Atch 1 Self Performance Calculations.pdf

PDF 168 KB Posted

Attached to
Y1DA--CONSTRUCTION 664-CSI-115 4W Nuclear Medicine PET CT II
Solicitation number
36C25821B0012
Issued by

About this file

This document contains a self-performance worksheet and instructions for a federal construction contract opportunity with the Department of Veterans Affairs. The solicitation is for construction services to fully renovate approximately 1,200 square feet of an existing Nuclear Medicine PET CT department at a VA medical center to prepare the space and install a new PET CT scanner. The opportunity is set aside exclusively for service-disabled veteran-owned small businesses. The self-performance worksheet requires offerors to calculate the total contract price, subtract proposed profit and material costs, and show the dollar amount and percentage of the remaining work that will be self-performed by the prime contractor or its SDVOSB subcontractors. Offerors must also list any proposed subcontractors and the dollar value of those subcontracts, as well as the specific work activities they will self-perform. Upon contract completion, the awardee will submit actual self-performance calculations to the contracting office.

View the file

Other files

File Type Posted
RFIs 1-68 Amendment 0007.docx DOCX document
36C25821B0012 0007.docx DOCX document
36C25821B0012 0006.docx DOCX document
RFIs 1-67 Amendment 0006.docx DOCX document
RFIs 1-63 Amendment 0005.docx DOCX document
36C25821B0012 0005.docx DOCX document
VASD Siemens PET CT 2 Rm 4503 Final2 Shield Design.pdf PDF
270526 Grounding and Bonding for Comm Systems.pdf PDF
270533 Raceways and Boxes for Communications Systems.pdf PDF
271000 Control Comm and Cable Wiring.pdf PDF
271500 Communications Structured Cabling.pdf PDF
270511 Requirements for Comm Installations.pdf PDF
Wage Determination CA20210001 June 25 2021.pdf PDF
36C25821B0012 0004.docx DOCX document
RFIs 1-60 Amendment 0004 14 Jul 2021.docx DOCX document
2020-1106 Siemens Set.pdf PDF
Hazardous Materials Inspection Report 01-2015Part-3.pdf PDF
RFIs 1-60 13 Jul 2021 Amendment 0003.docx DOCX document
Hazardous Materials Inspection Report 01-2015Part-4.pdf PDF
36C25821B0012 0003.docx DOCX document
Hazardous Materials Inspection Report 01-2015Part-6.pdf PDF
Hazardous Materials Inspection Report 01-2015Part-1.pdf PDF
Hazardous Materials Inspection Report 01-2015Part-5.pdf PDF
Hazardous Materials Inspection Report 01-2015Part-2.pdf PDF
Site Walk Sign-In Sheet.pdf PDF
Questions Asked by Potential Bidder.docx DOCX document
36C25821B0012 0002.docx DOCX document
VASD Siemens PET_CT_2 Rm 4503.Final2 Shield Design.pdf PDF
datasheet_gh3_us.pdf PDF
Questions and Responses from Bidders.docx DOCX document
RFIs.docx DOCX document
2020-1001 FP set.pdf PDF
2020-1001 Electrical Set - Copy.pdf PDF
36C25821B0012 0001.docx DOCX document
2020-1001 Plumbing set.pdf PDF
2020-1001 Mechanical Set.pdf PDF
FINAL20201204 Plumbing Set.pdf PDF
Wage Determination June 10 2021.docx DOCX document
FINAL20201204 Architectural Set.pdf PDF
FINAL20201204 Mechanical Set.pdf PDF
FINAL20201204 Structural Set.pdf PDF
36C25821B0012.docx DOCX document
Final IFC Specification Manual.pdf PDF
Final17X001 Elec 20201203.pdf PDF
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Section J, Attachment 1

Attachment 1, Self Performance Worksheet

SELF-PERFORMED WORK AND LIMITATIONS ON SUBCONTRACTING

This procurement is a 100% SDVOSB set-aside. FAR 52.219-27 (OCT 2019) and VAAR 852.219-10 (JUL 2019)(DEVIATION) are incorporated into this solicitation and resulting contract. Offeror to complete and submit this worksheet with their bid documents. The period of time used to determine offeror’s compliance with the requirements for self-performance of work and the limitations on subcontracting will be the period the Agency uses to evaluate the bid of this pending Contract.

OFFEROR’S SELF PERFORMANCE WORKSHEET

Offeror’s are required to complete this Worksheet for this Contract.

a) Offeror’s total proposed price $___________

b) Subtract profit or fees $

c) Subtract cost of materials $

d) Offeror’s total estimated cost of contract performance for personnel (a-b-c=d) $____________

e) Offeror’s total estimated self-performed cost of contract performance incurred for personnel who are offeror’s employees or the employees of other SDVOSBC’s $___________

f) Offeror’s percentage of self-performed work (e/d X 100 = %) __________%

List of Proposed Subcontractors for this project /Value of those subcontracts:

Subcontractor $Value

Subcontractor $Value

Subcontractor $Value

Subcontractor $Value

Subcontractor $Value

Subcontractor $Value

List of “Self Performed” work activities to be performed by the SDVOSB:

Section J, Attachment 1

Attachment 1, Self Performance Worksheet

At completion of this Contract, the awardee shall complete and submit calculations to the Contracting

Department for the actual results achieved.

a) Offeror’s total proposed price $___________

b) Subtract profit or fees $

c) Subtract cost of materials $

d) Offeror’s total estimated cost of contract performance for personnel (a-b-c=d) $____________

e) Offeror’s total self-performed cost of contract performance incurred for personnel who are offeror’s employees or the employees of other SDVO SBC’s $___________

f) Offeror’s percentage of self-performed work (e/d X 100 = %) __________%

Definitions: (from 13 CFR 125.6)

Cost of the contract. All allowable direct and indirect costs allocable to the contract, excluding profit or fees.

Cost of contract performance incurred for personnel. Direct labor costs and any overhead which has only direct labor as its base, plus the concern's General and Administrative rate multiplied by the labor cost.

Cost of materials. Includes costs of the items purchased, handling and associated shipping costs for the purchased items

(which includes raw materials), off-the-shelf items (and similar proportionately high-cost common supply items requiring additional manufacturing or incorporation to become end items), special tooling, special testing equipment, and construction equipment purchased for and required to perform on the contract. In the case of a supply contract, the acquisition of services or products from outside sources following normal commercial practices within the industry are also included.

Personnel. Individuals who are “employees” under §121.106 of this chapter except for purposes of the HUBZone program, where the definition of “employee” is found in §126.103 of this chapter.

Subcontracting. That portion of the contract performed by a firm, other than the concern awarded the contract, under a second contract, purchase order, or agreement for any parts, supplies, components, or subassemblies which are not available off-the-shelf, and which are manufactured in accordance with drawings, specifications, or designs furnished by the contractor, or by the government as a portion of the solicitation. Raw castings, forgings, and moldings are considered as materials, not as subcontracting costs. Where the prime contractor has been directed by the Government to use any specific source for parts, supplies, components subassemblies or services, the costs associated with those purchases will be considered as part of the cost of materials, not subcontracting costs.