2026 Road Maintenance Program
TEMPORARY TREE AND PLANT PROTECTION 015639 - 1
SECTION 015639 - TEMPORARY TREE AND PLANT PROTECTION
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section includes general protection and pruning of existing trees and plants that are affected by execution of the Work, whether temporary or permanent construction.
B. Related Requirements:
1. Section 311000 "Site Clearing" for removing existing trees and shrubs.
1.3 DEFINITIONS
A. Caliper: Diameter of a trunk measured by at a height 6 inches (150 mm) above the ground for trees up to and including 4-inch (100-mm) size at this height and as measured at a height of 12 inches (300 mm) above the ground for trees larger than 4-inch (100-mm) size.
B. Caliper (DBH): Diameter breast height; diameter of a trunk as measured by at a height 54 inches (1372 mm) above the ground line.
C. Plant-Protection Zone: Area surrounding individual trees, groups of trees, shrubs, or other vegetation to be protected during construction and indicated on Drawings.
D. Tree-Protection Zone: Area surrounding individual trees or groups of trees to be protected during construction and defined by a circle concentric with each tree with a radius 1.5 times the diameter of the drip line unless otherwise indicated] [defined by a circle concentric with each tree with a radius 12 times the tree's caliper size and with a minimum radius of 96 inches unless otherwise indicated.
E. Vegetation: Trees, shrubs, groundcovers, grass, and other plants.
1.4 PREINSTALLATION MEETINGS
A. Preinstallation Conference: Conduct conference at Project site.
1. Review methods and procedures related to temporary tree and plant protection including, but not limited to, the following:
a. Tree-service firm's personnel, and equipment needed to make progress and avoid delays.
TEMPORARY TREE AND PLANT PROTECTION 015639 - 2
b. Arborist's responsibilities.
c. Quality-control program.
d. Coordination of Work and equipment movement with the locations of protection zones.
e. Trenching by hand or with air spade within protection zones.
f. Field quality control.
1.5 ACTION SUBMITTALS
A. Product Data: For each type of product.
B. Tree Pruning Schedule: Written schedule detailing scope and extent of pruning of trees to remain that interfere with or are affected by construction.
1. Species and size of tree.
2. Location on site plan. Include unique identifier for each.
3. Reason for pruning.
4. Description of pruning to be performed.
5. Description of maintenance following pruning.
1.6 INFORMATIONAL SUBMITTALS
A. Qualification Data: For arborist and tree service firm.
B. Certification: From arborist, certifying that trees indicated to remain have been protected during construction according to recognized standards and that trees were promptly and properly treated and repaired when damaged.
C. Maintenance Recommendations: From arborist, for care and protection of trees affected by construction during and after completing the Work.
D. Existing Conditions: Documentation of existing trees and plantings indicated to remain, which establishes preconstruction conditions that might be misconstrued as damage caused by construction activities.
1. Use sufficiently detailed photographs or video recordings.
2. Include plans and notations to indicate specific wounds and damage conditions of each tree or other plants designated to remain.
E. Quality-control program.
1.7 QUALITY ASSURANCE
A. Tree Service Firm Qualifications: An experienced tree service firm that has successfully completed temporary tree and plant protection work similar to that required for this Project and that will assign an experienced, qualified arborist to Project site during execution of the Work.
B. Quality-Control Program: Prepare a written program to systematically demonstrate the ability of personnel to properly follow procedures and handle materials and equipment during the Work
TEMPORARY TREE AND PLANT PROTECTION 015639 - 3
without damaging trees and plantings. Include dimensioned diagrams for placement of protection zone fencing and signage, the arborist's and tree-service firm's responsibilities, instructions given to workers on the use and care of protection zones, and enforcement of requirements for protection zones.
1.8 FIELD CONDITIONS
A. The following practices are prohibited within protection zones:
1. Storage of construction materials, debris, or excavated material.
2. Moving or parking vehicles or equipment.
3. Foot traffic.
4. Erection of sheds or structures.
5. Impoundment of water.
6. Excavation or other digging unless otherwise indicated.
7. Attachment of signs to or wrapping materials around trees or plants unless otherwise indicated.
B. Do not direct vehicle or equipment exhaust toward protection zones.
C. Prohibit heat sources, flames, ignition sources, and smoking within or near protection zones and organic mulch.
PART 2 - PRODUCTS
2.1 MATERIALS
A. Backfill Soil: of suitable moisture content and granular texture for placing around tree; free of stones, roots, plants, sod, clods, clay lumps, pockets of coarse sand, concrete slurry, concrete layers or chunks, cement, plaster, building debris, and other extraneous materials harmful to plant growth.
1. Planting Soil: Planting soil
B. Organic Mulch: Free from deleterious materials and suitable as a top dressing for trees and shrubs, consisting of one of the following:
1. Color: Natural.
C. Protection-Zone Fencing: Fencing fixed in position and meeting the following requirements:
1. Chain-Link Protection-Zone Fencing: fencing fabricated from minimum 2-inch (50-mm) opening, 0.148-inch- (3.76-mm-) diameter wire chain-link fabric; with pipe posts, minimum 2-3/8-inch- (60-mm-) OD line posts, and 2-7/8-inch- (73-mm-) OD corner and pull posts and 0.177-inch- (4.5-mm-) diameter bottom tension wire; with tie wires, hog ring ties, and other accessories for a complete fence system.
2. Plywood Protection-Zone Fencing: Plywood framed with four 2-by-4-inch (50-by-100-
mm) rails, with 4-by-4-inch preservative-treated wood posts spaced not more than 96 inches apart.
TEMPORARY TREE AND PLANT PROTECTION 015639 - 4
3. Wood Protection-Zone Fencing: Constructed of two 2-by-4-inch (50-by-100-mm) horizontal rails, with 4-by-4-inch preservative-treated wood posts spaced not more than 96 inches apart, and lower rail set halfway between top rail and ground.
4. Plastic Protection-Zone Fencing: Plastic construction fencing constructed of high-density extruded and stretched polyethylene fabric with 2-inch (50-mm) maximum opening in pattern and weighing a minimum of 0.4 lb/ft. (0.6 kg/m); remaining flexible from minus 60 to plus 200 deg F (minus 16 to plus 93 deg C); inert to most chemicals and acids;
minimum tensile yield strength of 2000 psi (13.8 MPa) and ultimate tensile strength of 2680 psi (18.5 MPa); secured with plastic bands or galvanized-steel or stainless-steel wire ties; and supported by tubular or T-shape galvanized-steel posts spaced not more than 96 inches (2400 mm) apart.
a. Height: 48 inches.
b. Color: High-visibility orange, nonfading.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Erosion and Sedimentation Control: Examine the site to verify that temporary erosion- and sedimentation-control measures are in place. Verify that flows of water redirected from construction areas or generated by construction activity do not enter or cross protection zones.
B. Prepare written report, endorsed by arborist, listing conditions detrimental to tree and plant protection.
3.2 PREPARATION
A. Locate and clearly identify trees, shrubs, and other vegetation to remain or to be relocated. Flag Tie a 1-inch blue vinyl tape around each tree trunk at 54 inches (1372 mm) above the ground.
B. Protect tree root systems from damage caused by runoff or spillage of noxious materials while mixing, placing, or storing construction materials. Protect root systems from ponding, eroding, or excessive wetting caused by dewatering operations.
C. Tree-Protection Zones: Mulch areas inside tree-protection zones and other areas indicated. Do not exceed indicated thickness of mulch.
1. Apply 2-inch uniform thickness of organic mulch unless otherwise indicated. Do not place mulch within 6 inches of tree trunks.
3.3 PROTECTION ZONES
A. Protection-Zone Fencing: Install protection-zone fencing along edges of protection zones in a manner that will prevent people from easily entering protected areas except by entrance gates.
Construct fencing so as not to obstruct safe passage or visibility at vehicle intersections where
TEMPORARY TREE AND PLANT PROTECTION 015639 - 5
fencing is located adjacent to pedestrian walkways or in close proximity to street intersections, drives, or other vehicular circulation.
1. Chain-Link Fencing: Install to comply with ASTM F 567 and with manufacturer's written instructions.
2. Posts: Set or drive posts into ground one-third the total height of the fence without concrete footings. Where a post is located on existing paving or concrete to remain, provide appropriate means of post support acceptable to Architect.
3. Access Gates: Install adjust to operate smoothly, easily, and quietly; free of binding, warp, excessive deflection, distortion, nonalignment, misplacement, disruption, or malfunction throughout entire operational range. Confirm that latches and locks engage accurately and securely without forcing or binding.
B. Protection-Zone Signage: Install protection-zone signage in visibly prominent locations in a manner approved by Architect. Install one sign spaced approximately every on protection-zone fencing, but no fewer than signs with each facing a different direction.
C. Maintain protection zones free of weeds and trash.
D. Maintain protection-zone fencing and signage in good condition as acceptable to Architect and remove when construction operations are complete and equipment has been removed from the site.
1. Do not remove protection-zone fencing, even temporarily, to allow deliveries or equipment access through the protection zone.
2. Temporary access is permitted subject to preapproval in writing by arborist if a root buffer effective against soil compaction is constructed as directed by arborist. Maintain root buffer so long as access is permitted.
3.4 EXCAVATION
A. General: Excavate at edge of protection zones and for trenches indicated within protection zones according to requirements in Section 312000 "Earth Moving" unless otherwise indicated.
B. Trenching within Protection Zones: Where utility trenches are required within protection zones, excavate under or around tree roots by hand or with air spade, or tunnel under the roots by drilling, auger boring, or pipe jacking. Do not cut main lateral tree roots or taproots; cut only smaller roots that interfere with installation of utilities. Cut roots as required for root pruning. If excavating by hand, use narrow-tine spading forks to comb soil and expose roots.
C. Redirect roots in backfill areas where possible. If encountering large, main lateral roots, expose roots beyond excavation limits as required to bend and redirect them without breaking. If encountered immediately adjacent to location of new construction and redirection is not practical, cut roots approximately 3 inches (75 mm) back from new construction and as required for root pruning.
D. Do not allow exposed roots to dry out before placing permanent backfill. Provide temporary earth cover or pack with peat moss and wrap with burlap. Water and maintain in a moist condition. Temporarily support and protect roots from damage until they are permanently relocated and covered with soil.
TEMPORARY TREE AND PLANT PROTECTION 015639 - 6
3.5 ROOT PRUNING
A. Prune tree roots that are affected by temporary and permanent construction. Prune roots
1. Cut roots manually by digging a trench and cutting exposed roots with sharp pruning instruments; do not break, tear, chop, or slant the cuts. Do not use a backhoe or other equipment that rips, tears, or pulls roots.
2. Cut Ends: .
3. Temporarily support and protect roots from damage until they are permanently redirected and covered with soil.
4. Cover exposed roots with burlap and water regularly.
5. Backfill as soon as possible according to requirements in Section 312000 "Earth
Moving."
B. Root Pruning at Edge of Protection Zone: Prune tree roots of the protection zone by cleanly cutting all roots to the depth of the required excavation.
C. Root Pruning within Protection Zone: Clear and excavate by hand or with air spade to the depth of the required excavation to minimize damage to tree root systems. If excavating by hand, use narrow-tine spading forks to comb soil to expose roots. Cleanly cut roots as close to excavation as possible.
3.6 CROWN PRUNING
A. Prune branches that are affected by temporary and permanent construction. Prune branches .
1. Prune to remove only broken, dying, or dead branches unless otherwise indicated. Do not prune for shape unless otherwise indicated.
2. Do not remove or reduce living branches to compensate for root loss caused by damaging or cutting root system.
3. Pruning Standards: Prune trees according to ANSI A300 (Part 1).
a. Type of Pruning: where indicated.
b. Specialty Pruning: where indicated.
B. Unless otherwise directed by arborist and acceptable to Architect, do not cut tree leaders.
C. Cut branches with sharp pruning instruments; do not break or chop.
D. Do not paint or apply sealants to wounds.
E. Provide subsequent maintenance pruning during Contract period as recommended by arborist.
3.7 REGRADING
A. Lowering Grade: Where new finish grade is indicated below existing grade around trees, slope grade beyond the protection zone. Maintain existing grades within the protection zone.
TEMPORARY TREE AND PLANT PROTECTION 015639 - 7
B. Lowering Grade within Protection Zone: Where new finish grade is indicated below existing grade around trees, slope grade away from trees as recommended by arborist unless otherwise indicated.
1. Root Pruning: Prune tree roots exposed by lowering the grade. Do not cut main lateral roots or taproots; cut only smaller roots. Cut roots as required for root pruning.
C. Raising Grade: Where new finish grade is indicated above existing grade around trees, slope grade beyond the protection zone. Maintain existing grades within the protection zone.
D. Minor Fill within Protection Zone: Where existing grade is or less below elevation of finish grade, fill with backfill soil. Place backfill soil in a single uncompacted layer and hand grade to required finish elevations.
3.8 FIELD QUALITY CONTROL
A. Inspections: Engage a qualified arborist to direct plant-protection measures in the vicinity of trees, shrubs, and other vegetation indicated to remain and to prepare inspection reports.
3.9 REPAIR AND REPLACEMENT
A. General: Repair or replace trees, shrubs, and other vegetation indicated to remain or to be relocated that are damaged by construction operations, in a manner approved by Architect.
1. Submit details of proposed pruning and repairs.
2. Perform repairs of damaged trunks, branches, and roots within 24 hours according to arborist's written instructions.
3. Replace trees and other plants that cannot be repaired and restored to full-growth status, as determined by Architect.
B. Trees: Remove and replace trees indicated to remain that are more than percent dead or in an unhealthy condition or are damaged during construction operations that Architect determines are incapable of restoring to normal growth pattern.
1. Small Trees: Provide new trees of same size and species as those being replaced for each tree that measures or smaller in caliper size.
2. Large Trees: Provide new tree(s) of caliper size for each tree being replaced that measures more than in caliper size.
a. Species: none.
C. Excess Mulch: Rake mulched area within protection zones, being careful not to injure roots.
Rake to loosen and remove mulch that exceeds a uniform thickness to remain.
D. Soil Aeration: Where directed by Architect, aerate surface soil compacted during construction.
Aerate 10 feet beyond drip line and no closer than 36 inches to tree trunk. Drill 2-inch diameter holes a minimum of 12 inches deep at 24 inches o.c. Backfill holes with an equal mix of augered soil and sand.
TEMPORARY TREE AND PLANT PROTECTION 015639 - 8
3.10 DISPOSAL OF SURPLUS AND WASTE MATERIALS
A. Disposal: Remove excess excavated material, displaced trees, trash, and debris and legally dispose of them off Owner's property.
END OF SECTION 015639
| PART 1 - GENERAL |
| 1.1 RELATED DOCUMENTS |
| A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section. |
| 1.2 SUMMARY |
| A. Section includes general protection and pruning of existing trees and plants that are affected by execution of the Work, whether temporary or permanent construction. |
| B. Related Requirements: |
| 1. Section 311000 "Site Clearing" for removing existing trees and shrubs. |
| 1.3 DEFINITIONS |
| A. Caliper: Diameter of a trunk measured by at a height 6 inches (150 mm) above the ground for trees up to and including 4-inch (100-mm) size at this height and as measured at a height of 12 inches (300 mm) above the ground for trees larger than 4-... |
| B. Caliper (DBH): Diameter breast height; diameter of a trunk as measured by at a height 54 inches (1372 mm) above the ground line. |
| C. Plant-Protection Zone: Area surrounding individual trees, groups of trees, shrubs, or other vegetation to be protected during construction and indicated on Drawings. |
| D. Tree-Protection Zone: Area surrounding individual trees or groups of trees to be protected during construction and defined by a circle concentric with each tree with a radius 1.5 times the diameter of the drip line unless otherwise indicated] [defi... |
| E. Vegetation: Trees, shrubs, groundcovers, grass, and other plants. |
| 1.4 PREINSTALLATION MEETINGS |
| A. Preinstallation Conference: Conduct conference at Project site. |
| 1. Review methods and procedures related to temporary tree and plant protection including, but not limited to, the following: |
| a. Tree-service firm's personnel, and equipment needed to make progress and avoid delays. |
| b. Arborist's responsibilities. |
| c. Quality-control program. |
| d. Coordination of Work and equipment movement with the locations of protection zones. |
| e. Trenching by hand or with air spade within protection zones. |
| f. Field quality control. |
| 1.5 ACTION SUBMITTALS |
| A. Product Data: For each type of product. |
| B. Tree Pruning Schedule: Written schedule detailing scope and extent of pruning of trees to remain that interfere with or are affected by construction. |
| 1. Species and size of tree. |
| 2. Location on site plan. Include unique identifier for each. |
| 3. Reason for pruning. |
| 4. Description of pruning to be performed. |
| 5. Description of maintenance following pruning. |
| 1.6 INFORMATIONAL SUBMITTALS |
| A. Qualification Data: For arborist and tree service firm. |
| B. Certification: From arborist, certifying that trees indicated to remain have been protected during construction according to recognized standards and that trees were promptly and properly treated and repaired when damaged. |
| C. Maintenance Recommendations: From arborist, for care and protection of trees affected by construction during and after completing the Work. |
| D. Existing Conditions: Documentation of existing trees and plantings indicated to remain, which establishes preconstruction conditions that might be misconstrued as damage caused by construction activities. |
| 1. Use sufficiently detailed photographs or video recordings. |
| 2. Include plans and notations to indicate specific wounds and damage conditions of each tree or other plants designated to remain. |
E. Quality-control program.
| 1.7 QUALITY ASSURANCE |
| A. Tree Service Firm Qualifications: An experienced tree service firm that has successfully completed temporary tree and plant protection work similar to that required for this Project and that will assign an experienced, qualified arborist to Project... |
| B. Quality-Control Program: Prepare a written program to systematically demonstrate the ability of personnel to properly follow procedures and handle materials and equipment during the Work without damaging trees and plantings. Include dimensioned dia... |
| 1.8 FIELD CONDITIONS |
| A. The following practices are prohibited within protection zones: |
| 1. Storage of construction materials, debris, or excavated material. |
| 2. Moving or parking vehicles or equipment. |
| 3. Foot traffic. |
| 4. Erection of sheds or structures. |
| 5. Impoundment of water. |
| 6. Excavation or other digging unless otherwise indicated. |
| 7. Attachment of signs to or wrapping materials around trees or plants unless otherwise indicated. |
| B. Do not direct vehicle or equipment exhaust toward protection zones. |
| C. Prohibit heat sources, flames, ignition sources, and smoking within or near protection zones and organic mulch. |
| PART 2 - PRODUCTS |
| 2.1 MATERIALS |
| A. Backfill Soil: of suitable moisture content and granular texture for placing around tree; free of stones, roots, plants, sod, clods, clay lumps, pockets of coarse sand, concrete slurry, concrete layers or chunks, cement, plaster, building debris, a... |
| 1. Planting Soil: Planting soil |
| B. Organic Mulch: Free from deleterious materials and suitable as a top dressing for trees and shrubs, consisting of one of the following: |
| 1. Color: Natural. |
| C. Protection-Zone Fencing: Fencing fixed in position and meeting the following requirements: |
| 1. Chain-Link Protection-Zone Fencing: fencing fabricated from minimum 2-inch (50-mm) opening, 0.148-inch- (3.76-mm-) diameter wire chain-link fabric; with pipe posts, minimum 2-3/8-inch- (60-mm-) OD line posts, and 2-7/8-inch- (73-mm-) OD corner and ... |
| 2. Plywood Protection-Zone Fencing: Plywood framed with four 2-by-4-inch (50-by-100-mm) rails, with 4-by-4-inch preservative-treated wood posts spaced not more than 96 inches apart. |
| 3. Wood Protection-Zone Fencing: Constructed of two 2-by-4-inch (50-by-100-mm) horizontal rails, with 4-by-4-inch preservative-treated wood posts spaced not more than 96 inches apart, and lower rail set halfway between top rail and ground. |
| 4. Plastic Protection-Zone Fencing: Plastic construction fencing constructed of high-density extruded and stretched polyethylene fabric with 2-inch (50-mm) maximum opening in pattern and weighing a minimum of 0.4 lb/ft. (0.6 kg/m); remaining flexible ... |
| a. Height: 48 inches. |
| b. Color: High-visibility orange, nonfading. |
| PART 3 - EXECUTION |
| 3.1 EXAMINATION |
| A. Erosion and Sedimentation Control: Examine the site to verify that temporary erosion- and sedimentation-control measures are in place. Verify that flows of water redirected from construction areas or generated by construction activity do not enter ... |
| B. Prepare written report, endorsed by arborist, listing conditions detrimental to tree and plant protection. |
| 3.2 PREPARATION |
| A. Locate and clearly identify trees, shrubs, and other vegetation to remain or to be relocated. Flag Tie a 1-inch blue vinyl tape around each tree trunk at 54 inches (1372 mm) above the ground. |
| B. Protect tree root systems from damage caused by runoff or spillage of noxious materials while mixing, placing, or storing construction materials. Protect root systems from ponding, eroding, or excessive wetting caused by dewatering operations. |
| C. Tree-Protection Zones: Mulch areas inside tree-protection zones and other areas indicated. Do not exceed indicated thickness of mulch. |
| 1. Apply 2-inch uniform thickness of organic mulch unless otherwise indicated. Do not place mulch within 6 inches of tree trunks. |
| 3.3 PROTECTION ZONES |
| A. Protection-Zone Fencing: Install protection-zone fencing along edges of protection zones in a manner that will prevent people from easily entering protected areas except by entrance gates. Construct fencing so as not to obstruct safe passage or vis... |
| 1. Chain-Link Fencing: Install to comply with ASTM F 567 and with manufacturer's written instructions. |
| 2. Posts: Set or drive posts into ground one-third the total height of the fence without concrete footings. Where a post is located on existing paving or concrete to remain, provide appropriate means of post support acceptable to Architect. |
| 3. Access Gates: Install adjust to operate smoothly, easily, and quietly; free of binding, warp, excessive deflection, distortion, nonalignment, misplacement, disruption, or malfunction throughout entire operational range. Confirm that latches and loc... |
| B. Protection-Zone Signage: Install protection-zone signage in visibly prominent locations in a manner approved by Architect. Install one sign spaced approximately every on protection-zone fencing, but no fewer than signs with each facing a different ... |
| C. Maintain protection zones free of weeds and trash. |
| D. Maintain protection-zone fencing and signage in good condition as acceptable to Architect and remove when construction operations are complete and equipment has been removed from the site. |
| 1. Do not remove protection-zone fencing, even temporarily, to allow deliveries or equipment access through the protection zone. |
| 2. Temporary access is permitted subject to preapproval in writing by arborist if a root buffer effective against soil compaction is constructed as directed by arborist. Maintain root buffer so long as access is permitted. |
| 3.4 EXCAVATION |
| A. General: Excavate at edge of protection zones and for trenches indicated within protection zones according to requirements in Section 312000 "Earth Moving" unless otherwise indicated. |
| B. Trenching within Protection Zones: Where utility trenches are required within protection zones, excavate under or around tree roots by hand or with air spade, or tunnel under the roots by drilling, auger boring, or pipe jacking. Do not cut main lat... |
| C. Redirect roots in backfill areas where possible. If encountering large, main lateral roots, expose roots beyond excavation limits as required to bend and redirect them without breaking. If encountered immediately adjacent to location of new constru... |
| D. Do not allow exposed roots to dry out before placing permanent backfill. Provide temporary earth cover or pack with peat moss and wrap with burlap. Water and maintain in a moist condition. Temporarily support and protect roots from damage until the... |
| 3.5 ROOT PRUNING |
| A. Prune tree roots that are affected by temporary and permanent construction. Prune roots |
| 1. Cut roots manually by digging a trench and cutting exposed roots with sharp pruning instruments; do not break, tear, chop, or slant the cuts. Do not use a backhoe or other equipment that rips, tears, or pulls roots. |
| 2. Cut Ends: . |
| 3. Temporarily support and protect roots from damage until they are permanently redirected and covered with soil. |
| 4. Cover exposed roots with burlap and water regularly. |
| 5. Backfill as soon as possible according to requirements in Section 312000 "Earth Moving." |
| B. Root Pruning at Edge of Protection Zone: Prune tree roots of the protection zone by cleanly cutting all roots to the depth of the required excavation. |
| C. Root Pruning within Protection Zone: Clear and excavate by hand or with air spade to the depth of the required excavation to minimize damage to tree root systems. If excavating by hand, use narrow-tine spading forks to comb soil to expose roots. Cl... |
| 3.6 CROWN PRUNING |
| A. Prune branches that are affected by temporary and permanent construction. Prune branches . |
| 1. Prune to remove only broken, dying, or dead branches unless otherwise indicated. Do not prune for shape unless otherwise indicated. |
| 2. Do not remove or reduce living branches to compensate for root loss caused by damaging or cutting root system. |
| 3. Pruning Standards: Prune trees according to ANSI A300 (Part 1). |
| a. Type of Pruning: where indicated. |
| b. Specialty Pruning: where indicated. |
| B. Unless otherwise directed by arborist and acceptable to Architect, do not cut tree leaders. |
| C. Cut branches with sharp pruning instruments; do not break or chop. |
| D. Do not paint or apply sealants to wounds. |
| E. Provide subsequent maintenance pruning during Contract period as recommended by arborist. |
| 3.7 REGRADING |
| A. Lowering Grade: Where new finish grade is indicated below existing grade around trees, slope grade beyond the protection zone. Maintain existing grades within the protection zone. |
| B. Lowering Grade within Protection Zone: Where new finish grade is indicated below existing grade around trees, slope grade away from trees as recommended by arborist unless otherwise indicated. |
| 1. Root Pruning: Prune tree roots exposed by lowering the grade. Do not cut main lateral roots or taproots; cut only smaller roots. Cut roots as required for root pruning. |
| C. Raising Grade: Where new finish grade is indicated above existing grade around trees, slope grade beyond the protection zone. Maintain existing grades within the protection zone. |
| D. Minor Fill within Protection Zone: Where existing grade is or less below elevation of finish grade, fill with backfill soil. Place backfill soil in a single uncompacted layer and hand grade to required finish elevations. |
| 3.8 FIELD QUALITY CONTROL |
| A. Inspections: Engage a qualified arborist to direct plant-protection measures in the vicinity of trees, shrubs, and other vegetation indicated to remain and to prepare inspection reports. |
| 3.9 REPAIR AND REPLACEMENT |
| A. General: Repair or replace trees, shrubs, and other vegetation indicated to remain or to be relocated that are damaged by construction operations, in a manner approved by Architect. |
| 1. Submit details of proposed pruning and repairs. |
| 2. Perform repairs of damaged trunks, branches, and roots within 24 hours according to arborist's written instructions. |
| 3. Replace trees and other plants that cannot be repaired and restored to full-growth status, as determined by Architect. |
| B. Trees: Remove and replace trees indicated to remain that are more than percent dead or in an unhealthy condition or are damaged during construction operations that Architect determines are incapable of restoring to normal growth pattern. |
| 1. Small Trees: Provide new trees of same size and species as those being replaced for each tree that measures or smaller in caliper size. |
| 2. Large Trees: Provide new tree(s) of caliper size for each tree being replaced that measures more than in caliper size. |
| a. Species: none. |
| C. Excess Mulch: Rake mulched area within protection zones, being careful not to injure roots. Rake to loosen and remove mulch that exceeds a uniform thickness to remain. |
| D. Soil Aeration: Where directed by Architect, aerate surface soil compacted during construction. Aerate 10 feet beyond drip line and no closer than 36 inches to tree trunk. Drill 2-inch diameter holes a minimum of 12 inches deep at 24 inches o.c. Bac... |
| 3.10 DISPOSAL OF SURPLUS AND WASTE MATERIALS |
| A. Disposal: Remove excess excavated material, displaced trees, trash, and debris and legally dispose of them off Owner's property. |