16-321216 FL - Asphalt Paving .pdf

PDF 258 KB Posted

Attached to
2026 Maintenance Road Program - Mill and Overlay
Solicitation number
US.210836
Issued by
Washington County, Pennsylvania

View the file

Other files

File Type Posted
15-321716 FL - Manufactured Traffic-Calming Devices 1.pdf PDF
38-000101 FL - Project Title Page.pdf PDF
4-017300 FL - Execution .pdf PDF
27-C-700-Rev-1-General-Conditions-2013 .pdf PDF
3-013233 FL - Photographic Documentation .pdf PDF
6-079200 FL - Joint Sealants .pdf PDF
11-014000 FL - Quality Requirements .pdf PDF
22-C430-Bid-Bond-Penal-Sum-Form-2018 .pdf PDF
7-016000 FL - Product Requirements .pdf PDF
30-Public Works Employment Verification Form.pdf PDF
48-18532 - 2026 Paving Program Plan Set - 01.09.2026.pdf PDF
46-C-3 - Panhandle Lot - Mill and Pave.pdf PDF
29-Cover Page.pdf PDF
20-c-615 payment bond 2013 .pdf PDF
45-C-4 - Hickory Grade - Road Widening.pdf PDF
44-St list and limits VA.pdf PDF
14-C-410-Bid-Form-rev1 VA.pdf PDF
35-012900 FL - Payment Procedures-.pdf PDF
28-SFT - Standard Details - Final.pdf PDF
47-Hickory Grade Road - Line Striping Map.pdf PDF
8-017700 FL - Closeout Procedures .pdf PDF
12-Table of Contents Generated by MasterWorks .pdf PDF
19-C-200-Rev-1-Instructions-to-Bidders (pennbid 2).pdf PDF
2-2026 Bid Documents 12-31-25 VA.pdf PDF
23-c-550 notice to proceed 2013 .pdf PDF
37-010000 FL - General Requirements.pdf PDF
40-013100 FL - Project Management and Coordination.pdf PDF
25-c-940 work change directive 2013 .pdf PDF
18-c-510 (rev 1) notice of award 2013.pdf PDF
32-Non Collusion Affidavit.pdf PDF
31-coi.pdf PDF
34-004393 FL - Bid Submittal Checklist.pdf PDF
21-c-941 change order 2013 .pdf PDF
17-011000 FL - Summary.pdf PDF
43-ADDENDUM NO2 1-8-26 VA.pdf PDF
1-2026 Cape Seal Program.pdf PDF
2-013200 FL - Construction Progress Documentation .pdf PDF
13-329200 FL - Turf and Grasses .pdf PDF
33-001113 FL - Advertisement for Bids.pdf PDF
42-ADDENDUM NO1 1-6-26 VA.pdf PDF
26-c-610 performance bond 2013 .pdf PDF
41-Wages 12-30-25 VA.pdf PDF
36-012500 FL - Substitution Procedures.pdf PDF
24-C-520-Agreement-Stipulated-Price-.pdf PDF
10-012200 FL - Unit Prices PAVING .pdf PDF
39-012600 FL - Contract Modification Procedures .pdf PDF
1-2026 Road Maintenance Program.pdf PDF
5-013300 FL - Submittal Procedures .pdf PDF
9-015639 FL - Temporary Tree and Plant Protection .pdf PDF
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2026 Road Maintenance Program

ASPHALT PAVING 321216 - 1

SECTION 321216 - ASPHALT PAVING

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section Includes:

1. Cold milling of existing asphalt pavement.

2. Warm-mix asphalt patching.

3. Warm-mix asphalt paving.

4. Warm-mix asphalt overlay.

5. Asphalt curbs.

6. Asphalt traffic-calming devices.

7. Asphalt surface treatments.

8. Stone base

9. Keyways

1.3 ACTION SUBMITTALS

A. Product Data: For each type of product.

1. Include technical data and tested physical and performance properties.

2. Job-Mix Designs: Certification, by authorities having jurisdiction, of approval of each job mix proposed for the Work.

3. Job-Mix Designs: For each job mix proposed for the Work seven (7) days prior to the pre-construction conference.

4. Penn DOT form TR465 must be supplied for each day the bituminous material is delivered to the job.

5. Penn DOT form CS-4171 (Certificate of Compliance) and form TR448A (Job Mix

Formula Report) being computer print outs for the weight of aggregate and asphalt cement content along with accumulated total tonnage listed and temperature of the mix leaving the plant must be submitted daily.

6. Tack Coat: Pen DOT certification and source of material must be submitted seven (7) days prior to the pre-construction meeting. Martial Supplier’s Bill of Lading must be submitted on a daily basis.

7. Seal Coat: Pen DOT certification and source of material must be submitted seven (7) days prior to the pre-construction meeting. Martial Supplier’s Bill of Lading must be submitted on a daily basis.

8. Paving Marking Paint: certification and source of material must be submitted seven (7) days prior to the pre-construction meeting.

ASPHALT PAVING 321216 - 2

1.4 INFORMATIONAL SUBMITTALS

A. Qualification Data: Penn DOT pre-qualification certifications from all contractors and suppliers meeting the appropriate classifications for the project and a minimum of three references for previous projects completed.

B. Material Certificates: For each paving material shall be certified by Penn DOT.

C. Material Test Reports: For each paving material, by a Penn DOT qualified testing agency.

D. Field quality-control reports.

1.5 QUALITY ASSURANCE

A. Manufacturer Qualifications: The qualified manufacturer shall be certified by Penn DOT.

B. Testing Agency Qualifications: certified by Penn DOT.

C. Regulatory Requirements: Comply with materials, workmanship, and other applicable requirements of Penn DOT Publication 408 for asphalt paving work.

1.6 DELIVERY, STORAGE AND HANDLING

A. Deliver geotextile materials to the project site in original packaging with manufacturer’s labels containing the brand name and type of material. Store geotextile materials and other paving fabrics in accordance with Section 735 in the current edition of Penn DOT’s publication 408.

B. Deliver pavement marking materials to the project site on original packages with seals unbroken and manufacturer’s labels containing brand name and type of material date of manufacture, and directions for storage. Store pavement marking materials in a clean, dry, protected location within temperature range required by manufacturer. Protect stored materials from direct sunlight.

1.7 FIELD CONDITIONS

A. Environmental Limitations: Do not apply asphalt materials, geotextile if subgrade is wet or excessively damp, if rain is imminent or expected before time required for adequate cure, or if the following conditions are not met:

1. The subgrade, sub-base or existing bituminous material is dry as determined by the

Owner.

2. The existing pavement has been cleaned in accordance with Section 401 od the current edition of Pen DOT’s publication 408.

3. Prime Coat: Minimum surface temperature of 40 deg F.

4. Tack Coat: Minimum surface temperature of 40 deg F and rising.

5. Slurry Seal: Comply with Section 482 in the current edition of Penn DOT’s publication

408.

ASPHALT PAVING 321216 - 3

6. Asphalt Base Course: Minimum surface temperature of 40 deg F and rising at time of placement.

7. Asphalt Surface Course: Minimum surface temperature of 40 deg F and rising at time of placement.

8. Bituminous Seal Coat: Minimum surface temperature of 60 deg F and rising an the time of placement.

B. Pavement marking paint: Proceed with pavement marking only on clean, dry surfaces and at a minimum surface temperature of 40 deg F for oil-based materials, 50 deg F for water-based materials, and not exceed 95 deg F. Apply paint marking in accordance with Section 962 ion the current edition of Penn DOT’s publication 408.

PART 2 - PRODUCTS

2.1 AGGREGATES

A. General: Use materials and gradations that have performed satisfactorily in previous installations.

B. Coarse Aggregate: Shall conform to the requirements in Section 703 in the current edition of Penn DOT publication 408, sound; angular crushed stone, crushed gravel.

C. Fine Aggregate: Shall conform to the requirements in Section 703 in the current edition of Penn DOT publication 408.

1. For warm-mix asphalt, limit natural sand to a maximum of 20 percent by weight of the total aggregate mass.

2.2 ASPHALT MATERIALS

A. Superpave Asphalt Binder: binder designation Superpave Asphalt Mixture Design, WMA Binder Course PG 64S-28, 0.0 to 0.3 million ESAL’s, 19 mm mix complying with requirements in section 409 in current edition of Penn DOT’s publication 408.

B. Superpave Wearing Surface for Scratch: binder designation Superpave Asphalt Mixture Design, HMA Binder Course PG 64S-28, 0.0 to 0.3 million ESAL’s, 9.5 mm mix complying with requirements in section 409 in current edition of Penn DOT’s publication 408.

C. Asphalt Cement: Shall conform to the requirements in section 702 in the current edition of Penn DOT’s publication 408 for AASHTO MP1, PG 64-28.

D. Superpave Fine Graded Wearing Surface: Superpave asphalt mixture design, HMA Binder Course PG64S-28, 0.0 to 0.3 million ESAL’s, 9.5 mm mix complying with requirements in section 409 in current edition of Penn DOT’s publication 408. The bituminous wearing surface shall incorporate coerces aggregate having a skid resistance level (SRL) designation of H or better, supplied form sources approved for this classification as defined and listed on Penn DOT’s bulletin No.14.

ASPHALT PAVING 321216 - 4

E. Emulsified Asphalt Slurry Coat: Shall conform with section 482 in the current edition of Penn DOT’s publication 408.

F. Tack Coat: Shall be warm mixed and conform to the requirements in section 460 in the current edition of Penn DOT’s publication 408 for emulsified asphalt class AE-T. Water: Potable.

G. Joint Sealant: Shall conform with requirements for AET, Class E-8 in the current edition of Penn DOT’s publication 408.

2.3 AUXILIARY MATERIALS

A. Recycled Materials for Warm-Mix Asphalt Mixes: Reclaimed asphalt pavement; reclaimed, unbound-aggregate base material; and recycled from sources and gradations that have performed satisfactorily in previous installations, equal to performance of required warm-mix asphalt paving produced from all new materials.

B. Herbicide: Commercial chemical for weed control, registered by the EPA, and not classified as "restricted use" for locations and conditions of application. Provide in granular, liquid, or wettable powder form.

C. Sewer Brick: shall meet the specifications set forth in the latest version of AASHTO Designation M-91, Grade SS.

D. Water: Portable.

E. Paving Geotextile: Shall conform with section 735 in the current edition of Penn DOT’s publication 408 for non-woven, Class 4 geotextile.

F. Joint Sealant: ASTM D 6690, warm-applied, single-component, polymer-modified bituminous sealant.

G. Paving Fabric: Shall be “Petromat”, as manufactured by Phillips Petroleum Co. or an approved equal. The fabric shall be nom-woven polypropylene fabric having the following properties:

1. Tensile Strength, either direction, minimum per square inch 50 lbs

2. Elongation, warp direction, 20 lbs, inches maximum 0.5

3. Elongation, fill direction, 50 lbs, inches maximum 1.0

4. Weigh, oz/sq. yd. (fused two sides) 3-5

5. Color Black

2.4 MIXES

A. Warm-Mix Asphalt: Dense-graded, warm-laid, warm-mix asphalt plant mixes and complying with the following requirements:

1. Provide mixes with a history of satisfactory performance in geographical area where Project is located.

ASPHALT PAVING 321216 - 5

B. Base Course: Superpave Asphalt Binder: binder designation Superpave Asphalt Mixture Design, HMA Binder Course PG64S-28, 0.0 to 0.3 million ESAL’s, 19 mm mix complying with requirements in section 409 in current edition of Penn DOT’s publication 408.

C. Surface Course: < Superpave Asphalt Binder: binder designation Superpave Asphalt Mixture Design, HMA Binder Course PG64S-28, 0.0 to 0.3 million ESAL’s, 9.5 mm mix complying with requirements in section 409 in current edition of Penn DOT’s publication 408.

D. Emulsified-Asphalt Slurry: Shall conform with section 482 in the current edition of Penn DOT’s publication 408.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Verify that subgrade is dry and in suitable condition to begin paving.

B. Verify the crown of two (2) percent across each traffic lane by using a template.

C. Proceed with paving only after unsatisfactory conditions have been corrected.

3.2 PREPARATION

A. Protection: Provide protective materials, procedures, and worker training to prevent asphalt materials from spilling, coating, or building up on curbs, driveway aprons, manholes, and other surfaces adjacent to the Work.

B. Proof-roll subgrade below pavements with heavy pneumatic-tired equipment to identify soft pockets and areas of excess yielding. Do not proof-roll wet or saturated subgrades.

1. Completely proof-roll subgrade in one direction. Limit vehicle speed to 3 mph.

2. Proof roll with a loaded 10-wheel, tandem-axle dump truck weighing not less than 15 tons.

3. Excavate soft spots, unsatisfactory soils, and areas of excessive pumping or rutting, as determined by Architect, and replace with compacted backfill or fill as directed.

3.3 COLD MILLING

A. Clean existing pavement surface of loose and deleterious material immediately before cold milling. Remove existing asphalt pavement by cold milling to grades and cross sections indicated.

1. Mill to a depth of 3 inches.

2. Mill to a uniform finished surface free of excessive gouges, grooves, and ridges.

3. Control rate of milling to prevent tearing of existing asphalt course.

4. No milling shall damage any brisk, concrete or stone base.

5. Milling shall be completed to a uniform crown section so that the milled centerline of the street is three (3) inches above the existing gutter grade. If the crown is not maintained, ASPHALT PAVING 321216 - 6 the contractor shall re-mill the street or establish the crown with superpave bituminous binder.

6. Repair or replace curbs, driveway aprons, manholes, and other construction damaged during cold milling.

7. Excavate and trim unbound-aggregate base course, if encountered, and keep material separate from milled warm-mix asphalt.

8. Patch surface depressions deeper than 1inch after milling, before wearing course is laid.

9. Handle milled asphalt material according to approved waste management plan required in

Section 017419 "Construction Waste Management and Disposal."

10. Keep milled pavement surface free of loose material and dust.

11. Do not allow milled materials to accumulate on-site.

B. Cold milling equipment

1. Milling shall be completed with a track equipped milling machine with a minimum five

(5) foot wide cutting head capable of achieving uniform profiling control of the cross section.

2. No milling machines with fixed axels and wheels will be permitted, except for keyways.

C. Penalties

1. A $500.00 penalty shall be assessed for each occurrence that dust is not control during the cold milling process.

2. A $500.00 per calendar day penalty shall assessed for each day after ten (10) days that streets remain open after milling has been completed without new asphalt placement.

3.4 PATCHING

A. Asphalt Pavement: Saw cut perimeter of patch and excavate existing pavement section to sound base. Excavate rectangular or trapezoidal patches, extending 12 inches into perimeter of adjacent sound pavement, unless otherwise indicated. Cut excavation faces vertically. Remove excavated material. Recompact existing unbound-aggregate base course to form new subgrade.

B. Portland Cement Concrete Pavement: Break cracked slabs and roll as required to reseat concrete pieces firmly.

1. Remove disintegrated or badly cracked pavement. Excavate rectangular or trapezoidal patches, extending into perimeter of adjacent sound pavement, unless otherwise indicated. Cut excavation faces vertically. Recompact existing unbound-aggregate base course to form new subgrade. The patch shall be completed form joint to joint.

C. Brick Pavement: Remove the existing bricks and unsuitable soil. Cut excavation feces vertically. Compact the remaining sub-base with mechanical wacker or vibrating roller.

D. Utility Patches in Warm Mix Asphalt Pavement:

1. Install six (6) inches of Penn DOT 2A limestone.

2. Compact stone with mechanical wacker or vibrating roller.

ASPHALT PAVING 321216 - 7

3. Apply AET tack coat to the existing bituminous pavement edges at a rate of 0.05 to 0.15 gal./sq. yd.

4. Install six (6) inches, compacted depth of superpave 25 mm binder asphalt mixture design HMA binder course, PG 64-22

E. Patching Concrete Pavement or Utility Patches in Concrete Pavement:

1. Install six (6) inches of Penn DOT 2A limestone.

2. Compact stone with mechanical wacker or vibrating roller.

3. Apply AET tack coat to the existing bituminous pavement edges at a rate of 0.05 to 0.15 gal./sq. yd.

4. Install six (6) inches, compacted depth of superpave 25 mm binder asphalt mixture design

HMA binder course, PG 64-22

F. Patching Brick Streets or Utility Patches in Brick Streets:

1. Install six (6) inches of Penn DOT 2A limestone.

2. Compact stone with mechanical wacker or vibrating roller.

3. Apply AET tack coat to the existing bituminous pavement edges at a rate of 0.05 to 0.15 gal./sq. yd.

4. Install six (6) inches, compacted depth of superpave 25 mm binder asphalt mixture design

HMA binder course, PG 64-22

G. Tack Coat: Before placing patch material, apply tack coat uniformly to vertical asphalt surfaces abutting the patch. Apply at a rate of 0.05 to 0.15 gal./sq. yd.

1. Allow tack coat to cure undisturbed before applying warm-mix asphalt paving.

2. Avoid smearing or staining adjoining surfaces, appurtenances, and surroundings. Remove spillages and clean affected surfaces.

3.5 KEYWAYS

A. The contractor shall be required to cut 24 inch wide keyway at the limits of work of the street or road to be paved and around inlets and manholes. The key way she'll be cut to create a straight line for matching the new payment with existing payment. The keyways shall be cut as directed by the engineer/owner.

B. The existing bituminous surface shall be trimmed to a near true line with a straight vertical edges free of irregularities for a minimum depth of one and a half inch. Sufficient pavement shell than be removed to provide a minimum 1 and 1/2 inch thickness of bituminous concrete overlay in area where the new pavement is to a but the existing pavement. Immediately prior to placement of the bituminous concrete overlay the trim edges of the existing payment shall be treated with a light coating of a asphaltic cement or emultion to bond the new pavement to the old pavement. The new pavement surface shall be finished flush with adjacent pavement.

C. The depth of the keyway will be inch and a half deep to be cut parallel with the intersection or on a 6 to 1 diagonal where the pavement does not end at an intersection.

ASPHALT PAVING 321216 - 8

3.6 STREET EXCAVATION AND SUBGRADE PREPARATION

A. The contractor shall be required to excavate the existing Street material and sub base to a depth of 16 inches. The contractor shall remove all material outside to an approved dump site.

B. Extreme care shall be taken during removal of the existing bituminous pavement. All excavation equipment shall remain on the existing roadway so s not to disturb the base and subgrade. The use The Gradall or an excavator with knuckle bucket is the preferred method of excavation. Trucks shall not be permitted to gravel on the subgrade.

C. When the brick base is not to be removed in the bricks are to be safe the existing the Terminus pavement shall be removed from the existing brick base with a grotto and loaded into trucks with the rattle or a rubber tired loader. No track equipment should be used.

D. Compaction she'll be performed by means of a roller Wayne not less than 10 tons or other approved compaction equipment.

E. The engineer or owner representative show approve of sub-grade prior to placement of initial pavement Court. Installation of any or all portion of the payment without subgrade approval by the engineer or owner is performed at the contractor’s risk.

F. Approval of the Subgrade by the engineer/owner shall not relieve the contractor of the responsibility to protect the subgrade from damage caused from excessive moisture, riding from trucks or heavy equipment or from any other course. Can you damage a curing to the subgrade either before or during Paving operations shall be corrected at the contractor’s expense.

G. Find grading of the roadways shall be performed parallel to the center line, observing the profiles, crown and a cross sections show on a contract drawings. Find grating shall not be performed when the subgrade is frozen or excessively wet.

H. Prior to placement of the sub-base material the sub great surface shall be prepared by filling in will rats erosion and all other ground disturbance regardless of the cause. The ground surface Shelby find grated so that after impaction the subgrade surface will be at the proper elevation to accommodate the pavement structure.

3.7 REPAIRS

A. Leveling Course: Install and compact leveling course consisting of warm-mix asphalt surface course to level sags and fill depressions deeper than 1 inch in existing pavements.

B. Crack and Joint Filling: Remove existing joint filler material from cracks or joints to a depth of Complete in accordance with the specifications of section 469 of Penn DOT publication 408.

3.8 SURFACE PREPARATION

A. Immediately before placing asphalt materials, remove loose and deleterious material from substrate surfaces. Ensure that prepared subgrade is ready to receive paving.

ASPHALT PAVING 321216 - 9

B. Clean existing pavement surface of loose material immediately before installing any bituminous material or fabric. Cleaning shall be completed with power broom or mechanical sweepers capable of collecting the material and disposing of site. If in the opinion of the owner the cleaning is not adequate the contractor shall repeat the procedure until it's deemed satisfactory.

C. All joints in existing concrete pavements and larger cracks in bituminous pavement inch and half (1 ½) or larger shall be thoroughly cleaned to death of 1 inch into and replaced with sand and asphalt grout.

D. The existing pavement surface shall be brought to uniform grade in a cross-section where in a specified. The surface of the existing payment shall be brought to the same transverse slope in longitudinal cross-section as the finished pavement section using scratch coat of superpave bituminous binder after at a variable thickness.

E. Herbicide Treatment: Apply herbicide according to manufacturer's recommended rates and written application instructions. Apply to dry, prepared subgrade or surface of compacted-aggregate base before applying paving materials.

1. Mix herbicide with prime coat if formulated by manufacturer for that purpose.

F. Cutback Prime Coat: Apply uniformly over surface of compacted unbound-aggregate base course at a rate of 0.15 to 0.50 gal./sq. yd. Apply enough material to penetrate and seal, but not flood, surface. Allow prime coat to cure.

1. If prime coat is not entirely absorbed within 24 hours after application, spread sand over surface to blot excess asphalt. Use enough sand to prevent pickup under traffic. Remove loose sand by sweeping before pavement is placed and after volatiles have evaporated.

2. Protect primed substrate from damage until ready to receive paving.

G. Emulsified Asphalt Prime Coat: Apply uniformly over surface of compacted unbound-aggregate base course at a rate of 0.10 to 0.30 gal./sq. yd. per inch depth. Apply enough material to penetrate and seal, but not flood, surface. Allow prime coat to cure.

1. If prime coat is not entirely absorbed within 24 hours after application, spread sand over surface to blot excess asphalt. Use enough sand to prevent pickup under traffic. Remove loose sand by sweeping before pavement is placed and after volatiles have evaporated.

2. Protect primed substrate from damage until ready to receive paving.

H. Tack Coat: Apply uniformly to surfaces of existing pavement at a rate of 0.05 to 0.15 gal./sq.

yd.

1. Allow tack coat to cure undisturbed before applying warm-mix asphalt paving.

2. Avoid smearing or staining adjoining surfaces, appurtenances, and surroundings. Remove spillages and clean affected surfaces.

I. After the subgrade or existing pavement surface has been prepared as specified hearing, the contractor shall check off frames, covers, grades, water valve boxes in all other miscellaneous castings that are located in a proposed pavement area to ensure that all such items have been accurately positioned and set your proper slope in elevation. No depression or mounds will be permitted in a pavement to accommodate inaccuracies accuracies in the settings of these

ASPHALT PAVING 321216 - 10

apprentices or corrective work that might be necessary she'll be performed at the contractor’s expense.

J. All vertical surface in curbs, structures gutters, and existing pavement in contact with a new bituminous mixtures shall be painted with a uniform coating of an approved bituminous emulsion or priming material. Extreme care shall be exercised in application of this material to prevent splattering or staining of surfaces that are to remain exposed. Work that is stained as a result of the contractor operations shall be repaired or replaced at the contractor’s expense.

Apply uniformly to existing pavement surfaces at a rate of 0.20 to 0.30 gal./sq. yd.

3.9 PAVING GEOTEXTILE INSTALLATION

A. Place paving geotextile promptly according to manufacturer's written instructions. Broom or roll geotextile smooth and free of wrinkles and folds. Overlap longitudinal joints 6 inches and transverse joints 6 inches.

B. Protect paving geotextile from traffic and other damage, and place warm-mix asphalt overlay the same day.

C. The contractor shall install Class 4 geotextile fabric on the subgrade prior to installing the stone subbase or warm mix asphalt paving.

1. The contractor shall install Class 4 geotextile fabric in accordance with the requirements set forth is section 212 in the current edition of the Penn DOT publication 408. Tha maximum overlap between rolls is 12 inches with no additional compensation for the cost of overlapping or pins required for installation.

2. Protect the geotextile fabric from traffic and other damage and place warm mix asphalt paving overlay the same day.

3. The geotextile fabric shall be pinned to the sub-base using eight (8) penny aluminum nails spaced twelve (12) inches center to center.

4. Trucks shall not be permitted to travel over the fabric when aggregate is being installed.

The aggregate shall be placed on the fabric by dumping the trucks and then blading the aggregate onto the fabric with a front loader.

3.10 STONE SUBBASE INSTALLATION

A. The contractor shall be required to install six (6) inches of AASHTO No.1 limestone or air cooled slag aggregate meeting the standards set forth section 703 in the cur4rent edition of the Penn DOT’s publication 408.

1. The stone shall be installed in lifts no larger that four (4) inches in depth.

2. Spread uniformly on the initial layers of fine material to full width. In areas inaccessible to spreading equipment, spread material directly from the trucks. Remove segregate material and replace with well graded material. Do not spread the material more than the distance completed in an average day’s work ahead of choking and compacting.

B. The contractor shall be required to install AASHTO No.10 limestone or air cooled slag aggregate after each of the layers of the AASHTO No.1 limestone or air cooled slag.

ASPHALT PAVING 321216 - 11

1. The AASHTO No. 10 limestone or air cooled slag aggregate shall be rolled into each layer of the larger limestone or air cooled slag with a 10 ton pneumatic rubber tire vibratory roller.

2. After thoroughly compacting coarse material, spread material uniformly over the surface with spreading equipment, to assure filling voids. In areas inaccessible to equipment spreading with square edge shovel may be allowed. Do not end-dump the material directly on the surface of the coarse material.

3. Begin rolling the sides and progress by rolling parallel with the roadway centerline, uniformly lap each preceding track, cover the entire surface with the rear wheels applying additional fines where necessary to fill voids, and continue rolling until the base course is thoroughly compacted and set.

4. After completion of spreading and rolling of fines, sprinkle with water and the surface of single-layer construction or the surface of each layer of multi-layer construction. Perform diagonal and cross-rolling, as required or directed. Continue the sprinkling and rolling, applying additional fines until voids are frilled. Allow the rolled section to dry before proceeding with the surface course. The owner will determine the quality of fines and water required to produce a smooth and hard monolithic surface.

C. The contractor shall install a final layer of Penn DOT 2A limestone or air cooled slag over the final layer of AASHTO No. 1 two (2) inches in compacted depth. The Penn DOT 2A limestone or air cooled slag shall meet the standards set forth is section 703 of the current edition of the Penn DOT’s publication 408.

D. The contractor shall install a six (6) inches compacted depth limestone or air cooled slag in compacted depth. The Penn DOT 2A limestone or air cooled slag shall meet the standards set forth is section 703 of the current edition of the Penn DOT’s publication 408.

E. The contractor shall install the Penn DOT 2A limestone or air cooled slag aggregate with a 10 ton vibratory roller.

F. No slag will be permitted for this item.

G. The contractor shall prepare the crown of the street during installation of the stone sub-base.

The crown in the centerline of the street shall be at sufficient height to produce a two (2) percent cross slope. The stone needed to produce with this road crown shall be included in this item.

H. The material shall contain enough moisture to prevent segregation during stockpiling, hauling and placing to minimize the need for water during compaction.

I. Deposit the material on the prepared area by means of spreaders, in a manner which will not cause segregation.\

J. Complete subbase prior to paving, at lease 12 inches beyond the outside edge of proposed bituminous pavement or curb.

K. Build up and compact shoulders for full width to or above the elevation of each layer of base course, prior to placing base course, or build and roll shoulders simultaneously with compaction of each layer.

ASPHALT PAVING 321216 - 12

L. If subgrade or subbase materials become mixed with the base course, remove the mixture, reshape and compact the subgrade/subbase, reconstruct the unsatisfactory base course area.

M. On normal crown section, begin rolling on the low side and progress to the high side. Roll parallel with the roadway centerline, uniformly lap each preceding track, cover the entire surface with the rear wheels and continue until the material doesn’t creep of wave ahead of the roller wheels.

N. Install string lines with ample supports, offset along each side to control the elevation and depth of the base course. Maintain string lines until the base course is completed.

3.11 PLACING WARM-MIX ASPHALT

A. Machine place warm-mix asphalt on prepared surface, spread uniformly, and strike off. Place asphalt mix by hand in areas inaccessible to equipment in a manner that prevents segregation of mix. Place each course to required grade, cross section, and thickness when compacted.

1. Place warm-mix asphalt base course in number of lifts 2.5 inches.

2. Place warm-mix asphalt surface course in single lift 1.5 inches.

3. Spread mix at a minimum temperature of 250 deg F.

4. Begin applying mix along centerline of crown for crowned sections and on high side of one-way slopes unless otherwise indicated.

5. Regulate paver machine speed to obtain smooth, continuous surface free of pulls and tears in asphalt-paving mat.

B. Place paving in consecutive strips not less than 10 feet wide unless infill edge strips of a lesser width are required.

1. After first strip has been placed and rolled, place succeeding strips and extend rolling to overlap previous strips. Overlap mix placement about 1 to 1-1/2 inches from strip to strip to ensure proper compaction of mix along longitudinal joints.

2. Complete a section of asphalt base course before placing asphalt surface course.

C. Promptly correct surface irregularities in paving course behind paver. Use suitable hand tools to remove excess material forming high spots. Fill depressions with warm-mix asphalt to prevent segregation of mix; use suitable hand tools to smooth surface.

3.12 WARM MIX ASPHALT PAVING EQUIPMENT

A. Paver: Shall conform to section 401.3 in current edition of Penn DOT’s publication 408 and the following.

1. Self-contained, power propelled units, with activated screeds or strike-off assemblies the produce a finished surface of required evenness and texture must be used. A unit must be provided that doesn’t tear, shove or gouge the mixture.

2. A paver must be capable of being operated at forward speeds consistent with satisfactory laying of the mixture, equipped with receiving hoppers having sufficient capacity for

ASPHALT PAVING 321216 - 13

uniform spreading and with distribution system that place the mixture uniformly in front of the screeds.

3. Hydraulic and other type extensions may be used against abutting lanes or longitudinal joints if the extension are fed and activated be the same method as the mail screed. A non-active extensions may not be used. The width of the screed shall be such as to cover a total width of 24 feet in two passes.

B.

Distributors: Use a distributor designed, equipped, calibrated, maintained, and operated to uniformly apply material on surfaces with varying widths and up to 15 feet wide. Provide a distributor capable of maintaining a uniform distributing pressure and controlling the application rate within a tolerance of 0.02 gallon per square yard. Provide a distributor equipped with a tachometer, pressure gauges, accurate volume-measuring devices or a calibrated tank, a thermometer for measuring temperatures of tank contents, a power-operated pump, and full circulation spray bars with lateral and vertical adjustments. The Contractor may use hand-spraying equipment in areas inaccessible to the distributor.

Determine the distributor’s application rate in the field according to PTM No. 747. Apply emulsified asphalt tack coat, at a rate approved by the Representative, to leave a uniform asphalt residue from 0.02 gallon per square yard to 0.07 gallon per square yard on the treated surface, as directed. Obtain approval of the application rate. Apply the tack coat only when the air temperature is 40F and rising and when the existing surface is dry.

Uniformly distribute the tack coat over the surface and as directed. Uniformly distribute the tack coat at the junction of adjacent applications. Correct all uncoated or lightly coated areas to the Representative’s satisfaction. At designated locations, correct areas with an excess of bituminous material by covering the area with sufficient dry fine aggregate to blot up or remove excess tack coat. Allow the tack coat to cure, without being disturbed, until the Inspector-in-Charge determines the water has completely separated and evaporated.

C.

Bituminous rollers: Provide rollers, of the type(s) specified for the various items of construction, complying with the following: 3.a Three-wheel power rollers, with an unballasted load of not less than 300 pounds per linear inch of tread of rear wheels, having a manufacturer's certified metal weight of not less than 10 tons. 3.b Tandem power-driven rollers, with a ballasted load of not less than 330 pounds per linear inch of tread of drive roll, having a manufacturer's certified metal weight of not less than 10 tons.

3.c Tandem power-driven rollers, with a load of not less than 120 pounds per linear inch of tread of drive roll, having a manufacturer's certified metal weight of either not less than 5 tons or more than 8 tons or either not less than 8 tons or more than 10 tons. 3.d Trench-type rollers that develop a minimum of 300 pounds per inch-width of compaction roll. 3.e Pneumatic-tire rollers, used to compact soils, subbases, and base courses, may be either single or multiple-axle type and may be equipped with pneumatic tires of equal size and diameter on any one axle. Uniformly inflate tires so that air pressure does not vary more than 5 pounds per square inch. Use rollers of sufficient weight and dimensions that, when loaded, will cause the pneumatic tire wheels to exert a ground pressure of not less than 300 pounds per inch of width of tread, as measured on a hard surface. 3.f Pneumatic-tire rollers, used to compact warm bituminous mixtures of a self-propelled type. Use rollers having not less than seven wheels mounting smooth tread pneumatic

ASPHALT PAVING 321216 - 14

tires, not less than 7 1/2 inch by 15 inch size, each tire capable of exerting an average contact pressure through a range from 60 pounds per square inch to 95 pounds per square inch. Use rollers with wheels equally spaced along both axles and so arranged that those on one axle track midway between those of the other, with the wheels on one or both axles arranged to oscillate in pairs or to be individually sprung. Use rollers equipped with power steering and fluid drive or a torque converter, capable of turning or reversing on the warm material without surface scuffing or displacement, and provided with means of wetting and cleaning the tires during operation, to prevent adhesion of warm bituminous mixture to the tires. Make provision for checking tire pressures during operation. Keep the tires uniformly inflated at the designated pressure and with the difference in pressure between any two tires not to exceed 5 pounds per square inch. 108.05(c) 108.06(a) 108-6 Initial Edition In operation, adjust the tire pressure and wheel load, as required, to provide an average contact pressure of from 60 pounds per square inch to 95 pounds per square inch over the surface, to conform to the requirements of both the particular application and the material being compacted. Equip the roller with means of adjusting the wheel load by ballasting and provide tires with a ply-rating that supports the maximum operating wheel load, at the specified maximum contact pressure. Furnish copies of the roller manufacturer's charts or tabulations, showing the contact areas and average contact pressures for the full range of both tire inflation pressures and tire loadings for each type and size of compactor tire furnished. Also, furnish copies of the calibration table or chart for the ballast box, showing both the volume of the box in cubic feet, for at least each 3-inch increment of depth, and the empty or tare weight of the roller. 3.g Tamping rollers with an operating weight of not less than 250 pounds per square inch of cross-sectional area on each tamping foot, face, or end. 3.h Vibratory rollers of a self-propelled type, with the necessary frequency and amplitude to achieve required density without objectionable undulations, material pickup, or other surface defects. Use a vibrator drive that automatically stops when the roller changes direction or stops.

3.13 JOINTS

A. Construct joints to ensure a continuous bond between adjoining paving sections. Construct joints free of depressions, with same texture and smoothness as other sections of warm-mix asphalt course.

1. Clean contact surfaces and apply tack coat to joints.

2. Offset longitudinal joints, in successive courses, a minimum of 6 inches.

3. Offset transverse joints, in successive courses, a minimum of 24 inches.

4. Construct transverse joints at each point where paver ends a day's work and resumes work at a subsequent time. Construct these joints as per section 360.3 Penn DOT’s publication 408.

5. Compact joints as soon as warm-mix asphalt will bear roller weight without excessive displacement.

6. Compact asphalt at joints to a density within 2 percent of specified course density.

B. Install joint sealant in accordance with the following:

1. All edges of the new pavement, including around inlet, manhole and utility box castings shall be sealed with bituminous sealant, PG 64-22 or approved equal.

ASPHALT PAVING 321216 - 15

2. On pavements with bituminous wedge curbs apply PG 64-22 or approved equal applied twelve (12) inches wide, four (4) inched shall be applied to the wedge curb.

3. On pavements with concrete curbs apply PG 64-22 or approved equal applied eight (8) inches wide, two (2) inched shall be applied to the wedge curb.

4. Sanding at driveway and sidewalks.

3.14 COMPACTION

A. General: Begin compaction as soon as placed warm-mix paving will bear roller weight without excessive displacement. Compact warm-mix paving with warm, hand tampers or with vibratory-plate compactors in areas inaccessible to rollers.

1. Complete compaction before mix temperature cools to 185 deg F.

B. Breakdown Rolling: Complete breakdown or initial rolling immediately after rolling joints and outside edge. Examine surface immediately after breakdown rolling for indicated crown, grade, and smoothness. Correct laydown and rolling operations to comply with requirements.

C. Intermediate Rolling: Begin intermediate rolling immediately after breakdown rolling while warm-mix asphalt is still warm enough to achieve specified density. Continue rolling until warm-mix asphalt course has been uniformly compacted to the following density:

1. Average Density: 96 percent of reference laboratory density according to , but not less than 94 percent or greater than 100 percent.

2. Average Density: 92 percent of reference maximum theoretical density according to ASTM D 2041/D 2041M, but not less than 90 percent or greater than 96 percent.

D. Finish Rolling: Finish roll paved surfaces to remove roller marks while warm-mix asphalt is still warm.

E. Edge Shaping: While surface is being compacted and finished, trim edges of pavement to proper alignment. Bevel edges while asphalt is still warm; compact thoroughly.

F. Repairs: Remove paved areas that are defective or contaminated with foreign materials and replace with fresh, warm-mix asphalt. Compact by rolling to specified density and surface smoothness.

G. Protection: After final rolling, do not permit vehicular traffic on pavement until it has cooled and hardened.

H. Erect barricades to protect paving from traffic until mixture has cooled enough not to become marked.

3.15 ASPHALT CURBS

A. Construct warm-mix asphalt curbs over compacted pavement surfaces. Apply a light tack coat unless pavement surface is still tacky and free from dust. Spread mix at a minimum temperature of 250 deg F.

1. Asphalt Mix: Same as pavement surface-course mix.

ASPHALT PAVING 321216 - 16

B. Place warm-mix asphalt to curb cross section indicated to local standard shapes, by machine or by hand in wood or metal forms. Tamp hand-placed materials and screed to smooth finish.

Remove forms after warm-mix asphalt has cooled.

3.16 INSTALLATION TOLERANCES

A. Pavement Thickness: Compact each course to produce the thickness indicated within the following tolerances:

1. Base Course: Plus or minus 2.5 inches compacted depth.

2. Surface Course: Plus or minus 1.5 inches compacted depth.

B. Pavement Surface Smoothness: Compact each course to produce a surface smoothness within the following tolerances as determined by using a 10-foot straightedge applied transversely or longitudinally to paved areas:

3.17 SURFACE TREATMENTS

A. Slurry Seals: Apply slurry coat in a uniform thickness according to ASTM D 3910 and allow to cure.

1. Roll slurry seal to remove ridges and provide a uniform, smooth surface.

B. Seal Coat: At least 2 weeks before the scheduled start work, submit a seal coat design for the representative’s review.

1. Apply bituminous material when the entire surface is in condition to allow satisfactory material penetration and adhesion and when the air, surface, and aggregate temperatures are above 60F or, if using CRS-1PM, from 35F to 55F. Do not apply emulsified asphalt if, in the Representative's opinion, rain is imminent or if the Representative expects freezing temperatures within 24 hours after application. Do not apply RS-2(E-2), CRS- 2(E-3), RS-2PM(E-2M), CRS-2PM(E-3M), or PG 46-40 from September 15 to May 1 in Districts 1-0, 2-0, 3-0, 4-0, 9-0, 10-0, 11-0, 12-0, and 5-0 (Monroe, Carbon, and Schuylkill Counties only); and from October 1 to May 1 in Districts 6-0, 8-0, and 5-0 (Berks, Lehigh, and Northampton Counties only).

2. Spreading and Rolling: Coarse Aggregate. Use dry aggregates, except the Contractor may use damp aggregates with emulsified asphalt. Before spreading aggregate, calibrate the spreader using a method acceptable to the Inspector-in-Charge. Immediately after applying the bituminous material, uniformly spread a single layer of course aggregate at the design rate using a mechanical spreader capable of spreading 15 pounds per square yard to 25 pounds per square yard. Roll the aggregate with pneumatic-tire rollers, as specified in Section 108.05(c)3.f. Provide a sufficient number of rollers to roll the width of stone spread with one pass. Use a contact pressure from 40 pounds per square inch to 50 pounds per square inch.

3. Protection of Surface: Do not allow vehicular traffic or loads on the newly completed surface until the material obtains adequate stability and adhesion and the material is sufficiently cured to prevent distortion, flushing of bituminous material to surface, and loss of aggregate. Provide sufficient flaggers and pilot vehicles to move traffic through

ASPHALT PAVING 321216 - 17

the work zone or over the completed work at speeds that prevent aggregate distortion or pick-up. If required, sweep the surface with a power broom to remove loose aggregate before and after opening the road opened to traffic. Provide a pilot car for sweeping operations after opening the road to traffic

C. Seal Coat: At least 2 weeks before the scheduled start work, submit a seal coat design for the representative’s review.

1. Heating Procedures. Use a premixed, prepackaged material. Heat the material within the safe heating temperature range and recommended pouring temperatures found on the label on the manufacturer's shipping container. Place the material as close as possible to the manufacturer’s recommended pouring temperature. Do not maintain batches of material at the pouring temperature for more than 6 hours. Reheat according to the manufacturer's recommendations.

2. Surface Preparation. Clean, dry, and remove debris and loose material from cracks, joints, and adjacent pavement surfaces. If required, rout cracks to create a reservoir 1/2 inch deep. Clean the pavement for 4 inches to 6 inches on either side of the joint or crack.

Immediately before sealing, use a compressed air stream of at least 100 pounds per square inch measured at the source, or a warm compressed air lance to clean and dry damp cracks in bituminous pavements. If using the warm compressed air lance, do not damage the surrounding pavement area from overheating.

3. Sealing. Seal joints and cracks from 1/4 inch to 1 inch wide with asphalt sealant and filling joints and cracks over 1 inch wide with Bituminous Wearing Course. If using asphalt sealant, fill prepared joints and cracks level with the pavement surface. Wipe the sealant flush with the pavement surface, leaving a thin film of sealant from 1/32 inch to 1/16 inch thick and from 1 inch to 3 inches wide. After wiping the joint or crack, remove and dispose of excess sealant. Unless allowed, do not place sealant when the air temperature is below 40F or above 90F.

3.18 INLET ADJUSMENT

A. The contractor shall adjust each inlet with slope of the road and with a minimum of ¾” of fall from the front on inlet to back of inlet. The contractor may use precast concrete adjusting rings, steel adjusting rings or solid red brick, meeting ASTM Designation M-91, Class SS and mortar.

B. If precast concrete adjusting rings are used, the rings shall be the same size of the inlet box and set in mortar. If bricks are used, the bricks shall be set with mortar and the inside face of the bricks in the inlet shall be completely covered with a minimum of ½” of mortar. If steel adjusting rings are used in lieu of raisin the frame as permitted by engineer/owner, the rings shall be tack welded to the frame at all four corners, with weld being at least 3” long.

C. The contractor shall make all required minor repairs to any inlet as well as covering the inside face of the inlet wall a minimum of ¾” of mortar.

D. The contractor shall install backfill and bedding around the inlet with AASHTO No.57 limestone or aggregate to finished subbase elevation.

ASPHALT PAVING 321216 - 18

E. The contractor shall complete the adjustment of the inlets with fourteen (14) calendar days of the start of the project or the Owner will assess the contractor a penalty of $300 per calendar day for failure to complete the project in accordance with contract documents.

3.19 MANHOLE ADJUSMENT

A. The contractor shall adjust each inlet with slope of the road and with a minimum of ¾” of fall from the front on inlet to back of inlet. The contractor may use precast concrete adjusting rings, steel adjusting rings or solid red brick, meeting ASTM Designation M-91, Class SS and mortar.

B. If precast concrete adjusting rings are used, the rings shall be the same size of the manhole frame and set in mortar. If bricks are used, the bricks shall be set with mortar and the inside face of the bricks in the inlet shall be completely covered with a minimum of 3/4” of mortar. If steel adjusting rings are used, the rings shall be tack welded to the frame at three (3) locations, with weld being at least 3” long.

C. The contractor shall install backfill and bedding around the inlet with AASHTO No.57 limestone or aggregate to finished subbase elevation.

D. The contractor shall complete the adjustment of the inlets with fourteen (14) calendar days of the start of the project or the Owner will assess the contractor a penalty of $300 per calendar day for failure to complete the project in accordance with contract documents.

3.20 FIELD QUALITY CONTROL

A. Testing Agency: a qualified testing agency to perform tests, inspections and prepare test results.

B. Thickness: In-place compacted thickness of warm-mix asphalt courses will be determined according to ASTM D 3549/D 3549M.

C. Surface Smoothness: Finished surface of each warm-mix asphalt course will be tested for compliance with smoothness tolerances.

D. Test for materials:

1. All materials in permanent pavement construction shall be subject to testing and certifications as required by Penn DOT procedures and regulations. All tests shall be performed by the contractor, his suppliers or independent testing laboratories, at no cost to the Owner.

2. Aggregate: Supplier’s certifications, plus one grab sample per 10000 tons to be tested by an independent laboratory.

3. Warm Mix Asphalt Materials- daily plant certifications, plus one grab sample per day for each type of material used for an extraction test by an independent testing laboratory.

E. In-Place Density: Testing agency will take samples of uncompacted paving mixtures and compacted pavement according to .

1. Reference maximum theoretical density will be determined by averaging results from four samples of warm-mix asphalt-paving mixture delivered daily to site, prepared

ASPHALT PAVING 321216 - 19

according to ASTM D 2041/D 2041M, and compacted according to job-mix specifications.

2. In-place density of compacted pavement will be determined by testing core samples according to ASTM D 1188 or ASTM D 2726/D 2726M.

a. One core sample will be taken for every 1000 sq. yd. or less of installed pavement, with no fewer than three cores taken.

b. Field density of in-place compacted pavement may also be determined by nuclear method according to ASTM D 2950 and correlated with ASTM D 1188 or

ASTM D 2726/D 2726M.

F. Replace and compact warm-mix asphalt where core tests were taken.

G. Remove and replace or install additional warm-mix asphalt where test results or measurements indicate that it does not comply with specified requirements.

3.21 TEST FOR SURFACE IRREGULARITIES

A. Use a template cut to required cross section of the finished base course. Equip the template with metal or other vertical extensions attached to each end, so the bottom of the template will be at the elevation of the top of the base course. Test the cross section for surface irregularities at intervals of not more than 25 feet.

B. Use a 10 foot straightedge to test for longitudinal irregularities in the surface of the base course.

Hold the straightedge parallel to the road centerline in the contact with the surface. Move the straightedge from one side of the base course to the other. Advance along the base course in 5 foot increments.

C. Correct all surface irregularities exceeding 1/2inches by loosening the surface and removing or adding material as required.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .