This document package includes construction drawings and notes for a fire protection system upgrade project, along with details of a related federal contract opportunity. The construction drawings depict design criteria and layout for upgrading an existing wet pipe sprinkler system at a Department of Veterans Affairs nuclear medicine facility, in accordance with NFPA 13 and local codes. Key project elements include installing new quick response sprinkler heads, 1-inch piping, and ancillary equipment. General contractor responsibilities encompass supplying all labor, materials, permits and engineering required for a fully functioning fire protection system. The solicitation seeks bids for a construction contract valued around $1.2 million to fully renovate 1,200 square feet of space and install a new PET CT scanner at the VA facility, in compliance with specifications, drawings and a statement of work. The opportunity was posted by the VA Veterans Health Administration VISN 22.
View the file
Other files
Show all 44
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FIRE PROTECTION SHEET INDEX
1 NOTES, LEGEND AND ABBREVIATIONS
S.No. SHEET TITLE
P-001
FIRE PROTECTION FLOOR PLAN
SHEET
NUMBER
2 FP-102
FD FLOOR DRAIN
ABBREVIATION
FVC
BFP
AFF
FDC
ELEV
GV
AVG
SYMBOL
FIRE VALVE CABINET
DOUBLE CHECK BACKFLOW PREVENTER
ABOVE FINISHED FLOOR
FIRE DEPARTMENT CONNECTION
ELEVATION
GATE VALVE
AVERAGE
SYSTEM RISER
DESCRIPTION
LEGEND
UP UP PIPING
DOWN DOWN PIPING
GPM GALLON PER MINUTE
AHJ AUTHORITY HAVING JURISDICTION
FHV FIRE HOSE VALVE
1. WORK TO BE ACCOMPLISHED ON THESE DRAWINGS INCLUDES THE FURNISHING OF ALL LABOR, MATERIALS, EQUIPMENT, AND SERVICES NECESSARY FOR THE PROPER COMPLETE INSTALLATION OF WET PIPE ALL FIRE SPRINKLERS TENANT SYSTEM, IN ACCORDANCE WITH CBC 2019 AND NFPA 13 2016
EDITION WORK.
2. BEFORE SUBMITTING A PROPOSAL ON THE WORK CONTEMPLATED ON THESE DRAWINGS, EACH BIDDER SHALL EXAMINE THE SITE, CHECK AS TO THE MEANS OF MAKING CONNECTIONS AND SHALL BECOME FAMILIAR WITH ALL THE EXISTING CONDITIONS AND LIMITATIONS. NO EXTRAS WILL BE ALLOWED BECAUSE CONDITIONS WHICH MAY AFFECT THE WORK. ANY APPARENT VARIANCE OF THE PLANS FROM EXISTING CONDITIONS AT THE SITE SHALL BE CALLED TO THE ATTENTION OF THE ENGINEER DURING
THE BID PERIOD, SO CLARIFICATION CAN BE MADE BY ADDENDUM.
3. REQUIRED FEES, PERMITS, AND INSPECTIONS SHALL BE OBTAINED AND/OR ARRANGED BY THE
CONTRACTOR.
4. MATERIALS AND WORKMANSHIP SHALL COMPLY WITH ALL CURRENT AND APPLICABLE CODES,
ORDINANCES, LAWS, REGULATIONS AND INDUSTRY STANDARDS.
5. SHOULD THE CONTRACTOR PERFORM ANY WORK THAT DOES NOT COMPLY WITH THE REQUIREMENTS OF THE APPLICABLE BUILDING CODES, STATE LAWS, LOCAL ORDINANCES OR INDUSTRY STANDARDS, THE CONTRACTOR SHALL BEAR ALL COST ARISING TO CORRECT THE DEFICIENCIES.
6. CONTRACTOR SHALL INITIATE, MAINTAIN, AND SUPERVISE ALL SAFETY PRE-CAUTIONS REQUIRED FOR HIS WORK, INCLUDING REGULATIONS OF THE OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION
(OSHA).
7. DRAWINGS ARE TO SCALE AS NOTED, BUT THE CONTRACTOR SHALL REFER TO ARCHITECTURAL AND/OR STRUCTURAL DRAWINGS FOR EXACT LOCATION OF PARTITIONS, WALLS, BEAMS, SHAFTS, EQUIPMENT, ETC.
8. DRAWINGS SHOW THE GENERAL ARRANGEMENT OF BUILDING AND SHALL BE FOLLOWED AS CLOSELY
AS ACTUAL BUILDING CONSTRUCTION AND WORK OF OTHER TRADES WILL PERMIT.
9. MATERIALS AND EQUIPMENT SHALL BE STORED IN SUCH A PLACE AND IN SUCH A MANNER THAT A MINIMUM OF CONGESTION WILL RESULT. THE PLACING OF SUCH MATERIALS AND EQUIPMENT SHALL BE
SUBJECT TO THE APPROVAL OF THE OWNER.
10. CONTRACTOR SHALL COORDINATE WORK WITH OTHER TRADES.
11. CONTRACTOR SHALL SOLVE ALL CONFLICTS WITH OTHER TRADES AMONG THEMSELVES WHEN
POSSIBLE. GENERAL CONTRACTOR WILL ARBITRATE WHEN NECESSARY, AND HIS JUDGEMENT SHALL
STAND, WITH NO ADDITIONAL COST TO THE OWNER.
12. CONTRACTOR SHALL BEAR THE EXPENSE OF ALL CUTTING, PATCHING, REPAIRING OR REPLACING OF THE WORK OF OTHER TRADES REQUIRED BECAUSE OF HIS FAULT, ERROR OR TARDINESS BECAUSE OF
ANY DAMAGED DONE BY HIM.
13. CONTRACTOR SHALL PERIODICALLY CLEAR AWAY ALL DEBRIS, SURPLUS MATERIALS, ETC., RESULTING
FROM HIS WORK, LEAVING THE JOB AND THE EQUIPMENT FURNISHED IN A CLEAN CONDITION.
14. PLANS DO NOT INCLUDE ALL OFFSETS FOR COORDINATION WITH DUCT, LIGHTING AND STRUCTURE.
PROVIDE ALLOWANCES FOR REQUIRED OFFSETS.
15. PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL LABOR REQUIRED TO INSTALL A
COMPLETE AND OPERABLE SPRINKLER SYSTEM TO ACCOMMODATE THE PROPOSED WORK AS
INDICATED ON THE DRAWINGS AND AS REQUIRED BY CODE.
16. PIPING WORK SHALL BE COORDINATED WITH ALL TRADES INVOLVED. OFFSETS IN PIPING AROUND
OBSTRUCTIONS SHALL BE PROVIDED AT NO ADDITIONAL COST TO THE OWNER.
17. FIRE CAULK ALL FLOOR PENETRATIONS AND WHERE PIPING PENETRATES RATED WALLS.
1) THIS SUBMITTAL IS FOR A PROPOSED FIRE SPRINKLERS WORK.
2) BUILDING OCCUPANCY AND CLASSIFICATION IS LIGHT HAZARD.
3) BUILDING IS FULLY SPRINKLED.
4) NEW SPRINKLER HEADS SHALL BE OF THE QUICK RESPONSE TYPE.
5) MATERIALS SHALL BE NEW AND U.L. LISTED FOR FIRE SPRINKLER INSTALLATION.
6) NEW OVERHEAD PIPING SHALL BE AS FOLLOWS:
-1"- 1¼" - BLACK STEEL PIPE SCHEDULE 40 WITH THREADED FITTINGS.
7) ALL SYSTEM PIPING SHALL BE HYDROSTATICALLY TESTED AT 200 PSI FOR TWO HOURS OR
50 PSI ABOVE THE SYSTEM OPERATING PRESSURE, WHICHEVER IS GREATER.
8) ALL VALVES SHALL HAVE A PERMANENTLY AFFIXED SIGN INDICATING ITS FUNCTION.
9) IT IS THE RESPONSIBILITY OF THE OWNER TO MAINTAIN THE INTEGRITY OF THE FIRE
SPRINKLER SYSTEM.
10) THREADED PIPE AND FITTINGS SHALL HAVE THREADS CUT TO ANSI/ASME B1.20.1.
11) HYDRAULICALLY CALCULATE THE WET PIPE SPRINKLER SYSTEMS PER NFPA 13, AND UFC
3-600-01 DENSITY AND SPACING LISTED IN THE SPRINKLER DESIGN CRITERIA BELOW. FIELD
VERIFY SYSTEM DESIGN AND LAYOUT PRIOR TO FABRICATION OR INSTALLATION.
12) PROVIDE PIPE HANGERS AND SWAY BRACING ON ALL FIRE SPRINKLER SYSTEM PIPING AND
EQUIPMENT PER NFPA 13 AS REQUIRED BY UFC 3-600-01.
13) SEE ARCHITECTURAL DRAWINGS FOR ROOM FINISH SCHEDULE AND ROOM USE. SEE
ARCHITECTURAL, ELECTRICAL, MECHANICAL, AND TELECOMMUNICATION PLANS FOR THE
LOCATION OF THE CEILING-MOUNTED DEVICES, FIELD VERIFY AND COORDINATE THE
LOCATIONS OF ALL SYSTEM COMPONENTS INCLUDING PIPING, ALARMS, DRAINS, TEST
POINTS, ETC. WITH ARCHITECTURAL, STRUCTURAL, MECHANICAL, AND ELECTRICAL
EQUIPMENT WITHIN THE BUILDING.
14) PROVIDE AUXILIARY DRAINAGE WITH A DRAIN VALVE AND PLUG FOR ALL TRAPPED SECTION
OF PIPE, AS REQUIRED BY NFPA 13.
15) THESE DOCUMENT DEPICT PERFORMANCE LEVEL ENGINEERING DESIGN CRITERIA TO BE
UTILIZED AS GUIDANCE FOR THE PLANNING OF THE FIRE SPRINKLER SYSTEM BY THE
CONTRACTOR, PROVED COMPLETE DOCUMENTS FOR REVIEW AND APPROVAL FROM THE
ENGINEER OF RECORD AND AHJ PRIOR TO INSTALLATION. INCLUDE IN THE SHOP
DRAWINGS AND CALCULATION ANY ADDITIONAL EQUIPMENT NECESSARY TO PROVIDE A
COMPLETE INSTALLATION.
16) PIPE MAIN DRAIN TO OUTSIDE OF BUILDING.
GENERAL NOTES
GENERAL NOTES
2018 INTERNATIONAL PLUMBING CODE (IPC)
2018 INTERNATIONAL MECHANICAL CODE (IMC)
2019 NFPA 13
2018 INTERNATIONAL BUILDING CODE (IBC)
REFERECNE CODES
VALVE IN RISE
VALVE IN DROP
STRAINER
CHECK VALVE
GATE VALVE
PRESSURE CONTROL VALVE
RELIEF VALVE
PRESSURE GAUGE
TEST PORT
GALS GALLON
NC NONCOMBUSTIBLE
OS&Y
NIC
SQFT
OUTSIDE SCREW & YOKE
NOT IN CONTRACT
SQUARE FEET
SOV SOLENOID VALVE
NP NOT PERMITTED
PSIG POUNDS PER SQUARE INCH GAUGE
MIN MINIMUM
VLV VALVE
UH UNIT HEATER
SPRINKLER DESIGN CRITERIA
GENERAL ROOM/AREA
CLASSIFICATION
HAZARD
CLASSIFICATION
DENSITY
REQUIREMENTS
DURATION
OF SUPPLY
MAXIMUM
SPRINKLER
PROTECTION AREA
SPRINKLER
TEMPERATURE
HOSE
ALLOWANCE
LIGHT 0.10 GPS/SQFT OVER
MOST REMOTE 1500 SQFT.
60 MIN. 225 SQFT. ORDINARY 100 GPM
2019 INTERNATIONAL FIRE CODE (IFC)
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
664-CSI-1154W NUCLEAR MEDICINE PET- CT 2
SAN DIEGO, CA
IDS GROUP INC.
1 PETERS CANYON RD. STE. 130
IRVINE, CA 92606
949.387.8500
NOT FOR CONSTRUCTION
C :\U se rs
\M ar ilo u.
fra nc is co
\D oc um en ts \V
A S
D -N uc -M ed _A
R C
H -C en tra l_ R
TV
_m ar ilo u.
fra nc is co .rv t 9/
/2
3:
:0
P M
10/02/20Revisions: Date:
ISSUED FOR 100% C.D. 2020-10-02 FP-001
FIRE PROTECTION NOTES, LEGEND
AND ABBREVIATIONS
H H
J J
J.1 J.1
J.5 J.5
J.4 J.4
9'- 1"
2'-9 1/2" 8'-0"
5'-
1/ 2"
1'-6 1/2"
4.2
4.2
4.3
4.3
4.1
4.1
4'-1 1/2" 4'-0"
3.2
3.2
5.1
5.1
5.2
5.2
5.3
5.3
2'-3 1/2" 1'-8 1/2"
'-4
/2
7'-
0" 4'-
0"
1/
2" 3'-
/2
1'-8" 2'-9" 2'-11 1/2"
4'-
1/ 2"
3'- 6"
3'- 6"
4'-0"
4'-9"
'-2
6'-10"
1'-5"
3'- 2"
4'-0" 9'-4"
2'- 2"
1'- 8"
2'- 1"
1'-
2'-
5"
7'- 1"
3'- 9"
6'-1" 3'-2"
1'-
SCAN
EXAM RM
COMPUTER RM
EQUIPMENT
RM
CONTROL
SCAN
DESIGN / INSTALLATION / MODIFICATION OF
EXISTING WET PIPE SPRINKLER SYSTEM
SHALL BE PER NFPA13 2019 EDITION AND
SPECIFICATION 211313 WET PIPE SPRINKLER
SYSTEM. DESIGN CLASSIFICATION SHALL BE
LIGHT HAZARD WITH MINIMUM DESIGN
DENSITY OF 0.15/1500 SQ.FT.
FD-204
FP-204
LEVEL 4 - FIRE PROTECTION FLOOR
PLAN
10/02/20
N
1/4" = 1'-0"LEVEL 4 - AREA OF WORK - DEMO RCP 1
N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
664-CSI-1154W NUCLEAR MEDICINE PET- CT 2
SAN DIEGO, CA
IDS GROUP INC.
1 PETERS CANYON RD. STE. 130
IRVINE, CA 92606
949.387.8500
NOT FOR CONSTRUCTION
C :\U se rs
\M ar ilo u.
fra nc is co
\D oc um en ts \V
A S
D -N uc -M ed _A
R C
H -C en tra l_ R
TV
_m ar ilo u.
fra nc is co .rv t 9/
/2
3:
:0
P M
10/02/20Revisions: Date:
ISSUED FOR 100% C.D. 2020-10-02
LEGEND
NEW SPRINKLER HEAD.
EXISTING SPRINKLER HEAD