II (ICC ESR-5259), SIMPSON TITEN HD SCREW ANCHORS (ICC ESR-1056), RED
HEAD LDT CONCRETE SCREW ANCHOR (ICC ESR-5890), OR AN EQUIVALENT PRODUCT ACCEPTABLE TO ENGINEER. AT ENDS OF
LATERAL SEISMIC BRACING, USE EXPANSION BOLTS IN LIEU OF SCREW ANCHORS.
10. TEST POST-INSTALLED ANCHORS IN CONCRETE AND MASONRY PER CBC. INSTALLATION TORQUE QUALITIES AS TEST. TEST
100-PERCENT OF BOLTS USED FOR STRUCTURAL APPLICATIONS. TEST 50-PERCENT OF BOLTS USED FOR NON-STRUCTURAL
APPLICATIONS SUCH AS EQUIPMENT ANCHORAGE, INCLUDING HALF OF THE BOLTS IN EACH GROUP. TEST 10-PERCENT OF BOLTS
USED FOR SILL-PLATE BOLTING APPLICATIONS.
11. ALL BOLTS AND ANCHORS (INCLUDING NUTS AND WASHERS) EXPOSED TO WEATHER SHALL BE STAINLESS STEEL.
12. THE EMBEDMENT DEPTH OF POST-INSTALLED ANCHORS SPECIFIED IN THE INDIVIDUAL DRAWING DETAILS SHALL GOVERN OVER
THE MINIMUM EMBEDMENTS SHOWN IN THE TABLES ABOVE. WHERE THE INDIVIDUAL DRAWING DETAIL SPECIFIES A CERTAIN
PRODUCT AND THE CONTRACTOR WISHES TO USE AN ACCEPTABLE ALTERNATIVE PRODUCT, THE EMBEDMENT DEPTH FOR THAT
ALTERNATIVE PRODUCT SHALL BE INCREASED AS REQUIRED BEYOND THE EMBEDMENT DEPTH SHOWN FOR THE SPECIFIED
PRODUCT IN ORDER TO ACHIEVE THE SAME CAPACITIES IN SHEAR AND TENSION AS PUBLISHED IN THE ICC-ESR REPORT FOR THE
PRODUCT AND EMBEDMENT DEPTH SPECIFIED IN THE DETAIL. IF THE EMBEDMENT DEPTH OF THE ALTERNATIVE PRODUCT MUST BE
INCREASED TO MATCH THE CAPACITIES OF THE PRODUCT SPECIFIED IN THE DETAIL, THE LIMITATION ON CONCRETE THICKNESS
SPECIFIED IN THE ICC-ESR REPORT FOR THE ALTERNATIVE PRODUCT MAY NOT BE VIOLATED. THE EMBEDMENT DEPTH FOR THE
ALTERNATIVE PRODUCT MAY NOT BE LESSENED BELOW THE VALUE SHOWN IN THE DETAIL. CHANGES TO POST-INSTALLED
ANCHORS CALLED OUT ON DETAILS IS SUBJECT TO OSHPD APPROVAL PRIOR TO FABRICATION.
SCOPE OF WORK :
PROJECT CONSISTS OF THE INSTALLATION OF A NUCLEAR MEDICINE SUITE AT THE LEVEL 4 OF THE SAN DIEGO VETERANS
ADMINISTRATION.
GENERAL
1. REFER TO PROJECT SPECIFICATIONS FOR PROJECT REQUIREMENTS.
2. CONSTRUCTION AND WORKMANSHIP, INCLUDING MATERIALS, SHALL CONFORM TO THESE DRAWINGS AND THE 2015 EDITION OF
THE IBC.
3. GOVERNING CODE AUTHORITY: VETERANS ADMINISTRATION.
4. COMPLY FULLY WITH ALL CODES HAVING JURISDICTION OVER THE WORK. IF ANY WORK SHOWN OR INDICATED ON THE DRAWINGS
IS IN CONFLICT WITH ANY CODE HAVING JURISDICTION, BRING IT TO THE ATTENTION OF THE OWNER PRIOR TO THE
COMMENCEMENT OF ANY WORK WHICH WOULD BE AFFECTED BY IT.
5. WHERE NOT INDICATED OTHERWISE, THE LATEST EDITION OF ALL CITED DOCUMENTS SHALL GOVERN.
6. THE TERM IBC IN THESE DRAWINGS MEANS 2015 INTERNATIONAL BUILDING CODE.
7. ALL INFORMATION, DIMENSIONS, AND ELEVATIONS SHOWN OR NOTED TO EXISTING STRUCTURE ARE BASED ON BEST INFORMATION
CURRENTLY AVAILABLE AT THE TIME OF THE PREPARATION OF THESE DRAWINGS. NO WARRANTY IS IMPLIED AS TO THE ACCURACY
OF EXISTING CONDITIONS. THE CONTRACTOR SHALL REFER TO THE ORIGINAL CONSTRUCTION DOCUMENTS FOR INFORMATION
REGARDING EXISTING CONSTRUCTION AND SHALL FIELD VERIFY ALL CONDITIONS. IF CONDITIONS BECOME APPARENT WHICH
DIFFER FROM THE CONDITIONS SHOWN HEREIN, THEY SHALL BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE OWNER.
HOWEVER, ANY SIGNIFICANT CONFLICTS SHALL BE RESOLVED AS NOTED.
8. THE CONTRACTOR SHALL:
A. BECOME FAMILIAR WITH ALL CONTRACT DOCUMENTS.
B. CHECK ALL DIMENSIONS.
C. RESPONSIBLE FOR COORDINATION OF ALL TRADES TO ASSURE PROPER CONSTRUCTION OF THE PROJECT. ALL
DISCREPANCIES SHALL BE CALLED TO THE ATTENTION OF THE ENGINEER AND SHALL BE RESOLVED BEFORE PROCEEDING
WITH THE WORK.
9. DIMENSIONS: DIMENSIONS TAKE PRECEDENCE OVER SCALE OF DRAWING. RELY ON WRITTEN DIMENSIONS GIVEN AND FIELD
VERIFICATION. IF DISCREPANCIES ARE FOUND, NOTIFY THE OWNER BEFORE THE COMMENCEMENT OR RESUMPTION OF WORK. IF
NO DIMENSION ARE GIVEN, NOTIFY THE OWNER FOR CLARIFICATIONS. ALL NOTIFICATIONS SHALL BE BY "RFI".
10. DRAWINGS INDICATE GENERAL AND TYPICAL DETAILS OF CONSTRUCTION. NOTES AND DETAILS ON DRAWINGS TAKE PRECEDENCE
OVER "GENERAL NOTES" AND TYPICAL DETAILS. WHERE CONDITIONS ARE NOT SPECIFICALLY INDICATED BUT ARE OF SIMILAR
CHARACTER TO DETAILS SHOWN, SIMILAR DETAILS OF CONSTRUCTION SHALL BE USED SUBJECT TO PRIOR REVIEW BY THE
ENGINEER.
11. CONDITIONS NOTED AS "EXISTING" OR (E) ARE TO REMAIN UNLESS NOTED OTHERWISE PROTECT AS REQUIRED. "EXISTING"
CONSTRUCTION REMOVED BY THE CONTRACTOR FOR ANY REASON SHALL BE REPLACED TO MATCH EXISTING AT NO ADDITIONAL
COST TO THE OWNER. ALL MATERIALS, FEATURES OR CONDITIONS NOT SPECIFICALLY IDENTIFIED AS "EXISTING" OR (E) ARE
CONSIDERED NEW WORK AND ARE PART OF THE PROJECT SCOPE OF WORK.
12. ALL EXISTING CONDITIONS, WHETHER OR NOT SPECIFICALLY NOTED ON THE DRAWINGS, SHALL BE VERIFIED PRIOR TO THE
COMMENCEMENT OF ANY WORK. DO NOT PROCEED WITH ANY ITEM OR WORK THAT IS REASONABLY QUESTIONABLE WITHOUT
ADVISING THE OWNER. OBTAIN DIRECTION FROM THE OWNER AS TO HOW TO PROCEED. SUBMIT ALL QUESTIONS ON "RFI" FORM.
13. ANY DISCREPANCIES FOUND IN THE CONTRACT DOCUMENTS SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER FOR
RESOLUTION PRIOR TO COMMENCING ANY WORK.
14. THE CONTRACTOR SHALL SUPERVISE AND DIRECT THE WORK, AND SHALL BE SOLELY RESPONSIBLE FOR ALL CONSTRUCTION
MEANS, METHODS, TECHNIQUES, SEQUENCES AND PROCEDURES. THE SUPPORTING SERVICES BY THE ENGINEER, WHETHER
PERFORMED PRIOR TO, DURING, OR AFTER CONSTRUCTION, ARE PERFORMED SOLELY FOR THE PURPOSE OF ASSISTING IN
QUALITY CONTROL AND IN ACHIEVING CONFORMANCE WITH CONTRACT DRAWINGS AND PROJECT SPECIFICATIONS; BUT THEY DO
NOT GUARANTEE THE CONTRACTOR'S PERFORMANCE AND SHALL NOT BE CONSIDERED AS SUPERVISION OF CONSTRUCTION.
15. THE CONTRACTOR SHALL COORDINATE ALL UTILITY LOCATIONS WITH OTHER DRAWINGS AND SHALL CONDUCT A DETAILED
SURVEY OF EXISTING UTILITIES TO IDENTIFY INTERFERENCES WITH THE NEW CONSTRUCTION. PROMPTLY NOTIFY THE ENGINEER
OF ANY INTERFERENCES PRIOR TO PERFORMING THE WORK.
16. IN THE EVENT THAT THERE ARE ANY UTILITIES AFFECTED, ANY MODIFICATIONS SHALL BE THE RESPONSIBILITY OF THE
CONTRACTOR AND NOT THAT OF THE OWNER. ALL OUTLETS EITHER ELECTRICAL OR MECHANICAL, OR ANY ASSOCIATED REWORK
OR MODIFICATIONS WILL BE A PART OF THE BID AND NOT TO BE CONSTRUED AS THE WORK OF THE OWNER. SUFFICIENT DUE
DILIGENCE ON THE PART OF THE CONTRACTOR WILL ELIMINATE ANY POTENTIAL ISSUES AND ACCEPTANCE OF THE AGREEMENT
SHALL BIND CONTRACTOR TO SAID ACCEPTANCE.
17. LOCATE ALL EMBEDDED ITEMS AND REINFORCING STEEL USING NON-DESTRUCTIVE MEANS PRIOR TO DRILLING OR CORING. DO
NOT DAMAGE EMBEDDED ITEMS WITHOUT APPROVAL BY THE STRUCTURAL ENGINEER.
18. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE SAFETY OF WORK AREA DURING CONSTRUCTION PERIOD. THE CONTRACTOR
SHALL PROTECT ADJACENT PROPERTY AND UTILITIES IN ACCORDANCE WITH ALL NATIONAL, STATE, AND LOCAL SAFETY
ORDINANCES.
19. PROVIDE BARRICADING AND MAINTAIN ANY REQUIRED LIGHTS, WARNING, AND DIRECTIONAL SIGNS, AND OTHER PROTECTION NEAR
AND ABOUT THE AREA OF THE WORK AS MAY BE REQUIRED BY THE OWNER, OR BY ANY OTHER GOVERNING AUTHORITY. PROVIDE
NECESSARY MEANS TO PROTECT ANY SURROUNDING ADJACENT SITE STRUCTURES, PROPERTIES, SERVICING UTILITIES, PEDESTRIAN AND VEHICLE WAYS, AND MAINTAIN ALL SAFETY MEASURES UNTIL WORK IS COMPLETED.
20. SECURE THE CONSTRUCTION SITE. ANY PARTS OF WORK AREA WHICH ARE TO BE BARRICADED OR SEALED TO
NON-CONSTRUCTION INDIVIDUALS MUST BE COORDINATED WITH AND APPROVED BY THE OWNER BEFORE PROCEEDING WITH THE
WORK.
21. PROVIDE ALL MEASURES NECESSARY TO PROTECT THE STRUCTURE AND ADJACENT STRUCTURE(S), FINISHES AND UTILITIES
DURING CONSTRUCTION.
22. PROVIDE AND ENGINEER ALL TEMPORARY STRUCTURAL AND SAFETY ELEMENTS REQUIRED TO ACCOMPLISH THE WORK.
23. THE CONTRACTOR SHALL EXERT EVERY EFFORT TO PREVENT DUST AND CONSTRUCTION DEBRIS FROM CONTAMINATING THE
WORK AREA. THESE EFFORTS SHALL INCLUDE BUT NOT BE LIMITED TO PROVIDING A DAILY CLEANUP OF THE CONSTRUCTION AREA.
THE CONTRACTOR SHALL REFER TO THE PROJECT SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.
24. CUTTING, BORING, SAW-CUTTING OR DRILLING THROUGH STRUCTURAL MEMBERS OTHER THAN THOSE DETAILED ON STRUCTURAL
DRAWINGS SHALL NOT BE DONE WITHOUT THE ENGINEER'S APPROVAL.
25. PERFORM ALL PATCHING AND RESTORATION AS REQUIRED BY THE WORK. THE WORK SHALL MATCH ADJACENT SURFACES UNLESS
SPECIFICALLY NOTED OTHERWISE TO THE SATISFACTION OF THE OWNER.
26. ALL PENETRATIONS THROUGH SLABS AND / OR FIREWALLS MUST BE SEALED USING UL APPROVED SYSTEMS AS REQUIRED BY
SPECIFICATION 07 84 00 FIRESTOPPING.
Fp=0.4a p
S
DS
W p
SHEAR: (1+2Z
h
(R p
I p
EQUIPMENT ANCHORAGE
1. SUPPORTS AND ATTACHMENTS OF ALL EQUIPMENT TO BE INSTALLED AS A PART OF THIS PROJECT SHALL BE DETAILED ON
CONSTRUCTION DOCUMENTS, EXCEPT THOSE EXEMPT BY THE 2015 IBC SECTION 1616.1.18.
2. EQUIPMENT SUPPORTS AND ATTACHMENTS SHALL BE APPROVED BY THE APPROPRIATE DESIGN PROFESSIONAL OF RECORD (DPR)
AND THE V.A. AS A PART OF FIELD REVIEWS/OBSERVATIONS. THE INSPECTOR OF RECORD (IOR) SHALL ASSURE THAT THE ABOVE
REQUIREMENTS ARE ENFORCED.
STRUCTURAL TESTS AND INSPECTIONS
1. STRUCTURAL TESTS AND INSPECTIONS SHALL BE IN ACCORDANCE WITH THE 2016 CBC, PROJECT SPECIFICATIONS AND 2015 IBC".
FOUNDATIONS
1. NO SOILS REPORT WAS PREPARED FOR THIS PROJECT.
2. WORK ON THIS PROJECT WILL HAVE NO EFFECT ON THE BUILDING'S FOUNDATION.
DESIGN CRITERIA
SEISMIC DESIGN DATA:
SEISMIC IMPORTANCE FACTOR: I = 1.5
MAPPED SPECTRAL RESPONSE:
S
S
= 1.274
S
= 0.447
SITE CLASSIFICATION: D
SPECTRAL RESPONSE:
S
DS
= 1.019
S
D1
= 0.610
SEISMIC DESIGN CATEGORY: D
SEISMIC SYSTEM-DEMANDS ON NON-STRUCTURAL COMPONENTS:
COMPONENTS AMPLIFICATION FACTOR: SEE EQUIPMENT SCHEDULE 9/SF3
COMPONENTS RESPONSE FACTOR: SEE EQUIPMENT SCHEDULE 9/SF3
OVERSTRENGTH FACTOR:
SEE EQUIPMENT SCHEDULE
REDUNDANCY FACTOR:
p = 1.0
CAST-IN-PLACE-CONCRETE
1. CONCRETE SHALL BE AS FOLLOWS:
NEW CONCRETE SHALL BE:
· STRENGTH AGGREGATES: LIGHT WEIGHT
· DRY @ 28 DAYS: 3000 PSI
· WEIGTH: 115 PCF
EXISTING CONCRETE IS LIGHT WEIGHT CONCRETE: 3000 PSI
2. CEMENT SHALL CONFORM TO ASTM C150 TYPE I OR II.
3. HARDROCK AGGREGATES SHALL CONFORM TO ASTM C33. THEIR MAXIMUM SIZE SHALL BE 1-1/2 INCHES FOR FOOTINGS GRADE
BEAMS AND 1 INCH FOR ALL OTHER WORK.
4. LIGHTWEIGHT AGGREGATES (CONFORMING TO ASTM C330) SHALL BE APPROVED BY THE ENGINEER, AND THEIR MAXIMUM SIZE
SHALL BE ONE INCH.
5. A STATEMENT OF MIX DESIGN SHALL BE MADE FOR CONCRETE WITH DESIGN STRENGTH OVER 2500 PSI. COPIES OF THE MIX
DESIGN SHALL BE SUBMITTED TO THE OWNER, ARCHITECT, ENGINEER, AND OSHPD FOR APPROVAL BEFORE USE.
6. ONLY ONE GRADE OF CONCRETE SHALL BE POURED ON THE JOB AT ONE TIME.
7. CONCRETE COVER OVER REINFORCING SHALL BE AS FOLLOWS:
A. CAST AGAINST AND PERMANENTLY EXPOSED TO EARTH: 3"
B. EXPOSED TO EARTH OR WEATHER :
· CAST-IN-PLACE - NON STRESSED: 2"
C. NOT EXPOSED TO EARTH OR WEATHER:
· MAIN BARS IN BEAMS AND COLUMNS: 2"
· TIES AND STIRRUPS: 1
8. ALL REINFORCING SHOWN CONTINUOUS SHALL BE LAPPED PER ACI 318 CLASS B SPLICE OR 40 DIAMETERS (GRADE 60) AT SPLICES, AND SHALL BE MADE AWAY FROM POINTS OF MAXIMUM STRESS. MINIMUM LAP SHALL BE 2'-0" LONG.
9. BEFORE CONCRETE IS POURED, CHECK WITH ALL TRADES TO INSURE PROPER PLACEMENT OF ALL OPENINGS, SLEEVES, CURBS, CONDUITS, BOLTS, INSERTS, ETC., RELATING TO WORK.
10. ALL SLEEVES NOT SPECIFICALLY SHOWN ON THE DRAWINGS SHALL BE LOCATED BY THE TRADES INVOLVED AND SHALL BE
APPROVED BY THE ENGINEER.
11. DRY PACK CONCRETE SHALL BE ONE PART PORTLAND CEMENT AND ONE PART SAND WITH SUFFICIENT WATER TO ALLOW A SMALL
AMOUNT OF PASTE TO COME TO THE SURFACE.
12. CONCRETE GROUT SHALL BE NON SHRINKING WITH SUFFICIENT WATER TO ALLOW POURING. ULTIMATE COMPRESSIVE STRENGTH
(f'c) AT 28 DAYS SHALL BE EQUAL TO 3000 PSI MINIMUM.
13. A MIX THAT PRODUCES THE LOWEST SLUMP COMPATIBLE WITH PROPER PLACEMENT SHALL BE USED (4
" MAXIMUM SLUMP
UNLESS OTHERWISE APPROVED BY THE STRUCTURAL ENGINEER.)
14. ALL CONCRETE IS DESIGNED BY ULTIMATE STRENGTH DESIGN METHOD.
15. FORMS FOR CONCRETE STRUCTURAL MEMBERS (SLABS, BEAMS, ETC.) SHALL NOT BE STRIPPED UNTIL THE CONCRETE HAS
REACHED ITS DESIGNED STRENGTH.
REINFORCING STEEL
1. ALL CONCRETE SHALL BE REINFORCED. REINFORCING STEEL SHALL BE NEW DEFORMED STEEL BARS CONFORMING TO ASTM A615, GRADE 60 UNLESS OTHERWISE NOTED.
2. ALL REINFORCING STEEL SHALL MEET THE FOLLOWING SPECIAL DUCTILITY REQUIREMENTS UNLESS OTHERWISE NOTED:
A. THE ACTUAL YIELD STRENGTH SHALL NOT EXCEED THE SPECIFIED YIELD STRENGTH BY MORE THAN 18,000 PSI.
A. B. THE RATIO OF THE ACTUAL ULTIMATE TENSILE STRESS TO THE ACTUAL YIELD STRENGTH SHALL NOT BE LESS THAN 1.25.
B. C. REINFORCING STEEL CERTIFIED AS ASTM A706 MAY BE ASSUMED TO COMPLY WITH THESE REQUIREMENTS.
C. D. SUBJECT TO THE ENGINEER'S WRITTEN APPROVAL, REINFORCING STEEL NOT MEETING THE SPECIAL DUCTILITY
REQUIREMENTS SPECIFIED ABOVE MAY BE PERMITTED IN LOCATIONS NOT SUBJECT TO YIELDING UNDER SEISMIC LOAD.
D. E. FOR BIDDING PURPOSES, ASSUME ALL ASTM-A615 STEEL MUST COMPLY WITH NOTES 2A AND 2B ABOVE.
3. REINFORCING STEEL SHALL BE FIRMLY SUPPORTED AND ACCURATELY PLACED.
4. COMPLETE REINFORCING STEEL PLACEMENT DRAWINGS SHALL BE PREPARED IN ACCORDANCE WITH ACI BY THE CONTRACTOR
AND REVIEWED BY THE ENGINEER AND SHALL BE AVAILABLE ON THE JOB SITE PRIOR TO PLACING OF CONCRETE.
5. ANCHOR BOLTS, DOWELS AND OTHER EMBEDDED ITEMS SHALL BE SECURELY TIED IN PLACE BEFORE CONCRETE IS PLACED.
6. ALL REINFORCING STEEL TO BE WELDED SHALL CONFORM TO ASTM A706, GRADE 60 DEFORMATIONS SHALL BE IN ACCORDANCE
WITH ASTM A305.
7. ALL WELDING OF REINFORCING STEEL SHALL CONFORM TO AWS D1.4 AND SHALL BE PERFORMED BY CERTIFIED WELDERS USING
AWS A5.5 E-90XX (TABLE 5.1, AWS D1.4) LOW HYDROGEN MOISTURE RESISTING ELECTRODES UNLESS OTHERWISE NOTED.
8. NO HEATING SHALL BE ALLOWED FOR BENDING OF REINFORCING STEEL.
9. TYPE 2 MECHANICAL COUPLERS WITH CURRENT ICC-ES EVALUATION REPORTS MAY BE USED AT THE CONTRACTOR'S DISCRETION
IN LIEU OF LAP SPLICES, WELDING OR OTHER ACCEPTABLE MEANS FOR JOINING REINFORCING STEEL PROVIDING SUCH USE DOES
NOT ADVERSELY AFFECT DESIGN INTENT, CODE REQUIREMENTS OR CONSTRUCTABILITY.
10. ALL MECHANICAL COUPLERS SHALL BE REVIEWED BY THE ENGINEER AND INSPECTED DURING CONSTRUCTION.
11. ALL REINFORCING STEEL INTERRUPTED BY STRUCTURAL STEEL SHALL TERMINATE WITHIN 1" OF THE STEEL SURFACE WITH A 90°
STANDARD HOOK UNLESS OTHERWISE NOTED.
STRUCTURAL STEEL AND MISCELLANEOUS STEEL
1. THE CONTRACTOR SHALL SUBMIT ALL STRUCTURAL STEEL AND MISCELLANEOUS STEEL SHOP DRAWINGS TO THE ENGINEER FOR
REVIEW PRIOR TO FABRICATION.
2. MATERIAL TEST OR REPORTS FOR HOT-ROLLED STRUCTURAL SHAPES, PLATES, AND BARS SHALL BE MADE IN ACCORDANCE WITH
ASTM A6. FOR SHEET MATERIAL, TEST SHALL BE MADE IN ACCORDANCE WITH ASTM A568. FOR TUBING AND PIPE, SUCH TEST
SHALL BE MADE IN ACCORDANCE WITH REQUIREMENTS OF THE APPLICABLE ASTM STANDARDS.
3. HOT ROLLED SHAPES WITH FLANGES 1
" THICK AND THICKER AND BASE PLATE 1
" THICK AND THICKER SHALL HAVE A MINIMUM
CHARPY V-NOTCH TOUGHNESS OF 20 FL-LB AT 70° F.
4. STEEL MATERIALS SHALL CONFORM TO THE FOLLOWING, UNLESS OTHERWISE NOTED:
A. ANGLES, PLATES AND BARS: ASTM A36 (Fy=36ksi, Fu=58ksi)
B. W AND WT: ASTM A992 (Fy=50ksi, Fu=65ksi)
C. RECTANGULAR AND SQUARE HSS: ASTM A1085 (Fy=50ksi, Fu=65ksi)
D. ROUND HSS: ASTM A1085 (Fy=50ksi, Fu=65ksi)
E. PIPES: ASTM A53, GRADE B (Fy=35ksi, Fu=60ksi)
F. BOLTS AT STEEL-TO-STEEL CONNECTIONS: ASTM A325 ST (SNUG-TIGHTENED), TYPE 1;
"Ø TYP. U.O.N.
G. BOLTS AT OTHER APPLICATIONS: ASTM A307
H. THREADED RODS: ASTM A36
I. NUTS: ASTM A563
J. WASHERS: ASTM F436
5. ALL WELDING OF STEEL SHALL CONFORM TO AWS D1.1 AND SHALL BE PERFORMED BY AWS CERTIFIED WELDERS USING E-70XX
LOW HYDROGEN MOISTURE RESISTING ELECTRODES UNLESS OTHERWISE NOTED.
6. USE THE MINIMUM SIZE OF WELDS IN ACCORDANCE WITH AISC MANUAL OF STEEL CONSTRUCTION AT STEEL TO STEEL JOINTS
UNLESS A LARGER WELDING SIZE IS SPECIFIED ON THE PLANS.
7. ALL STEEL (EXCEPT STAINLESS STEEL) SHALL BE SHOP PRIMED WITH ZINC OXIDE PRIMER UNLESS OTHERWISE NOTED.
8. PAINT ALL STRUCTURAL STEEL WITH WEATHER/RUST RESISTANT PAINT IN ACCORDANCE WITH THE PROJECT SPECIFICATIONS AND
ARCHITECTURAL DETAILS UNLESS OTHERWISE NOTED.
9. DIAMETER OF BOLT HOLE SHALL BE
" LARGER THAN THE BOLT'S DIAMETER UNLESS OTHERWISE NOTED.
10. IF DRILLING HOLES AT STEEL MEMBERS TO ACCOMMODATE THE CONCRETE OR MASONRY ANCHORS IS REQUIRED, THE DRILLING
MUST BE DONE AFTER THE ANCHORS HAVE BEEN INSTALLED. THE HOLES AT STEEL MEMBERS SHALL MATCH THE LOCATION OF
INSTALLED ANCHORS.
11. PROVIDE BEVELED WASHERS ON SLOPING SURFACE OF CONNECTIONS FOR FULL BEARING.
12. WHERE LENGTH OF WELDING IS NOT SHOWN, IT SHALL BE FULL LENGTH OF JOINT. ALL BUTT WELDS SHALL BE COMPLETE
PENETRATION WELDS UNLESS OTHERWISE NOTED.
13. MINIMUM BOLT SPACING FROM CENTER OF STANDARD AISC HOLE AS FOLLOWS, U.N.O.:
CENTER-TO-CENTER = 3 BOLT DIAMETER
CENTER-T0-ROLLED EDGE = 1.5 BOLT DIAMETER
CENTER-TO-SHEARED EDGE = 1.75 BOLT DIAMETER
14. THE NATURAL CAMBER IN BEAMS SHALL BE ORIENTED UP, UNLESS NOTED OTHERWISE. AT CANTILEVERS, THE NATURAL CAMBER
SHALL BE ORIENTED SO THAT THE FREE END IS ABOVE THE CONNECTED END. THE TOP OF ALL MEMBERS SHALL BE CLEARLY
IDENTIFIED. ALL BEAM CAMBERS SHOWN ON THE PLANS SHALL INCLUDE NATURAL CAMBER.
15. UNDER NO CIRCUMSTANCES SHALL DRAWINGS BE SCALED OR REFERENCE ELECTRONIC BUILDING INFORMATION BE USED TO
DETERMINE ELEVATIONS OR DIMENSIONS.
16. THE CONTRACTOR SHALL ESTABLISH A MASTER SET OF TOP-OF-STEEL DRAWINGS FOR ALL AREAS OF THE BUILDING OR
STRUCTURE FOR APPROVAL BY THE ARCHITECT BEFORE BEGINNING FABRICATION OF STRUCTURAL STEEL. THE CONTRACTOR'S
MASTER SET OF TOP-OF-STEEL DRAWINGS SHALL BE SUBMITTED AT THE BEGINNING OF THE SHOP DRAWING SUBMITTAL PROCESS.
THIS SET OF DRAWINGS SHALL SHOW ALL TOP-OF-STEEL ELEVATIONS, ALL EDGE OF STEEL INFORMATION FOR FLOOR AND ROOF
LEVELS, AND ALL STEEL FRAMING DIMENSIONS AT FLOOR AND WALL OPENINGS.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
P
M
CONSTRUCTION DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
12/04/2020Revisions: Date:
A/E:
ISSUED FOR 65% C.D.
2020-09-02
ISSUED FOR 95% C.D.
2020-09-25
N
A
S
N
G
I
A
L
O
N
S I
EL
E
R
P
O
E F
M
T
R
E
D
E
S
E
E
R
S
I
A
O
R
F
I
A L
L
R
A
U T
N
R
G
E
R
I
T
E
O
F
C
R
T
S
U
S
A
T
C
No. 3930
S
N
A
H
A
M
I
ISSUED FOR 100% C.D.
2020-10-02
DATE SIGNED: 12/04/2020
664-CSI-1154W NUCLEAR MEDICINE PET- CT 2
SAN DIEGO, CA
IDS GROUP INC.
1 PETERS CANYON RD. STE.130
IRVINE, CA, 92606
(949) 387.8500
ISSUED FOR CONSTRUCTION
2020-11-06
ISSUED FOR CONSTRUCTION
2020-12-04
DBJR
GENERAL NOTES
SF1
SHOP DRAWINGS, SUBMITTALS AND REVIEW BY THE ENGINEER
1. SHOP DRAWINGS ARE NOT CONTRACT DOCUMENTS AND MAY NOT BE USED AS A BASIS FOR CONSTRUCTING THE WORK IN A
MANNER DIFFERENT FROM WHAT IS SHOWN IN THE CONTRACT DOCUMENTS. THE PURPOSE OF THE SHOP DRAWING REVIEW BY
THE ENGINEER IS TO HELP THE CONTRACTOR UNDERSTAND AND IMPLEMENT THE DESIGN SHOWN ON THE DRAWINGS AND
DESCRIBED IN THE SPECIFICATIONS. IF DEVIATIONS, DISCREPANCIES OR CONFLICTS BETWEEN THE SHOP DRAWINGS AND THE
CONTRACT DOCUMENTS ARE DISCOVERED EITHER PRIOR TO OR AFTER THE SHOP DRAWINGS ARE REVIEWED BY THE ENGINEER, THE CONTRACT DOCUMENTS SHALL CONTROL AND SHALL BE FOLLOWED.
2. SHOP DRAWINGS ARE REVIEWED BY THE ENGINEER SOLELY TO AID IN ASSESSING THE CONTRACTOR'S GENERAL CONFORMANCE
WITH THE DESIGN REQUIREMENTS AND INTENT. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR CONTRACTIBILITY, COMPATIBILITY WITH THE RELATED COMPONENTS OR ASSEMBLIES, DIMENSIONS, QUANTITIES, WEIGHTS OR GAUGES, AND THE
LIKE. THE CONTRACTOR IS NOT RELIEVED FROM COMPLIANCE WITH THE CONTRACT DOCUMENTS, OR FROM ANY CODE OR OTHER
LEGAL REQUIREMENTS. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR CONFIRMING AND COORDINATING ALL DIMENSIONS; FOR
CONSTRUCTION MEANS & METHODS AND SAFETY PRECAUTIONS; AND FOR ANY DEVIATIONS FROM THE PLANS AND
SPECIFICATIONS NOT CLEARLY IDENTIFIED BY THE ENGINEER.
PIPE PENETRATIONS THROUGH CONCRETE FLOORS AND FOUNDATIONS
1. SEE MECHANICAL DRAWINGS FOR ALL PIPE PENETRATIONS. ELECTRICAL CONDUIT IS NOT "PIPE" AND THESE NOTES ARE NOT
APPLICABLE TO ELECTRICAL CONDUIT.
2. ALL SLAB PENETRATIONS SHALL BE SLEEVED.
3. CORING OF CONCRETE SLABS FOR PENETRATIONS IS NOT PERMITTED.
4. ALL PIPE PENETRATIONS THROUGH FOUNDATIONS SHALL HAVE A MINIMUM CLEAR SPACING OF 6".
5. PIPE SIZE PENETRATING THE FOUNDATIONS SHALL BE A NOMINAL 6" DIAMETER MAXIMUM.
6. NO REBAR SHALL BE CUT OR MOVED MORE THAN 4" TO ACCOMMODATE PIPE PLACEMENT.
7. AT LEAST 2" OF CLEARANCE IS REQUIRED BETWEEN REINFORCING STEEL AND PIPE PENETRATIONS.
8. WHERE NO REINFORCING STEEL FALLS WITHIN THE CLEAR ZONE BETWEEN PIPES PENETRATING THE FOUNDATION, AN ADDITIONAL
#6 BAR, EXTENDING HORIZONTALLY A MINIMUM OF 36" ON EACH SIDE OF THE PIPE, SHALL BE PLACED TOP AND BOTTOM AND
CENTERED BETWEEN ADJACENT PIPES.
9. WITHIN THE CONCRETE POUR, THE VERTICAL PIPES SHALL BE WRAPPED WITH A SINGLE LAYER OF CARDBOARD AND TWO WRAPS
OF DUCT TAPE, TOTAL THICKNESS OF COVER NO MORE THAN
10. PIPES SHALL RUN VERTICALLY THROUGH THE FULL DEPTH OF CONCRETE THICKNESS.
11. IF HORIZONTAL RUNS MUST BE MADE IN THE FOUNDATION, THE RUNS SHALL BE MADE AT MID-DEPTH OF FOUNDATION. THE
MAXIMUM NOMINAL PIPE SIZE FOR HORIZONTAL RUNS IS 1/4 THE THICKNESS OF THE FOUNDATION OR 6" MAXIMUM, WHICHEVER IS
LESS.
12. THE CLEAR DISTANCE BETWEEN THE OUTSIDE DIAMETER OF THE PIPE WRAP AND ANY FACE OR EDGE OF FOUNDATION OR SLAB
SHALL BE 6" MINIMUM OR 2x THE NOMINAL PIPE DIAMETER, WHICHEVER IS GREATER.
ABBREVIATIONS
@ AT
& AND
A.B. ANCHOR BOLT
ABV. ABOVE
ADD'L. (ADDL.) ADDITIONAL
ADJ. ADJACENT
ALT. ALTERNATE
ALUM. ALUMINUM
APPRX. (APPROX.) APPROXIMATE(LY)
ARCH. ARCHITECT(URAL)
BLDG. BUILDING
BLKG. BLOCKING
BLW. BELOW
BM. BEAM
B.N. BOUNDARY NAILING
BNDRY. BOUNDARY
B.O.C. BOTTOM OF CONCRETE
B.O.F. BOTTOM OF FOOTING
BOT. (B) BOTTOM
BRCG. BRACING
BRDG. BRIDGE (ING)
BRG. BEARING
BTWN. BETWEEN
CAMB. (C) CAMBER(ED)
CBC CALIFORNIA BUILDING CODE
CANT. CANTILEVER(ED)
C.F. CUBIC FEET (FOOT)
C.I.P. CAST-IN-PLACE
C.I.D.H. CAST-IN-DRILLED HOLE
C.J. CONTROL JOINT;
CONSTRUCTION JOINT
C.L. (℄) CENTER LINE
CLG. CEILING
CLR. CLEAR
COL. COLUMN
CONC. CONCRETE
CONN. CONNECTION
CONST. CONSTRUCTION
CONT. CONTINUOUS
C.P. COMPLETE-PENETRATION
CTSK. COUNTERSINK
CTR. CENTER(ED)
C.Y. CUBIC YARD
d d PENNY NAIL
DBA DEFORMED BAR ANCHOR
DBL. DOUBLE
DEPT. DEPARTMENT
D.F. DOUGLAS FIR
DIA. (Ø) DIAMETER
DIAG. DIAGONAL
DIAPH. DIAPHRAGM
DIM. DIMENSION
DN. DOWN
DO DITTO (REPEAT)
DWG. (DWGS.) DRAWING(S)
DWL. DOWEL
EA. EACH
E.F. EACH FACE
E.J. EXPANSION JOINT
EL. ELEVATION
ELEC. ELECTRICAL
ELEV. ELEVATOR
EMB. EMBED(MENT)
E.N. EDGE NAIL
ENG. ENGINEER
EQ. EQUAL
EQPT. EQUIPMENT
EQUIV. EQUIVALENT
EXP. EXPANSION
EXIST. (E) EXISTING
EXT. EXTERIOR
FDN. FOUNDATION
FIN. FINISH(ED)
FLR. FLOOR
F.N. FIELD NAIL; FACE NAIL
F.O.C. FACE OF CONCRETE
F.O.M. FACE OF MASONRY
F.O.S. FACE OF STUD
F.O.W. FACE OF WALL
F.P. FULL (COMPLETE) PENETRATION
FRP FIBER REINFORCED POLYMER
F.S. FAR SIDE
FT. (') FOOT (FEET)
FTG. FOOTING
F.V. FIELD VERIFY
GA. GAUGE
GALV. GALVANIZE(D)
GLB. GLU-LAM/GLULAM
GLUED LAMINATED BEAM
GRD. GRADE
GYP. GYPSUM
K KIPS; 1000
K.P. KING POST
LAT. LATERAL
L.B. LAG BOLT
LB (#) POUND
L.F. LINEAL FEET (FOOT)
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LT. WT. LIGHT WEIGHT
MAX. MAXIMUM
M.B. MACHINE BOLT
MECH. MECHANICAL
M.E.P. MECHANICAL, ELECTRICAL AND
PLUMBING
MEZZ. MEZZANINE
MFR. MANUFACTURER
MIN. MINIMUM
MISC. MISCELLANEOUS
MTL. METAL
(N) NEW
NO. (#) NUMBER
N.S. NEAR SIDE
N.T.S. NOT TO SCALE
O/C (O.C.) ON CENTER
O.D. OUTSIDE DIAMETER
O.H. OPPOSITE HAND
OPNG. OPENING
OPP. OPPOSITE
ORTHO. ORTHOGONAL
O.W.J. OPEN WEB JOIST
PC PILE CAP
PCF POUNDS PER CU.FT.
PL. PLATE
PLYWD. PLYWOOD
P.P. PARTIAL-PENETRATION
P.S.F. POUNDS PER SQUARE FOOT
P.S.I. POUNDS PER SQUARE INCH
PT PRETENSIONED
P.T. PRESSURE TREATED
QTY. QUANTITY
RAD. (R) RADIUS
RBS REDUCED BEAM SECTION
REF. REFERENCE
REINF. REINFORCEMENT (ING)
REQ'D. (REQD.) REQUIRED
RF. ROOF
R.O. ROUGH OPENING
S.A.D. SEE ARCHITECTURAL DRAWINGS
SC SLIP-CRITICAL
S.C.D. SEE CIVIL DRAWINGS
SCH. SCHEDULE
SEP. SEPARATION
SHT. SHEET
SIM. SIMILAR
SKW. SKEW(ED)
S..G. SLAB-ON-GRADE
SPEC. SPECIFICATION
SQ. SQUARE
ST SNUG-TIGHTENED
STD. STANDARD
STAGG. STAGGER(ED)
STIFF. STIFFENER
STIR. STIRRUP
STL. STEEL
STRUC(T). STRUCTURAL
SUSP. SUSPENDED
SYMM. SYMMETRICAL
T&B TOP AND BOTTOM
T&G TONGUE AND GROOVE
TEMP. TEMPORARY
THK. THICK(NESS)
T.N. TOE NAIL
T.O. TOP OF
T.O.C. TOP OF CONCRETE
T.O.S. TOP OF STEEL;
TOP OF SHEATHING
T.O.W. TOP OF WALL
TRANS. TRANSVERSE
T.S.G. TAPERED STEEL GIRDER
TYP. TYPICAL
U.O.N. (U.N.O.) UNLESS OTHERWISE NOTED
UTIL. UTILITY
HD. HOLDOWN; HAND
HDR. HEADER
HGR. HANGER
HORIZ. (H) HORIZONTAL
H.S. HEADED STUD
H.S.B. HIGH STRENGTH BOLT
HT. HEIGHT
I.D. INSIDE DIAMETER
IN. (") INCH(ES)
INFO. INFORMATION
JST. JOIST
JT. JOINT
VERT. (V) VERTICAL
V.I.F. VERIFY IN FIELD
W/ WITH
(W) WIDE; WIDTH
WD. WOOD
W.P. WORK POINT
WT. WEIGHT
W.W.F. WELDED WIRE FABRIC
X-STG EXTRA STRONG
XX-STG DOUBLE EXTRA STRONG
STRUCTURAL TESTS AND INSPECTIONS
1. STRUCTURAL TESTS AND INSPECTIONS SHALL BE IN ACCORDANCE WITH THE IBC 2015 AND PROJECT SPECIFICATIONS.
2. INSPECTIONS: WORK ITEMS REQUIRING THE CONSTANT PRESENCE AND CONTINUOUS INSPECTION BY THE PROJECT OR SPECIAL
INSPECTOR HIRED BY THE OWNER INCLUDE, BUT MAY NOT BE LIMITED TO, THE ITEMS LISTED BELOW. THE CONTRACTOR SHALL
COORDINATE THE WORK AND SCHEDULE WITH THE OWNER'S INSPECTOR TO ASSURE THAT ADEQUATE NOTICE IS GIVEN FOR THE
INSPECTIONS TO OCCUR WHILE MAINTAINING PROJECT SCHEDULE.
A. CONCRETE: INSTALLATION AND TESTING OF POST-INSTALLED ANCHORS.
B. STEEL: MEMBER LOCATIONS, BRACING AND DETAILS; SHOP AND FIELD WELDING OF GROOVE, MULTI-PASS AND FILLET WELDS
GREATER THAN
"; SHOP AND FIELD WELDING OF REINFORCING STEEL.
C. SPRAY APPLIED FIRE-PROOFING: STEEL SURFACE CONDITIONS, APPLICATION AND SAMPLING, THICKNESS, AND COMPLIANCE
WITH APPROVED DOCUMENTS.
3. TESTS: WORK ITEMS REQUIRING TESTING INCLUDE, BUT MAY NOT BE LIMITED TO, THE FOLLOWING:
A. CONCRETE: POST-INSTALLED ANCHORS.
B. STEEL: UNIDENTIFIED MATERIALS; AND HIGH STRENGTH BOLTS, NUTS AND WASHERS.
C. SPRAY APPLIED FIRE-PROOFING: BOND STRENGTH AND DENSITY.
STRUCTURAL OBSERVATION
1. THE OWNER SHALL EMPLOY THE ENGINEER OF RECORD REGISTERED/LICENSED IN THE STATE OF CALIFORNIA WHO IS
RESPONSIBLE FOR THE STRUCTURAL DESIGN, TO DO STRUCTURAL OBSERVATION.
2. THE STRUCTURAL OBSERVATION IS REQUIRED FOR THE STRUCTURAL SYSTEM IN ACCORDANCE WITH IBC 2015, SECTION 1704.
STRUCTURAL OBSERVATION IS THE VISUAL OBSERVATION OF THE ELEMENTS AND CONNECTIONS OF THE STRUCTURAL SYSTEM AT
SIGNIFICANT CONSTRUCTION STAGES AND THE COMPLETE STRUCTURE FOR GENERAL CONFORMANCE TO THE APPROVED PLANS
AND SPECIFICATIONS. STRUCTURAL OBSERVATION DOES NOT WAIVE THE RESPONSIBILITY FOR THE INSPECTIONS REQUIRED OF
THE PROJECT INSPECTOR, DEPUTY INSPECTOR, SPECIAL INSPECTOR.
3. STRUCTURAL OBSERVER OF RECORD : RAMI M. ELHASSAN, S3930
4. THE STRUCTURAL OBSERVER SHALL PERFORM SITE VISITS AT THOSE STEPS IN THE PROGRESS OF THE CONSTRUCTION THAT
ALLOW FOR CORRECTION OF DEFICIENCIES WITHOUT SUBSTANTIAL EFFORT OR UNCOVERING OF THE WORK INVOLVED. AT A
MINIMUM, THE FOLLOWING SIGNIFICANT CONSTRUCTION STAGES REQUIRE A SITE VISIT AND AN OBSERVATION REPORT FROM THE
STRUCTURAL OBSERVER.
CONSTRUCTION STAGE ELEMENTS / CONNECTIONS TO BE OBSERVED;
A. FOLLOWING FRAMING REINFORCEMENT PRIOR TO COVERING WITH FINISH.
B. AFTER EQUIPMENT ANCHORAGE INSTALLED.
5. STRUCTURAL OBSERVATION: ALL STRUCTURAL OBSERVATIONS SHALL BE DOCUMENTED USING A STRUCTURAL OBSERVATION
REPORT FORM, AND SHALL BE STAMPED AND SIGNED BY THE STRUCTURAL OBSERVER OF RECORD.
6. OBSERVED DEFICIENCIES: ANY OBSERVED DEFICIENCIES SHALL BE DESCRIBED ON THE FORM; THE OBSERVER SHALL ALSO
INDICATE WHETHER A RE-OBSERVATION IS REQUIRED TO VERIFY CORRECTIVE ACTIONS HAVE BEEN PROPERLY TAKEN OR THAT
THE CORRECTIVE ACTIONS ARE DEEMED VERIFIABLE BY THE SPECIAL INSPECTOR OR CITY INSPECTOR PRIOR TO INSPECTION
APPROVAL.
SF2
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
P
M
CONSTRUCTION DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
12/04/2020Revisions: Date:
A/E:
ISSUED FOR 65% C.D.
2020-09-02
ISSUED FOR 95% C.D.
2020-09-25
N
A
S
N
G
I
A
L
O
N
S I
EL
E
R
P
O
E F
M
T
R
E
D
E
S
E
E
R
S
I
A
O
R
F
I
A L
L
R
A
U T
N
R
G
E
R
I
T
E
O
F
C
R
T
S
U
S
A
T
C
No. 3930
S
N
A
H
A
M
I
ISSUED FOR 100% C.D.
2020-10-02
DATE SIGNED: 12/04/2020
664-CSI-1154W NUCLEAR MEDICINE PET- CT 2
SAN DIEGO, CA
IDS GROUP INC.
1 PETERS CANYON RD. STE.130
IRVINE, CA, 92606
(949) 387.8500
ISSUED FOR CONSTRUCTION
2020-11-06
ISSUED FOR CONSTRUCTION
2020-12-04
GENERAL NOTES
DBJR
4.3
J.1
1/4" = 1'-0"
PARTIAL 4 TH. FLOOR FRAMING PLAN
E
T
R U
S
T
J.5
4.24.14
54.3
J.1
1/4" = 1'-0"
PARTIAL 4TH. FLOOR INTERSTITIAL PLAN
(E) 4I7.7
UNISTRUT P1001
OVER (3) (E) 4I BEAMS,
TYP. OF (2)
(2) P6379 TYP. AT ALL
CONNECTIONS
6" 6"
MEDRAD INJECTOR,
SEE ARCH.
J.5
4.24.1
J.1
(E) 4I7.7
(E) 4I7.7
(E) 4I7.7
(E) 4I7.7
(E) 4I7.7
(E) 4I7.7
(E) 4I7.7
E
T
R U
T
E
T
R U
T
A
E
T
R U
T
A
E
T
R U
T
A
PDC
cPDC
DESCRIPTION
WEIGHT (LBS)
ANCHORAGE DETAIL
REMARK
BIOGRAPH VISION GANTRY 600
6,898
11/SF7
a p
: R p
1.0 : 1.5
MARK
LOCATION
PATIENT TABLE
COMMON POWER DISTRIBUTION UNIT
POWER DISTRIBUTION UNIT & UPS
LEAD PIG - PHANTOM SOURCE CONTAINER
HEAT EXCHANGER CABINET - WATER /
AIR SPLIT
OUTDOOR UNIT - WATER / AIR SPLIT
CEILING MOUNTED MEDRAD INJECTOR
OVERHEAD LIFT SYSTEM (GULDMANN)
EQUIPMENT ANCHORAGE SCHEDULE
6,898
1,665
1,374
1,048
N.T.S.
EQUIPMENT SCHEDULE
N
N
OVERHEAD LIFT
SYSTEM, SEE ARCH.
(E) 4I7.7(E) 4I7.7
(E) 4I7.7
(E) 4I7.7
(E) 4I7.7
(E) 4I7.7
(E) 4I7.7
(E) 4I7.7
(E) 4I7.7
(E) 4I7.7
(E) 4I7.7
(E) 4I7.7
TYP.
TYP.
(E) 4I7.7
(E) 4I7.7
UNISTRUT P1001, MIN. LENGTH
TO ENGAGE (3) (E) 4I BEAMS ,
SPACING & CONNECTION TO (E)
4I BEAM PER 15/-, TYP.
SF7
SF7
UNISTRUT P1001, MIN. LENGTH
TO ENGAGE (3) (E) 4I BEAMS ,
SPACING & CONNECTION TO
(E) 4I BEAM PER 15/-., TYP.
STEAM HUMIDIFIER - H1
AIR HANDLING UNIT - AC420 5,630
SF5
SF5
OUTDOOR HEAT PUMP UNIT
LEVEL 4: RM. 4040
OUTDOOR HEAT PUMP UNIT
LEVEL 6: RM. 6083B
LEVEL 4:
INTERSTITIAL SPACE
LEVEL 4:
INTERSTITIAL SPACE
LEVEL 4:
RM. 4501 / 4503
LEVEL 4: RM. 4503
LEVEL 4: RM. 4503 1/SF7
H
Ω o
2.5
1.0 : 1.5
2.5 : 6.0
2.5
2.5
2.5
2.5
N.A.
2.5 : 6.0
2.5 : 6.0
2.5 : 2.5
1.0 : 2.5
1.0 : 1.5
1.0 : 1.5
2.5 : 6.0
2.5 : 6.0
2.5 : 2.0
2.5
2.5
2.5
1.5
AC
LEVEL 4: RM. 4520
LEVEL 4: RM. 4520
LEVEL 4: RM. 4503
2.5
N.A.
E
T
R U
B
O T
T O
M
C
H O
R D
E
T
R U
T
T O
M
C
H O
R D
E
T
R U
T
T O
M
C
H O
R D
E
T
R U
T
T O
M
C
H O
R D
E
T
R U
T
T O
M
C
H O
R D
(E) 4I7.7
(E) 4I7.7
(E) 4I7.7
1/SF6
5/MH-502
5/MH-502
2/MH-501
1/SF5
9/SF5
3/SF5
11/SF3
15/SF3
13/SF6
LEVEL 6: ADJACENT
TO RM. 6083B
UNISTRUT P1001, OVER
(3) (E) 4I BEAMS, TYP. OF (2)
RIGID COLUMN
FOR MED GAS
RIGID COLUMN FOR MED GAS
LEVEL 4: RM. 4503
16/SF3
1.0 : 1.5 N.A.
(E) 5" LIGHT WEIGHT
CONCRETE SLAB, TYP.
OVERHEAD LIFT
SYSTEM, SEE ARCH.
NOTE:
1. WHERE NEW MEMBERS ARE CONNECTED TO EXISTING STRUCTURAL
STEEL THAT IS FIREPROOFED, THE FIREPROOFING SHALL BE REMOVED AS
REQUIRED BY THE SPECIFICATIONS AS IT MAY CONTAIN ASBESTOS. AFTER
NEW STEEL IS INSTALLED NEW FIREPROOFING SHALL BE PROVIDED.
NOTE:
1. WHERE NEW MEMBERS ARE CONNECTED TO EXISTING STRUCTURAL
STEEL THAT IS FIREPROOFED, THE FIREPROOFING SHALL BE REMOVED AS
REQUIRED BY THE SPECIFICATIONS AS IT MAY CONTAIN ASBESTOS. AFTER
NEW STEEL IS INSTALLED NEW FIREPROOFING SHALL BE PROVIDED.
MOVABLE
1"=1'-0'
OVERHEAD LIFT SYSTEM (PATIENT LIFT) SUPPORT DETAIL
BEAM CLAMP
UNISTRUT
P6379S, TYP.
UNISTRUT P1001 OVER
(3) JOISTS MIN.
"Ø HANGERS PER
MANUFACTURER
PATIENT LIFT TRACK
BY MANUFACTURER
4'-0" 4'-0"
P1000 BRACES PER
MANUFACTURER
(E) 4TH INTERSTITIAL
FRAMING - 4I BEAM @
4'-0" O.C. TYP.
P1000 BRACES THIS
DIRECTION W/
P1843 EA. END, TYP.
UNISTRUT P1001
OVER (3) JOISTS
GAS COLUMN
MOUNTING PLATE
4'-0" 4'-0"
(E) 4TH INTERSTITIAL
FRAMING - 4I BEAM
@ 4'-0" O.C., (V.I.F.), TYP.
BEAM CLAMP UNISTRUT
P1379, TYP.
(2) UNISTRUT P1000
BRACES THIS DIRECTION
W/ P1546 EA. END
(4)
"Ø RODS
10" GA. EA. WAY
A-A
CEILING
CEILING, SEE ARCH.
1"=1'-0'
RIGID COLUMN FOR MED GAS SUPPORT DETAIL
A
A
(E) 4I BEAM
GAS COLUMN
MOUNTING PLATE
P1001, TYP.
NOTE:
1. WHERE NEW MEMBERS ARE CONNECTED TO EXISTING STRUCTURAL STEEL THAT IS
FIREPROOFED, THE FIREPROOFING SHALL BE REMOVED AS REQUIRED BY THE
SPECIFICATIONS AS IT MAY CONTAIN ASBESTOS. AFTER NEW STEEL IS INSTALLED
NEW FIREPROOFING SHALL BE PROVIDED.
NOTE:
1. WHERE NEW MEMBERS ARE CONNECTED TO EXISTING STRUCTURAL STEEL THAT IS
FIREPROOFED, THE FIREPROOFING SHALL BE REMOVED AS REQUIRED BY THE
SPECIFICATIONS AS IT MAY CONTAIN ASBESTOS. AFTER NEW STEEL IS INSTALLED
NEW FIREPROOFING SHALL BE PROVIDED.
MEDRAD INJECTOR
MOUNT ASSEMBLY
(E) 4I @ 4'-0" O.C. AT
4th FLR. INTERSTITIAL
FRAMING
(E) TRUSS
℄ INJECTOR
2'-1
(SEE ARCH.)
P6379, TYP.
P1001 OVER 3
(E) JOISTS
6" 6"
" SQ. x
" MEDRAD MOUNTING
PLATE W/ (4)
"Ø A307 BOLTS
COUNTERPOISE MOUNTING PL. BY
MEDRAD W/ (4)
"Ø A325 BOLTS
(BY MEDRAD) ON 6"Ø CIRCLE
B-B
C.G: WT. MAX. =
106 LBS.
6"Ø BOLT CIRCLE
1'-2
PL.
(4)
"Ø
A307 BOLTS
BB
1 1/2" = 1'-0"
MEDRAD INJECTOR SUPPORT DETAIL
NOTE:
1. WHERE NEW MEMBERS ARE CONNECTED TO EXISTING STRUCTURAL STEEL THAT IS
FIREPROOFED, THE FIREPROOFING SHALL BE REMOVED AS REQUIRED BY THE
SPECIFICATIONS AS IT MAY CONTAIN ASBESTOS. AFTER NEW STEEL IS INSTALLED
NEW FIREPROOFING SHALL BE PROVIDED.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
P
M
CONSTRUCTION DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
12/04/2020Revisions: Date:
A/E:
ISSUED FOR 65% C.D.
2020-09-02
ISSUED FOR 95% C.D.
2020-09-25
N
A
S
N
G
I
A
L
O
N
S I
EL
E
R
P
O
E F
M
T
R
E
D
E
S
E
E
R
S
I
A
O
R
F
I
A L
L
R
A
U T
N
R
G
E
R
I
T
E
O
F
C
R
T
S
U
S
A
T
C
No. 3930
S
N
A
H
A
M
I
ISSUED FOR 100% C.D.
2020-10-02
DATE SIGNED: 12/04/2020
664-CSI-1154W NUCLEAR MEDICINE PET- CT 2
SAN DIEGO, CA
IDS GROUP INC.
1 PETERS CANYON RD. STE.130
IRVINE, CA, 92606
(949) 387.8500
ISSUED FOR CONSTRUCTION
2020-11-06
ISSUED FOR CONSTRUCTION
2020-12-04
4TH. FLOOR FRAMING PLANS,
EQUIPMENT SCHEDULE AND DETAILS
JR DB
SF3
AutoCAD SHX Text
(E) 5GT-7 (E) 5GT-10
(E ) 5
T-
E
T
E
T
E
T
E
T
(E) 4I 9.5 @ 4'-0" O.C., TYP.
SHEET NOTES:
1. ALL STEEL BEAMS SHALL BE EQUALLY SPACED BETWEEN CONTROLLING
BEAMS, OR GRID LINES TYPICAL UNLESS NOTED OTHERWISW.
2. TOP OF STEEL AT ALL FLOOR FRAMING PLANS SHALL BE PER ARCH. DWGS..
3. SEE ARCH. DWGS. FOR ALL DIMENSIONS NOT SHOWN.
4. SEE MECH. DWGS. FOR EXACT LOCATION OF DUCT OPENINGS.
5. REMOVE (E) FURRING, (E) DECORATION, (E) ROOFING, (E) CEILING, (E)
EQUIPMENT, (E) FIXTURES, (E) UTILITIES, (E) CONDUITS, (E) PIPING & (E)
ARCH. ITEMS WHERE NECESSARY FOR NEW CONSTRUCTION. THEN INSTALL
NEW FINISHES PER ARCH. DWGS.
6. MODIFY, REROUTE OR RELOCATE (E) EQUIPMENT, (E) FIXTURES, (E)
UTILITIES, (E) CONDUITS & (E) PIPING WHERE NECESSARY TO
ACCOMMODATE NEW CONSTRUCTION (AVOIDING INTERFERENCE).
7. SEE 'AS-BUILT CONDITIONS NOTES' ON SF1 - GENERAL NOTES.
1/4" = =1'-0'
LEVEL 4 PARTIAL STRUCTURAL INTERSTITIAL FRAMING PLAN
N
54.3 5.1 5.2 5.3
J
H
G.1
G
SF6
NEW AC-420, SEE MECH.,
MAX. WT. = 5630 LBS.
NEW STEAM
HUMIDIFIER
SF6
SF5
NEW CATWALK
1/4" = =1'-0'
LEVEL 6 PARTIAL STRUCTURAL FRAMING PLAN
J
H
G.1
5.1 5.25
NEW OUTDOOR UNIT
(WATER / AIR SPLIT),
SEE MECH.
NEW OUTDOOR HEAT
PUMP UNIT, SEE 5/MH-502
G.1
(E ) 6
T-
(E ) 6
T-
(E ) 6
T-
(E) 6GT-1(E) 6GT-7
N
(E) 4I 9.5 @ 4'-0" O.C., TYP.
(E) 4I 9.5 @ 4'-0" O.C., TYP.
SF6
(E) 5" CONCRETE
SLAB, FIELD VERIFY
(E) 4I95 TO BE TEMPORARILY
REMOVED FOR
CONSTRUCTION ACCESS
(E) CATWALK
CUT (E) GUARDRAIL,
SEE 20/SF6
ADD L2x2x
POST,
SEE 19/SF6, TYP.
V
I F
NOTE:
1. WHERE NEW MEMBERS ARE CONNECTED TO EXISTING STRUCTURAL
STEEL THAT IS FIREPROOFED, THE FIREPROOFING SHALL BE REMOVED AS
REQUIRED BY THE SPECIFICATIONS AS IT MAY CONTAIN ASBESTOS. AFTER
NEW STEEL IS INSTALLED NEW FIREPROOFING SHALL BE PROVIDED.
4'-0"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
P
M
CONSTRUCTION DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
12/04/2020Revisions: Date:
A/E:
ISSUED FOR 65% C.D.
2020-09-02
ISSUED FOR 95% C.D.
2020-09-25
N
A
S
N
G
I
A
L
O
N
S I
EL
E
R
P
O
E F
M
T
R
E
D
E
S
E
E
R
S
I
A
O
R
F
I
A L
L
R
A
U T
N
R
G
E
R
I
T
E
O
F
C
R
T
S
U
S
A
T
C
No. 3930
S
N
A
H
A
M
I
ISSUED FOR 100% C.D.
2020-10-02
DATE SIGNED: 12/04/2020
664-CSI-1154W NUCLEAR MEDICINE PET- CT 2
SAN DIEGO, CA
IDS GROUP INC.
1 PETERS CANYON RD. STE.130
IRVINE, CA, 92606
(949) 387.8500
ISSUED FOR CONSTRUCTION
2020-11-06
ISSUED FOR CONSTRUCTION
2020-12-04
A
M
SF4
LEVEL 4 PARTIAL STRUCTURAL
FRAMING PLANS
JR DB
N.T.S.
COMMON DITRIBUTION CABINET UNIT
(8)
"Ø (A36) THREADED ROD
THRU FLOOR (HOLES TO BE
LARGER THAN BOLT DIAMETER
MAX.)
PRE-MANUFACTURED MOUNTING
BRACKET
" THK., A36 (MIN.) W/
(4)
"Ø M.B. TO CABINET FRAME,
(TYP. EA. BRACKET), 12 GA., A36
(MIN.)
(E) 5" CONC. SLAB
FRONT ELEVATION
C.G.: MAX. WT.
= 952 LB.
C.G.: MAX. WT.
= 952 LB.
SIDE ELEVATION
L3x3x
TYP. OF 2
(4)
"Ø HILTI KB-TZ EXPANSION
ANCHORS, (MIN. EFF. EMBED = 2",
ICC ESR-1917)
C.G.: MAX.
WT. = 1326#
(E) 5" CONC. SLAB
600T123-54 BACKING
CHANNEL
31.83"
N.T.S.
POWER DISTRIBUTION CABINET
(E) 5" CONC. SLAB
600T123-54 BACKING
CHANNEL
" WALL BOARD
C A
B L
E
M
A N
A G
E M
E N
T
R
A C
K
4.63"
C.G.: MAX. WT. = 1326#
(INCLUDES CABLE
MANAGEMENT RACK)
(8)
"Ø HEX WASHER SELF TAPPING,
SELF THREADING SHEET METAL
SCREWS TO BACKING CHANNEL & (2)
M12 BOLT TO CABINET (BRACKET BY
CONTRACTOR), SEE DETAIL 'A'
L3x3
"Ø (A36) THREADED
ROD THRU FLOOR, TYP.
AIR INTAKE
WATER INLET
& RETURN
SIDE VIEW
COOLING FAN
(EXHAUST)
6'-8 5/16"
8'-4 13/16"
N.T.S.
OUTDOOR COOLING UNIT
C.G.: MAX. WT.
= 410 LBS.
WATER INLET
& RETURN
C.G.: MAX. WT.
= 410 LBS.
3'-6 1/8"
OUTDOOR DRY COOLER NOTES:
1. DRYCOOLER UNIT TO BE INSTALLED BY MECHANICAL
CONTRACTOR AND MUST BE INSTALLED PRIOR TO
INSTALLATION OF ASSOCIATED INDOOR EQUIPMENT.
2. MOUNTING SURFACE FOR DRYCOOLER UNIT MUST BE
FLAT AND LEVEL.
"Øx2" MIN. EFFECTIVE
EMBEDMENT INTO
(E) STRUCTURAL SLAB,
HILTI KB-TZ SS (ICC ESR-1917)
(E) 5" STRUCTURAL
CONC. SLAB
NEOPRENE PADS TO
LEVEL UNIT
WEARING SLAB
AT ROOF
FRONT ELEVATIONSIDE ELEVATION
(E) 5" STRUCTURAL
CONC. SLAB
(2)
"Ø HILTI KB-TZ
EXPANSION ANCHORS,
(MIN. EFF. EMBED = 2",
ICC ESR-1917)
16 GA. STUDS
@ 16" O.C.
16 GA. TRACK W/
#10 SMS EA. SIDE
TO EA. STUD
"Ø HILTI KB-TZ EXPANSION
ANCHORS @ 16" O.C., (MIN.
EFF. EMBED = 2",
ICC ESR-1917)
N.T.S.
TYPICAL CANTILEVER BRACKET
NOTE:
ALL BRACES, NUTS, BOLTS AND OTHER MISCELLANEOUS HARDWARE SHALL BE UNISTRUT.
WALL FINISH,
SEE ARCH.
SIDE ELEVATION
VARIES, 2'-0" MAX.
WALL PER ARCH., 16 GA.
@ 16" O.C. MIN.
E E
A
R C
H
E L
E C
T
D
W G
S
C.G.
200A
100A
P1000 DIAGONAL
BRACE AT TOP, TYP.
C.G.: 46# MAX.
C.G.:
FRONT ELEVATION
NEW 600T150-54 BACKING
CHANNEL W/ (3) #10 TO EA. STUD
OVER (3) STUDS MIN. TOP & BOT.,
SEE 19/-
P1000
P1000 DIAGONAL BRACES
W/ P1843 EA. END, TYP.
P1000 W/ P1(2)
"Ø SMS
TO BACK CHANNELS
P1000
100A
200A
(E) CONC. SLAB
(1)
"Ø BOLT, TYP.
NEW 600T150-54
BACKING CHANNEL
NEW 600T150-54
BACKING CHANNEL
SAFETY SWITCH,
SEE ELECT.
(2)
"Ø BOLT, TYP.
WALL PER ARCH., 16 GA.
@ 16" O.C. MIN.
(E) CONC. SLAB
FRONT ELEVATION
P1000 DIAGONAL
BRACE
BRACKET DETAIL
33.06"
31.50"
22.02"
T Y
P
0.532"Ø
HOLE
0.438"Ø
HOLE
(N.T.S.)
PLAN
ELEVATION
STL. STUD (16 GA. MIN.)
(3) #10 SCREWS AT
EACH STUD,TYP.
INTERMEDIATE
CONDITION
SPLICE
CONDITION
END CONDITION
1" MIN.
IN LIEU OF
SCREWS
3- #10 SCREWS @ EA. END OF BACKING
TRACK AND @ EA. STUD
MIN. 6"x54 MIL UNPUNCHED
BACKING TRACK. DO NOT CUT
FLANGES BETWEEN
SUPPORTING STUDS
MIN.
MIN.
EXTEND BLKG
TO NEXT
STUD
80 # MAX
M
A X
M
I
N
T
Y
P
NOTE:
NOTCHING OR CUTTING OF BACKING PLATE
IS NOT PERMITTED EXCEPT AS SHOWN.
PLAN DETAIL
EXTEND BACKING ONE STUD
BAY BEYOND EDGE OF
CABINET OR EQUIP.
CABINET
EQUIPMENT
ISOMETRIC DETAIL
CJP IN LIEU
OF SCREWS
M I N
N.T.S.
TYPICAL BACKING STUD
M12 BOLT
"Ø TEK
SCREWS
DETAIL 'A'
(N.T.S.)
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
P
M
CONSTRUCTION DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
12/04/2020Revisions: Date:
A/E:
ISSUED FOR 65% C.D.
2020-09-02
ISSUED FOR 95% C.D.
2020-09-25
N
A
S
N
G
I
A
L
O
N
S I
EL
E
R
P
O
E F
M
T
R
E
D
E
S
E
E
R
S
I
A
O
R
F
I
A L
L
R
A
U T
N
R
G
E
R
I
T
E
O
F
C
R
T
S
U
S
A
T
C
No. 3930
S
N
A
H
A
M
I
ISSUED FOR 100% C.D.
2020-10-02
DATE SIGNED: 12/04/2020
664-CSI-1154W NUCLEAR MEDICINE PET- CT 2
SAN DIEGO, CA
IDS GROUP INC.
1 PETERS CANYON RD. STE.130
IRVINE, CA, 92606
(949) 387.8500
ISSUED FOR CONSTRUCTION
2020-11-06
ISSUED FOR CONSTRUCTION
2020-12-04
SF5
SECTIONS AND DETAILS
1" = 1'-0"
CATWALK DETAIL
(E) I's @ 4'-0" O.C.
" CONT. TOE PL.
WELD, TYP.
L2 x1 x
(LLH)
3'- 6"
1'- 9"
B-22 GA. DECK W/ 20 GA.
PLATE STEEL DECK W/
"Ø EFF. PUDDLE WELD
@ 24" O.C. MAX.
L2x2x
@ 4'-0" TYP.
POST
"x
"x
" CONT.
MID RAIL
BOT.
TYP.
TYP.
#10 SMS FLAT
HEAD @ 12" O.C.
"x3
"x
BENT PL.
4"4"
TYP.
TYP.
TYP.
NOTE:
1. WHERE NEW MEMBERS ARE CONNECTED TO EXISTING STRUCTURAL STEEL
THAT IS FIREPROOFED, THE FIREPROOFING SHALL BE REMOVED AS
REQUIRED BY THE SPECIFICATIONS AS IT MAY CONTAIN ASBESTOS. AFTER
NEW STEEL IS INSTALLED NEW FIREPROOFING SHALL BE PROVIDED.
(E) PRECAST
CONC. RAIL
(E) METAL
SIDING
4"
(E) TRUSS TOP
CHORD BEYOND
(E) W12x26
14'-0"
HSS6x6x
TYP. OF 3
4"
(E) 5" CONC. SLAB
HSS6x6x
(TYP. OF 3)
HSS6x6x
BEYOND,
(TYP. OF 4)
(E) 4TH. FLOOR
INTERSTITIAL FRAMING
LEVEL 5
3/4"=1'-0'
AIR HANDLING UNIT FRAME AND ANCHORAGE DETAIL
PL.
TYP.
4 TYP.1
3" 3"
(E) TRUSS
(E) TRUSS
LEVEL 4 - INTERSTITIAL
LEVEL 5
(E) TRUSS
LEVEL 4 -
INTERSTITIAL
(E) TRUSS BOT.
CHORD BEYOND
(E) 5" CONC. SLAB
HSS6x6x
TYP. OF 3
HSS6x6x
, TYP.
1'- 2"
EQ.EQ.
CG: AHU MAX.
WT. = 5630 LBS.
1'- 2"
5.25.1
14'-0"
5.2
H
(E) TRUSS
HSS3x3x
CG: AHU MAX.
WT. = 5630 LBS.
"Ø HANGER
RODS , TYP.
L3x3x
, TYP.
AREA OF NEW
CATWALK, SEE 15/-
HSS5x5x
TYP. OF 3
B-B
A-A
PLAN (BOTTOM)
OUTLINE OF
MECH. UNIT
CAP PL.
", FILLET WELDED
ALL-AROUND, TYP.
HSS6x6 BELOW UNIT, TYP.
TO EA.
PL.
(2)
" PLATES, ONE
EA. SIDE OF BRACE
6'- 0"
A
A
B B
14'-8"±
TYP.
(E) 4I9.5 THAT CAN BE TEMPORARILY
REMOVED FOR CONSTRUCTION
ACCESS AND RE-INSTALLED
NOTES:
1. WHERE NEW MEMBERS ARE CONNECTED TO EXISTING STRUCTURAL STEEL THAT IS FIREPROOFED, THE FIREPROOFING SHALL BE REMOVED AS REQUIRED BY THE SPECIFICATIONS AS IT MAY CONTAIN
ASBESTOS. AFTER NEW STEEL IS INSTALLED NEW FIREPROOFING SHALL BE PROVIDED.
2. ATTACH EACH SECTION OF AHU UNIT TO HSS 6X6 FRAME WITH (3)
" x 6" LONG FILLET WELDS ON
THE LONG SIDES AND (4)
" x 6" LONG FILLET WELDS AT THE TWO SHORT ENDS EQUALLY SPACED, TYPICAL.
TOP &
BOT.
4"
4"
BENT PL.
"x4"
C C
HSS3x3x
4"
4"
6'-7"
"Ø HANGER ROD W/ L3x3x
AT BRACE LOCATIONS
6"
TYP.
3"
TYP.
(TYP.)
HSS
6" TY
P.
3" TY
P.
1 1/2" = 1'-0'
HUMIDIFIER FRAME AND ANCHORAGE DETAIL
P1000
P1001 P1001
STEAM
HUMIDIFIER
P1000
P1000
P1000
P2225 P2225
CATWALK
L8x4x
(LLH) OVER
3 FLUTES, TYP.
P2073 SQ,
TYP.
LEVEL 5
(E) 5" CONC. SLAB
P2073A SQ W/ (4)
"Ø x
" EMBED HILTI KB-TZ
BOLTS, TYP.
P1031
P1031
(1)
"Ø BOLT
HAND TIGHT, TYP.
P1000, TYP.
B-B
(TYP.)
B
B
P1001
CATWALK
DECK
(4)
"Ø A307
BOLTS
L8x4
A-A
STEAM
HUMIDIFIER
CATWALK
L8x4x
(LLH)
P1000 W/ P1546
EA. END
C.G.:
MAX. WT. = 200 LBS.
(E) CONC. SLAB
A
A
1 1/2" = 1'-0'
DETAIL
NEW CATWALK
(E) 4I9.5 @ 4'-0" O.C. AT
INTERSTITIAL SPACE
(E) CATWALK
NEW L2x2x
@ 4'-0" O.C.
GUARDRAIL POST, SEE 15/-
1 1/2" = 1'-0'
DETAIL
PLAN
PLAN AT TOP RAIL
PLAN AT MID RAIL
NEW GUARDRAIL
TOP CUT AT 45°
(E) GUARDRAIL
TO BE CUT AT 45°
NEW POST BELOW
CJP
NEW CONT.
MID RAIL
(E) MID RAIL TO
BE CUT AT 45°
NEW POST
TYP.
CJP
NOTE:
1. WHERE NEW MEMBERS ARE CONNECTED TO EXISTING STRUCTURAL STEEL THAT IS
FIREPROOFED, THE FIREPROOFING SHALL BE REMOVED AS REQUIRED BY THE
SPECIFICATIONS AS IT MAY CONTAIN ASBESTOS. AFTER NEW STEEL IS INSTALLED
NEW FIREPROOFING SHALL BE PROVIDED.
"Ø HANGER
ROD, TYP.
L3x3x
2" @ 6", 6" EA. END
C-C
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
P
M
CONSTRUCTION DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
12/04/2020Revisions: Date:
A/E:
ISSUED FOR 65% C.D.
2020-09-02
ISSUED FOR 95% C.D.
2020-09-25
N
A
S
N
G
I
A
L
O
N
S I
EL
E
R
P
O
E F
M
T
R
E
D
E
S
E
E
R
S
I
A
O
R
F
I
A L
L
R
A
U T
N
R
G
E
R
I
T
E
O
F
C
R
T
S
U
S
A
T
C
No. 3930
S
N
A
H
A
M
I
ISSUED FOR 100% C.D.
2020-10-02
DATE SIGNED: 12/04/2020
664-CSI-1154W NUCLEAR MEDICINE PET- CT 2
SAN DIEGO, CA
IDS GROUP INC.
1 PETERS CANYON RD. STE.130
IRVINE, CA, 92606
(949) 387.8500
ISSUED FOR CONSTRUCTION
2020-11-06
ISSUED FOR CONSTRUCTION
2020-12-04
SF6
SECTIONS AND DETAILS
AutoCAD SHX Text
N.T.S.
GANTRY
(16) @ 8" = 128.00"
92.50" 6.40"
N.T.S.
PATIENT HANDLING SYSTEM
C.G.: MAX. WT.
= 6701 LB.
L3x3 / MC, SEE PLAN BELOW
(E) 5" CONC. SLAB
ELEVATION
1" THK. STL. BASE PL. (A36) W/ (34)
"Ø (A193-B7)
THREADED RODS THRU FLOOR (HOLE DIAMETER
NOT MORE THAN
" LARGER THAN BOLT
DIAMETER MAX.)
PLAN AT BASE
ELEVATION
C.G.: MAX. WT.
= 500 LB.
C.G.: MAX. WT.
= 726 LB.
C.G.: MAX. WT.
= 860 LB.
8"
TYP.
C.G.: MAX. WT.
= 726 LB.
EQ. EQ.
L3x3x
, TYP. OF 2 BELOW,
(2)
"Ø x 2" EMBED HILTI
KB-TZ (ONE EA. END)
L3x3x
, TYP. OF 2, (2)
"Ø x 2" EMBED
HILTI KB-TZ (ONE EA. END)
C.G.: MAX. WT.
= 500 LB.
C.G.: MAX. WT.
= 860 LB.
C.G.: MAX. WT.
= 6701 LB.
30.90"36.90"
PLAN AT BASE
L3x3x
L3x3x
L3x3x
MC10x22
L3x3x
MC6x15.3
A
A
(E) CONC. SLAB
MC6
L3x3x
MC10x22
L3x3x
A-A
LEVEL 4
(E) TRUSS
TOP CHORD
(E) CONC. SLAB
LEVEL 4
(E) TRUSS
TOP CHORD
(E) CONC. SLAB
MC10x22
1"=1'-0'
DETAIL
A
PL. 3 8
(E) CONC. SLAB
(E) TRUSS
TOP CHORD
PL.
", TYP.
MC10x22
1"=1'-0'
DETAIL
A-A
A
NOTES:
1. TRUSS VERTICAL AND DIAGONAL MEMBERS NOT SHOWN FOR CLARITY.
2. WHERE NEW MEMBERS ARE CONNECTED TO EXISTING STRUCTURAL STEEL THAT IS FIREPROOFED, THE FIREPROOFING SHALL BE REMOVED AS REQUIRED BY THE SPECIFICATIONS AS IT MAY CONTAIN
ASBESTOS. AFTER NEW STEEL IS INSTALLED NEW FIREPROOFING SHALL BE PROVIDED.
MC6x15.3
PL.
A-A
A
A
(E) CONC. SLAB
(E) TRUSS
TOP CHORD
PL.
", TYP.
MC6x15.3
LEVEL 4
LEVEL 4
(E) TRUSS
TOP CHORD
(E) CONC. SLAB
L3x3x
1"=1'-0'
DETAIL
PL.
PL.
L3x3x
LEVEL 4
LEVEL 4
(E) TRUSS
TOP CHORD
(E) CONC. SLAB
A
A
A-A
1" THK. STL. BASE PL. (A36) W/ (16)
"Ø (A193-B7)
THREADED RODS THRU FLOOR (HOLE DIAMETER
NOT MORE THAN
" LARGER THAN BOLT
DIAMETER MAX.), (2) PLACES
TYP. AT 'L'
TYP.
GENERAL CONTRACTOR:
1. VERIFY AREA BELOW UNIT IS CLEAR TO INSTALL UNDERSIDE OF SLAB REINFORCE
REINFORCEMENT.
2. RELOCATE ANY UTILITIES THAT INTERFERE WITH THE INSTALLATION OF THE UNDERSIDE
REINFORCEMENT.
3. WHERE NEW MEMBERS ARE CONNECTED TO EXISTING STRUCTURAL STEEL THAT IS
FIREPROOFED, THE FIREPROOFING SHALL BE REMOVED AS REQUIRED BY THE
SPECIFICATIONS AS IT MAY CONTAIN ASBESTOS. AFTER NEW STEEL IS INSTALLED NEW
FIREPROOFING SHALL BE PROVIDED.
GENERAL CONTRACTOR:
1. VERIFY AREA BELOW UNIT IS CLEAR TO INSTALL UNDERSIDE OF
SLAB REINFORCE REINFORCEMENT.
2. RELOCATE ANY UTILITIES THAT INTERFERE WITH THE
INSTALLATION OF THE UNDERSIDE REINFORCEMENT.
NOTES:
1. TRUSS VERTICAL AND DIAGONAL MEMBERS NOT SHOWN FOR CLARITY.
2. WHERE NEW MEMBERS ARE CONNECTED TO EXISTING STRUCTURAL STEEL THAT IS FIREPROOFED, THE FIREPROOFING SHALL BE REMOVED AS REQUIRED BY THE SPECIFICATIONS AS IT MAY CONTAIN
ASBESTOS. AFTER NEW STEEL IS INSTALLED NEW FIREPROOFING SHALL BE PROVIDED.
NOTES:
1. TRUSS VERTICAL AND DIAGONAL MEMBERS NOT SHOWN FOR CLARITY.
2. WHERE NEW MEMBERS ARE CONNECTED TO EXISTING STRUCTURAL STEEL THAT IS FIRE PROOFED, THE FIREPROOFING SHALL BE REMOVED AS REQUIRED BY THE SPECIFICATIONS AS IT MAY CONTAIN
ASBESTOS. AFTER NEW STEEL IS INSTALLED NEW FIREPROOFING SHALL BE PROVIDED.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
P
M
CONSTRUCTION DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
12/04/2020Revisions: Date:
A/E:
ISSUED FOR 65% C.D.
2020-09-02
ISSUED FOR 95% C.D.
2020-09-25
N
A
S
N
G
I
A
L
O
N
S I
EL
E
R
P
O
E F
M
T
R
E
D
E
S
E
E
R
S
I
A
O
R
F
I
A L
L
R
A
U T
N
R
G
E
R
I
T
E
O
F
C
R
T
S
U
S
A
T
C
No. 3930
S
N
A
H
A
M
I
ISSUED FOR 100% C.D.
2020-10-02
DATE SIGNED: 12/04/2020
664-CSI-1154W NUCLEAR MEDICINE PET- CT 2
SAN DIEGO, CA
IDS GROUP INC.
1 PETERS CANYON RD. STE.130
IRVINE, CA, 92606
(949) 387.8500
ISSUED FOR CONSTRUCTION
2020-11-06
ISSUED FOR CONSTRUCTION
2020-12-04
SF7
SECTIONS AND DETAILS
| Sheets and Views |
| SF1 GENERAL NOTES |
| SF2 GENERAL NOTES |
| SF3 4TH. FLOOR FRAMING PLANS, QUIPMENT SCHEDULE AND DETAILS |
| SF4 LEVEL 4 PARTIAL STRUCTURAL FRAMING PLANS |
| SF5 SECTIONS AND DETAILS |
| SF6 SECTIONS AND DETAILS |
| SF7 SECTIONS AND DETAILS |