2026 Road Maintenance Program
GENERAL REQUIREMENTS 010000 - 1
SECTION 010000 - GENERAL REQUIREMENTS
PART 1 - GENERAL
1.1 PREVAILING WAGE REQUIREMENTS
A. Pennsylvania prevailing wage are required to be paid on this Contract.
1.2 INSPECTION SERVICES
A. Inspection services furnished by the Owner are predicated on an eight hour day, beginning not earlier than 7:00am and ending not later than 5:00 pm, prevailing time, for a five (5) day week, Monday through Friday. The Owner shall pay for these inspection services.
B. The Contractor may not elect to work overtime or on a Saturday without inspection unless authorized by the Engineer or Owner. All such additional costs for any inspection services rendered as stated herein shall be deducted from periodical or current estimates due the Contractor.
1.3 SUSPENSION OF WORK DUE TO NON0CONFORMANCE WITH SPECIFICATIONS
A. During the completion of the work, the Contractor’s employees must complete the contracted work in accordance with the specifications under the supervision of the foreman. If during the execution of the Contract, the Owner’s Representative determines the work is not being completed in accordance with the specifications, unnecessary damage to adjacent properties is resulting from carelessness or work outside of the limits of the project, the Owner’s Representative has been directed to administer the following procedures for resolving the matter.
B. The owner first will discuss the non-compliance of the project specifications, damage, or work beyond the project scope with the contractor’s foreman to resolve the issue. If a resolution cannot be achieved through discussion, the Owner’s Representative will mark the limit of acceptable scope of work and notify the foreman that any work beyond the defined scope of work will be at their own risk. Any work beyond the defined scope will not be a pay item and the Contractor will be responsible to pay for any damage that is outside the scope.
C. If the demarcation of the limits of work does not result in a resolution of the matter, the inspector will notify the Owner’s Engineer in Charge and/or owner of the situation and request authorization to shut the project down.
D. Once the authorization to shut the project down is given by the Owner’s Engineer in Charge and/or owner, the Inspector will issue to the foreman a Shut down Notice in which a copy will be given to the Borough and a copy forwarded to the Contractor’s office. The Shut Down notice will be very clear as to why the job is being shut down in detail and the corrections that must be completed in order for the project to proceed.
2026 Road Maintenance Program
GENERAL REQUIREMENTS 010000 - 2
E. If the foreman defies the Shut down Notice, the police will be sent to the job site to shut the job down.
F. The procedure will be reviewed at the pre-construction meeting prior to the start of work. The execution of the contract indicates the Contractor’s understanding and acceptance of this procedure.
1.4 LIQUIDATED DAMAGES
A. If the Contractor should fail to complete and have the work ready for final payment within the number of days specified in the Contract and extension thereof, liquidated damages in the amount of $500 (five hundred dollars) per calendar day will be charged against him. It is agreed that as actual damages are difficult to determine, this assessment is an equitable determination of loss to the owner and is not structured to serve as a penalty.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION (Not Used)
END OF SECTION 010000
| PART 1 - GENERAL |
| 1.1 PREVAILING WAGE REQUIREMENTS |
| A. Pennsylvania prevailing wage are required to be paid on this Contract. |
| 1.2 INSPECTION SERVICES |
| A. Inspection services furnished by the Owner are predicated on an eight hour day, beginning not earlier than 7:00am and ending not later than 5:00 pm, prevailing time, for a five (5) day week, Monday through Friday. The Owner shall pay for these ins... |
| B. The Contractor may not elect to work overtime or on a Saturday without inspection unless authorized by the Engineer or Owner. All such additional costs for any inspection services rendered as stated herein shall be deducted from periodical or curr... |
| 1.3 SUSPENSION OF WORK DUE TO NON0CONFORMANCE WITH SPECIFICATIONS |
| A. During the completion of the work, the Contractor’s employees must complete the contracted work in accordance with the specifications under the supervision of the foreman. If during the execution of the Contract, the Owner’s Representative determi... |
| B. The owner first will discuss the non-compliance of the project specifications, damage, or work beyond the project scope with the contractor’s foreman to resolve the issue. If a resolution cannot be achieved through discussion, the Owner’s Represen... |
| C. If the demarcation of the limits of work does not result in a resolution of the matter, the inspector will notify the Owner’s Engineer in Charge and/or owner of the situation and request authorization to shut the project down. |
| D. Once the authorization to shut the project down is given by the Owner’s Engineer in Charge and/or owner, the Inspector will issue to the foreman a Shut down Notice in which a copy will be given to the Borough and a copy forwarded to the Contractor’... |
| E. If the foreman defies the Shut down Notice, the police will be sent to the job site to shut the job down. |
| F. The procedure will be reviewed at the pre-construction meeting prior to the start of work. The execution of the contract indicates the Contractor’s understanding and acceptance of this procedure. |
| 1.4 LIQUIDATED DAMAGES |
| A. If the Contractor should fail to complete and have the work ready for final payment within the number of days specified in the Contract and extension thereof, liquidated damages in the amount of $500 (five hundred dollars) per calendar day will be ... |
| PART 2 - PRODUCTS (Not Used) |
| PART 3 - EXECUTION (Not Used) |