10-012200 FL - Unit Prices PAVING .pdf

PDF 254 KB Posted

Attached to
2026 Maintenance Road Program - Mill and Overlay
Solicitation number
US.210836
Issued by
Washington County, Pennsylvania

View the file

Other files

File Type Posted
15-321716 FL - Manufactured Traffic-Calming Devices 1.pdf PDF
38-000101 FL - Project Title Page.pdf PDF
4-017300 FL - Execution .pdf PDF
27-C-700-Rev-1-General-Conditions-2013 .pdf PDF
3-013233 FL - Photographic Documentation .pdf PDF
6-079200 FL - Joint Sealants .pdf PDF
11-014000 FL - Quality Requirements .pdf PDF
22-C430-Bid-Bond-Penal-Sum-Form-2018 .pdf PDF
7-016000 FL - Product Requirements .pdf PDF
30-Public Works Employment Verification Form.pdf PDF
48-18532 - 2026 Paving Program Plan Set - 01.09.2026.pdf PDF
46-C-3 - Panhandle Lot - Mill and Pave.pdf PDF
29-Cover Page.pdf PDF
20-c-615 payment bond 2013 .pdf PDF
45-C-4 - Hickory Grade - Road Widening.pdf PDF
44-St list and limits VA.pdf PDF
14-C-410-Bid-Form-rev1 VA.pdf PDF
35-012900 FL - Payment Procedures-.pdf PDF
28-SFT - Standard Details - Final.pdf PDF
47-Hickory Grade Road - Line Striping Map.pdf PDF
8-017700 FL - Closeout Procedures .pdf PDF
12-Table of Contents Generated by MasterWorks .pdf PDF
19-C-200-Rev-1-Instructions-to-Bidders (pennbid 2).pdf PDF
2-2026 Bid Documents 12-31-25 VA.pdf PDF
23-c-550 notice to proceed 2013 .pdf PDF
37-010000 FL - General Requirements.pdf PDF
40-013100 FL - Project Management and Coordination.pdf PDF
25-c-940 work change directive 2013 .pdf PDF
18-c-510 (rev 1) notice of award 2013.pdf PDF
32-Non Collusion Affidavit.pdf PDF
31-coi.pdf PDF
34-004393 FL - Bid Submittal Checklist.pdf PDF
21-c-941 change order 2013 .pdf PDF
17-011000 FL - Summary.pdf PDF
43-ADDENDUM NO2 1-8-26 VA.pdf PDF
1-2026 Cape Seal Program.pdf PDF
2-013200 FL - Construction Progress Documentation .pdf PDF
13-329200 FL - Turf and Grasses .pdf PDF
16-321216 FL - Asphalt Paving .pdf PDF
33-001113 FL - Advertisement for Bids.pdf PDF
42-ADDENDUM NO1 1-6-26 VA.pdf PDF
26-c-610 performance bond 2013 .pdf PDF
41-Wages 12-30-25 VA.pdf PDF
36-012500 FL - Substitution Procedures.pdf PDF
24-C-520-Agreement-Stipulated-Price-.pdf PDF
39-012600 FL - Contract Modification Procedures .pdf PDF
1-2026 Road Maintenance Program.pdf PDF
5-013300 FL - Submittal Procedures .pdf PDF
9-015639 FL - Temporary Tree and Plant Protection .pdf PDF
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2026 Road Maintenance Program

UNIT PRICES 012200 - 1

SECTION 012200 - UNIT PRICES

PART 1 - GENERAL

1. RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section.

2. SUMMARY

A. Section includes administrative and procedural requirements for unit prices.

B. Related Requirements:

1. Section 012600 "Contract Modification Procedures" for procedures for submitting and handling Change Orders.

2. Section 014000 "Quality Requirements" for field testing by an independent testing agency.

3. DEFINITIONS

A. Unit price is a price per unit of measurement for materials, equipment, or services, or a portion of the Work, added to or deducted from the Contract Sum by appropriate modification, if the scope of Work or estimated quantities of Work required by the Contract Documents are increased or decreased.

4. PROCEDURES

A. Unit prices include all necessary material, plus cost for delivery, installation, insurance, overhead, and profit.

B. Measurement and Payment: See individual Specification Sections for work that requires establishment of unit prices. Methods of measurement and payment for unit prices are specified in those Sections.

C. Owner reserves the right to reject Contractor's measurement of work-in-place that involves use of established unit prices and to have this work measured, at Owner's expense, by an independent surveyor acceptable to Contractor.

D. List of Unit Prices: A schedule of unit prices is included in Part 3. Specification Sections referenced in the schedule contain requirements for materials described under each unit price.

UNIT PRICES 012200 - 2

PART 2 - EXECUTION

1. SCHEDULE OF UNIT PRICES

UNIT PRICE NO. I- ROTOMILLING AND PROFILING OF ROADWAY - 3 "+/-

1. Under this item, the pavement surface shall be rotomilled to a uniform grade and cross-section, removing a maximum of +/- 3" from the existing surface for the placement of 2 1/2" of 19 mm Superpave 0 to 0.3 million ESALS Bituminous binder or 1" +1- of Fi-ne Graded Superpave 0 to 0.3 million ESALS Bituminous Wearing surface for scratch and 1 1/2" of Fine Graded 9.5 mm Superpave Bituminous 0.3 to 3 Million ESALS Wearing SRL-H or better.

2. All Milling Must Be Completed With A Track Equipped Rotomilling Machine With A Minimum 5' Cutting Head Capable Of Achieving Uniform Profiling Control Of The

CROSS SECTION. THE USE OF A ROTOMILLING MACHINE WITH FIXED

AXLES AND WHEELS WILL NOT BE PERMITTED.

4. The milling shall be a uniform crown cross section so that the milled centerline of the street is a maximum of three (3) inches above the existing gutter grade, but in no event shall milling into the aggregate base be permitted.

5. The Owner will retain 2000-4000 tons of millings to be hauled to the stockpile location. The contractor will be responsible for disposal of the remaining millings properly.

6. The Contractor will be responsible to ensure that the milling equipment, power broom and vacuum truck are in good working order to prevent the creation of any dust. All equipment must apply water to the surface to be milled or cleaned to prevent dust. If the equipment is not capable of applying the water, a water truck must be used to wet the surface sufficiently to control the dust throughout the entire milling and clean-up op-eration. Failure to control the dust will result in the immediate suspension of work and fi-ne for each occurrence in the amount of $500.00 will be imposed against the Contractor.

7. If the milling remains completed more than 10 calendar days ahead of the resurfac-ing, the owner will assess the contractor a $500.00 penalty for each day beyond the 10 days that the milling was completed.

8. If any valve boxes need adjusted, their adjustment will be incidental to this item.

Adjustment of Manholes and Inlets is paid as a separate item.

9. After the streets are milled and prior to them being paved, all surfaces must be swept clean with a vacuum truck and any asphalt, tack, or other bituminous materials must be cleaned.

10. The owner and their agents, representatives, and engineers reserve the right to add and/or delete quantities of work at the unit prices bid at any location within the township whether or not it is on a road included in the bid scope of work. This work

UNIT PRICES 012200 - 3

is to be done at the unit prices bid and no consideration will be given to complete this work on a time and material basis. The contractors bidding this project shall bid appro-priately to complete any additional work or adjust their work when quantities are deleted.

There will not be any price adjustment permitted for quantities of work added or deleted from the project.

11. Payment shall be made for each square yard (S.Y.) of rotomilling, complete in place in-cluding clean-up, removal of any driveway ramps, and disposal of the millings.

UNIT PRICE NO. 2 — BASE REPAIRS ON ASPHALT STREETS

1. Under this item, the pavement and base repairs shall be made by excavating the base and sub-base to a depth of 12" for the placement of Class 4, Type A geotextile fabric, 6" of AASHTO #1 limestone and 6" of 25mm Superpave 0.0 to 0.3 ESAL's bituminous binder course to the level of the existing base course and/or milled surface, also place-ment of 12” of 25mm Superpave 0.0 to 0.3 ESAl’s bituminous binder is allowable but has to be reviewed and approved by the owner.

2. The Owner and their agents, representatives, and engineers reserve the right to add and/or delete quantities of work at the unit prices bid at any location within the thown-ship whether or not it is on a road included in the bid scope of work. This work is to be done at the unit prices bid and no consideration will be given to complete this work on a time and material basis. The contractors bidding this project shall bid appropriately to complete any additional work or adjust their work when quantities are deleted. There will not be any price adjustment permitted for quantities of work added or deleted from the project.

3. Proof roll requires the subgrade/subbase to be proof-rolled (usually with a fully-loaded triaxle dump truck or similar heavy roller) in the presence of the Owner Repre-sentative; any areas that rut, pump, or show loss of support must be undercut and re-placed with suitable material and recompacted before subbase is placed.

4. Payment will be made for each square yard (S.Y.) of base repairs including excavation, disposal of all material removed, 6" of No. 57 limestone and 6" of 25 mm Superpave Binder Course.

UNIT PRICE NO. 3 — 4” and 6” UNDERDRAIN

1. Contractor shall furnish all labor, materials, and equipment necessary to remove and re-place existing 4-inch or 6-inch underdrain piping within the roadway shoulder or curb line as part of the milling and resurfacing project. Work includes excavation, installation of new underdrain pipe, stone backfill, geotextile wrap, and connection to existing drainage structures or outlets.

2. Pipe: 4" or 6" perforated HDPE underdrain pipe meeting AASHTO M252 or M294 standards.

Stone Backfill: Clean, washed No. 57 aggregate.

Geotextile Fabric: Non-woven geotextile meeting AASHTO M288 for drainage applica-tion.

Fittings & Couplings: Manufacturer-approved connectors, tees, and end caps.

UNIT PRICES 012200 - 4

3. The Owner and their agents, representatives, and engineers reserve the right to add and/or delete quantities of work at the unit prices bid at any location within the town-ship whether it is on a road included in the bid scope of work. This work is to be done at the unit prices bid and no consideration will be given to complete this work on a time and material basis. The contractors bidding this project shall bid appropriately to com-plete any additional work or adjust their work when quantities are deleted. There will not be any price adjustment permitted for quantities of work added or deleted from the project.

4. Payment will be made for each linear foot (L.F) of base repairs including excavation and disposal of all material removed.

UNIT PRICE NO. 4 – INLETS AND MANHOLES ADJUSTMENTS

1. Under this item the contractor shall complete adjusting of existing inlet and manhole castings to the proposed roadway elevations according to Division 2 Section "Hot Mix Asphalt Paving". Included in this item shall be all bricks or risers used to bring the top of the frame to grade, all mortar or concrete used to parge the structure and removal and disposal of excess materials, complete in place.

2. The owner and their agents, representatives, and engineers reserve the right to add and/or delete quantities of work at the unit prices bid at any location within the town-ship whether or not it is on a road included in the bid scope of work. This work is to be done at the unit prices bid and no consideration will be given to complete this work on a time and material basis. The contractors bidding this project shall bid appropriately to complete any additional work or adjust their work when quantities are deleted. There will not be any price adjustment permitted for quantities of work added or deleted from the project.

3. Payment will be made for each (EA) Inlet/Manhole adjustment, complete in place.

4. Under this item the contractor shall complete adjusting of existing inlet and manhole castings to the proposed roadway elevations according to Division 2 Section "Hot Mix Asphalt Paving". Included in this item shall be all bricks or risers used to bring the top of the frame to grade, all mortar or concrete used to parge the structure and removal and disposal of excess materials, complete in place.

5. The Township of South Fayette and their agents, representatives, and engineers reserve the right to add and/or delete quantities of work at the unit prices bid at any location within the Township whether or not it is on a road included in the bid scope of work. This work is to be done at the unit prices bid and no consideration will be given to complete this work on a time and material basis. The contractors bidding this project shall bid ap-propriately to complete any additional work or adjust their work when quantities are de-leted. There will not be any price adjustment permitted for quantities of work added or deleted from the project.

6. Payment will be made for each (EA) Inlet/Manhole adjustment, complete in place.

UNIT PRICE NO. 5 — LINE STRIPING

UNIT PRICES 012200 - 5

1. Description: under this item the contractor will be required to furnish installation of the paint. Paint shall be fast-drying, waterborne traffic marking paint, meeting Federal Specification TT-P-1952F or ASTM D713.

2. Color:

• White for standard stall lines, arrows, and legends

• Yellow for accessible access aisles and designated areas

• Blue for ADA parking background fields

• Paint shall be suitable for asphalt and designed for outdoor, high-wear applications.

3. Surface Preparation

• All pavement surfaces must be clean, dry, and free of dust, oil, debris, and loose particles.

• Use mechanical blowers or brooms as needed.

• Newly paved surfaces shall be allowed to cool and cure as required by the paint manufacturer (typically 24 hours).

4. Layout Requirements

• Contractor shall field-measure and re-establish all striping based on existing conditions unless revised by Owner.

• All dimensions shall meet applicable standards:

• Stall width: 9 ft typical

• Stall length: 18 ft typical

• ADA stalls: per ADA Standards for Accessible Design

• Access aisles: minimum 5 ft (standard) or 8 ft (van-accessible)

5. Layout paint or chalk shall be used for alignment prior to final striping.

Application Requirements

• Apply paint using airless striping equipment capable of producing uniform, clean edges.

• Minimum wet film thickness: 15 mils (or per manufacturer requirements).

• Line width:

• 4" typical stalls

• 6" for ADA access aisles

• 8"–12" for stop bars

• Arrows, legends, and symbols shall follow MUTCD and ADA standards.

• Two coats shall be applied to all markings unless otherwise approved.

6. Payment will be made on a lump sum (L.F) complete in place.

UNIT PRICE NO. 6 — 6" X 18" BITUMINOUS WEDGE CURB

1. Under this item a new 6" x 18" +/- Bituminous Wedge Curb shall be constructed of 19 mm Superpave Bituminous Binder and 9.5 mm Superpave Fine Graded Wearing Course

0.0 to 0.3 ESAL's PG-64S-28, SRL-G or better, Coarse Graded.

2. Contractor must submit a PennDOT approved Job Mix Formula (JMF) from 2025 for the

3. Proposed asphalt mix. During the completion of the respective items on the roadways.

All materials used will be paid for through their respective items.

4. The owner and their agents, representatives, and engineers reserve the

UNIT PRICES 012200 - 6

right to add and/or delete quantities of work at the unit prices bid at any location within the township whether or not it is on a road included in the bid scope of work. This work is to be done at the unit prices bid and no consideration will be given to complete this work on a time and material basis. The contractors bidding this project shall bid appro-priately to complete any additional work or adjust their work when quantities are deleted.

There will not be any price adjustment permitted for quantities of work added or deleted from the project.

5. Payment shall be made on a linear foot (L.F.) basis, complete in place, for the labor to install the curb.

UNIT PRICE NO. 7 - 2 1/2" OF 19 MM SUPERPAVE BITUMINOUS BINDER, 0 TO 0.3

MILLION ESAL'S

1. The above item shall meet the PennDOT specifications for 0 to 0.3 ESAL's. Re-claimed Asphalt Pavement (RAP) shall not exceed fifteen percent (15%) for any asphalt course. PG-64S-28, 0 to 0.3 million ESAL’s Coarse Graded.

2. The bituminous binder shall be 2 1/2" of compacted Superpave 19 mm Bituminous Binder Course placed after the milling has been completed.

3. The binder must be placed within 10 calendar days after the milling or the Contractor will be charged $500.00 per day damages. The air and surface temperature for the placement of the Superpave 19 mm Bituminous Binder Course must be 40° and rising. No ex-ceptions will be made.

4. Prior to the placement of the Superpave 19 mm Bituminous Binder Course, the roadway shall be swept and tack coated with Asphalt Emulsion Tack (AET).

5. The Contractor must also have his proposed bituminous surface course mixes approved by PennDOT, prior to starting the work.

6. Prior to the placement of any of the above asphalt materials, job mix formula reports shall be submitted to the Engineer or his representative and asphalt cement bill of lading tickets shall be required daily during placement.

7. The Contractor is responsible to insure that the proper material is being provided by supplying a copy of an approved PennDOT Bituminous Asphalt Mix Design a minimum of 5 working days prior to the start of the work or at the pre-construction meeting. The contractor will also supply the municipality with a Daily Bituminous Material Certification on a TR-465 or CS-4171 within 24 hours of placing the bituminous material for each day's placement.

8. All materials shipped to the job site must have a corresponding weight slip with the type of material that has been shipped and the approved Job Mix Formula (JMF). Any material delivered to the site with a weight slip with incorrect information will result in the material being rejected and being removed from the site immediately. There will not be any compensation for incorrect material being brought to the site that is rejected.

UNIT PRICES 012200 - 7

1. During the placement of the material, compaction density testing shall be completed by the Contractor in accordance with PennDOT specifications and the results submitted to the Inspector on a daily basis. All compaction tests must be completed by a NECEPT certified technician. Proof of established rolling patters for compaction of the materials must be provided.

2. The township and their agents, representatives, and engineers reserve the right to add and/or delete quantities of work at the unit prices bid at any location within the Township whether or not it is on a road included in the bid scope of work. This work is to be done at the unit prices bid and no consideration will be given to complete this work on a time and material basis. The contractors bidding this project shall bid appropriately to complete any additional work or adjust their work when quantities are deleted. There will not be any price adjustment permitted for quantities of work added or deleted from the project.

3. Payment will be made for each ton (TN) of Superpave 19 mm Superpave Bituminous Binder Course installed, complete in place, including the tack coat.

UNIT PRICE NO. 8 - 1" +/- OF 9.5 MM SUPERPAVE SCRATCH WEARING, 0 TO 03

MILLION ESAL'S

1. The above item shall meet the PennDOT specifications for 0 to 0.3 ESAL's. PG- 64S-28, 0 to 0.3 million ESAL’s SRL-G or better, Coarse Graded.

2. The bituminous scratch wearing shall be 1" +/- of compacted Superpave 9.5 mm Bituminous Wearing Course placed after the milling has been completed. Reclaimed Asphalt Pavement (RAP) shall not exceed fifteen percent (15%) for any asphalt course

3. The scratch must be placed within 7 calendar days after the milling or the Contractor will be charged $500.00 per day damages. The air and surface temperature for the placement of the Superpave 9.5 mm Bituminous Scratch Wearing Course must be 40° and rising.

No exceptions will be made.

4. Prior to the placement of the Superpave 9 5 mm Bituminous Scratch Wearing Course, the roadway shall be swept and tack coated with Asphalt Emulsion Tack (AET).

5. The Contractor must also have his proposed bituminous surface course mixes approved by PennDOT, prior to starting the work.

6. The Contractor is responsible to insure that the proper material is being provided by sup-plying a copy of an approved PennDOT Bituminous Asphalt Mix Design a minimum of 5 working days prior to the start of the work or at the pre-construction meeting. The con-tractor will also supply the municipality with a Daily Bituminous Material Certifi-cation on a TR-465 or CS-4171 within 24 hours of placing the bituminous material for each day's placement.

6. All materials shipped to the job site must have a corresponding weight slip with the type of

UNIT PRICES 012200 - 8

material that has been shipped and the approved Job Mix Formula (JMF). Any mate-rial delivered to the site with a weight slip with incorrect information will result in the material being rejected and being removed from the site immediately. There will not be any compensation for incorrect material being brought to the site that is rejected.

8. During the placement of the material, compaction density testing shall be completed by the Contractor in accordance with PennDOT specifications and the results submitted to the Inspector on a daily basis. All compaction tests must be completed by a NECEPT certified technician. Proof of established rolling patters for compaction of the materials must be provided.

9. The Township of South Fayette and their agents, representatives, and engineers reserve the right to add and/or delete quantities of work at the unit prices bid at any location within the Township whether or not it is on a road included in the bid scope of work. This work is to be done at the unit prices bid and no consideration will be given to complete this work on a time and material basis. The contractors bidding this project shall bid ap-propriately to complete any additional work or adjust their work when quantities are de-leted. There will not be any price adjustment permitted for quantities of work added or deleted from the project.

10. Payment will be made for each ton (TN) of Superpave 9.5 mm Superpave Bituminous Scratch Wearing Course installed, complete in place, including the tack coat.

UNIT PRICE NO. 9 — 1-1/2" OF 9.5 MM SUPERPAVE FINE GRADED WEARING

COURSE, PG 64S-28, 0 TO 0.3 MILLION ESAL'S SRL "E"

1. All of the above item shall meet the PennDOT specifications for 0 to 0.3 ESAL's. All aggregates used for the bituminous asphalt must have SRL designation of E or better. The bi-tuminous wearing surface shall consist of 11/2" compacted 9.5mm Fine Graded Su-perpave bituminous wearing surface. Reclaimed Asphalt Pavement (RAP) shall not exceed fifteen percent (15%) for any asphalt course. The air and surface tempera-ture for the placement of the 9.5mm Superpave bituminous wearing surface must be 40° and rising. No exceptions will be made.

2. Reinforcing Fibers: High tensile strength aramid fiber blend specially formulated to re-inforce hot mix asphalt.

3. Fiber-reinforced asphalt concrete (FRAC): A mixture of hot or warm mix asphalt and re-inforcing fibers.

4. ASTM D2172, Standard Test Methods for Quantitative Extraction of Bitumen from Bi-tuminous Paving Mixtures

5. “Extraction of Aramid Fibers from Fiber Reinforced Asphalt Concrete – Special Test Method”

6.

Add Reinforcing Fibers at a dosage rate of 1 pound per ton of asphalt. Ton equivalents or dosage rates below 1 pound per ton will not be accepted. Dosage rates greater than 1

UNIT PRICES 012200 - 9

pound per ton may be used according to the manufacturer’s and/or engineer’s recommen-dations.

Have a fiber manufacturer’s representative on-site during mixing and production. The requirement can be waived if the fiber manufacturer and asphalt producer can supply evi-dence of the manufacturer’s brand of fiber being successfully produced a minimum of three times at the asphalt plant.

Daily fiber feeding logs shall be maintained by the producer and supplied to the engineer upon their request. At a minimum, logs shall consist of the date, run time, and weight of fiber dispensed. The engineer shall have access to extract the raw electronic files when requested.

Batch Plant. When a batch plant is used, add fiber to the aggregate in the weigh hopper and increase both dry and wet mixing times. Ensure that the fiber is uniformly distribut-ed before the injection of asphalt into the mixture.

7. The 9.5 mm Superpave bituminous wearing surface must be placed within 7 calendar Days of the completion of the milling or the Contractor will be charged $500.00 per day per street liquidated damages. The air and surface temperature for the placement of 9.5 mm Superpave bituminous wearing surface must be 40° and rising. No exceptions will be made.

The Contractor is responsible to insure that the proper material is being provided by supplying a copy of an approved PennDOT Bituminous Asphalt Mix Design a minimum of 5 working days prior to the start of the work or at the pre-construction meeting. The Con-tractor will also supply the owner with a Daily Bituminous Material Certification on a TR-465 or CS-4171 within 24 hours of placing the bituminous material for each day's placement.

All materials shipped to the job site must have a corresponding weight slip with the type of material that has been shipped and the approved Job Mix Formula (JMF). Any ma-terial delivered to the site with a weight ship with incorrect information will result in the material being rejected and being removed from the site immediately. There will not be any compensation for incorrect material being brought to the site that is rejected.

8.

Prior to the placement of the Superpave 9.5 mm bituminous wearing course, the roadway shall be swept and tack coated with Asphalt Emulsion Tack (AET) if necessary.

9.

During the placement of the material, compaction density testing shall be completed by the Contractor in accordance with PennDOT specifications and the results submitted to the Inspector on a daily basis. All compaction tests must be completed by a NECEPT cer-tified technician. Proof of established rolling patters for compaction of the materials must be provided.

10.

The owner and their agents, representatives, and engineers reserve the right to add and/or delete quantities of work at the unit prices bid at any location within the Township whether or not it is on a road included in the bid scope of work. This work is to be done at the unit prices bid and no consideration will be given to complete this work

UNIT PRICES 012200 - 10

on a time and material basis. The contractors bidding this project shall bid appropriately to complete any additional work or adjust their work when quantities are deleted. There will not be any price adjustment permitted for quantities of work added or deleted from the project.

11.

Payment for the 1-1/2" of Compacted Superpave Fine Graded 9.5 mm Wearing Course will be made on a square yard (S.Y.) basis, complete in place including overlaying the ex-isting curb, and sealing next to the curbs when installed with a 8" pass of PG 64-22.

When sealing past driveways, the gutter line must be sanded to prevent tracking of the

PG 64-22.

UNIT PRICE NO. 10— 1.5” Wearing 4" OF 25 MM SUPERPAVE BITUMINOUS

BINDER, 0.3 TO 3 MILLION ESAL'S (PARK PARKING LOTS) 1-1/2" OF 9.5 MM

SUPERPAVE FINE GRADED WEARING COURSE, PG 64S-28, 0 TO 0.3 MILLION

ESAL'S SRL "E"

1. The above item shall meet the PennDOT specifications for 0.3 to 3 ESAL's. Re-claimed Asphalt Pavement (RAP) shall not exceed fifteen percent (15%) for any as-phalt course. PG-64S-28, 0 to 0.3 million ESAL’s Coarse Graded.

2. The bituminous binder shall be 4" of compacted Superpave 25 mm Bituminous Binder Course placed after the milling has been completed. Reclaimed Asphalt Pavement (RAP) shall not exceed fifteen percent (15%) for any asphalt course

3. The Contractor must also have his proposed bituminous surface course mixes approved by PennDOT, prior to starting the work.

Prior to the placement of any of the above asphalt materials, job mix formula reports shall be submitted to the Engineer or his representative and asphalt cement bill of lading tickets shall be required daily during placement.

4.

The Contractor is responsible to ensure that the proper material is being provided by supplying a copy of an approved PennDOT Bituminous Asphalt Mix Design a minimum of 5 working days prior to the start of the work or at the pre-construction meeting. The contractor will also supply the municipality with a Daily Bituminous Material Certification on a TR-465 or CS-4171 within 24 hours of placing the bituminous material for each day's placement.

5.

All materials shipped to the job site must have a corresponding weight slip with the type of material that has been shipped and the approved Job Mix Formula (JMF). Any material delivered to the site with a weight slip with incorrect information will result in the material being rejected and removed from the site immediately. There will not be any compensation for incorrect material being brought to the site that is rejected.

6. During the placement of the material, compaction density testing shall be completed by the Contractor in accordance with PennDOT specifications and the results submitted to the Inspector on a daily basis. All compaction tests must be completed by a NECEPT

UNIT PRICES 012200 - 11

certified technician. Proof of established rolling patterns for compaction of the materials must be provided.

7. The owner and their agents, representatives, and engineers reserve the right to add and/or delete quantities of work at the unit prices bid at any location within the township whether or not it is on a road included in the bid scope of work. This work is to be done at the unit prices bid and no consideration will be given to complete this work on a time and material basis. The contractors bidding on this project shall bid appropriately to complete any additional work or adjust their work when quantities are deleted. There will not be any price adjustment permitted for quantities of work added or deleted from the project.

8. Payment will be made for square yard (SY) of Superpave 9.5mm wearing and 25 mm Superpave Bituminous Binder Course installed, complete in place.

UNIT PRICE NO. 11: TRAFFIC CONTROL, NOTIFICATION AND RESTORATION.

Description: Under this item the contractor will be required to establish and maintain all detour signs and markers guiding motorists in accordance with PennDOT Publication 203. Failure to comply with the required maintenance of traffic will result on the project operation being immediately suspended. Since traffic control in under the auspices of the Commonwealth of Pennsylvania Motor Vehicle Code, the Township Police Department has the right to issue a citation for failure to comply with the traffic controls.

B. The contractor must prepare and submit to the Twp. Police Chief a traffic control for the project. The traffic control plan must be reviewed and approved by the Police Chief prior to being set up.

C. This item includes providing the necessary flaggers as required for all operations to be completed.

D. The Contractor shall be required to submit his work schedule to the Township for review prior to the start of construction. The Township of South Fayette reserves the right to make modifications for the schedule as necessary.

E. The contractor shall give all property owners written notification 48 hours notice prior to the start of any work and post signs on the streets. The written notification shall be submitted to the Township for review prior to distribution. The notification shall tell the residents that their vehicles must be removed from the roadway by 7:00 AM of the day of the work to be completed. Failure to post the streets will not permit to towing of the vehicles to be enforced by the Police Department.

F. Exposed manholes, storm inlets and utility castings, driveway approached shall be protected from traffic by flashing light barricades and 19mm Superpave binder until the paving is completed. There will be no any additional compensation for the necessary 19 mm Superpave Binder placed around the castings to protect them from traffic.

G. All streets must be cleaned of debris, sealed and restored within 7 calendar days after the placing of The Superpave Bituminous wearing surface or the contractor will be charged $500 per day per street liquidated damages.

UNIT PRICES 012200 - 12

H. Under this item the contractor shall backfill all disturbed area with topsoil seed and mulch with a mushroom manure when necessary, all topsoil must be shredded in screened. All curbs Shall be restored within 7 calendar days after the wearing surface is placed.

I. Under this item the contractor will be required to review the location of any trees or shrubs that will interfere with operation and trim or remove the obstacle after notifying the property owner in writing, any damage trees or should I bury must be replaced at the contractor's expense, that will not be additional compensation to meet this requirement.

J. Payment will be made on the lump sum basis, complete in place, including the traffic control, establishment of the detour for the duration of the project, notification of residents, sealing and backfill of the curbs where required.

K. Unit of Measurement: Lump Sum (LS)

BASIS OF PAYMENT

This contract is a combination unit price and lump sum contract and only the items listed and bid are pay items. The owner reserves the right to add or delete quantities to the contract at the unit prices.

L. The bidder is advised that the Township will award this contract to the lowest responsible bidder based on the total bid submitted for all streets listed. However, the bidder is advised that the Township expressly reserves the right to reject all bids, and specifically reserve the right to award to the lowest responsible bidder a contract for all or any portions of the street listed in the proposal, and in awarding a contract for less than the total streets listed, or less than all portions of the streets listed, the contract price will be determined from the total quantities for each item listed in the unit price bid for each item listed.

M. Estimates for work completed will be prepared on a monthly basis per job. The estimates shall provide for payment in the amount of 90% of the work completed to date. Upon satisfactory completion of 50% of the contract value of each job, the payments will be increased to 95% of the work completed to date.

WARRANTY

N. The contractor shall furnish a Surety Company Bond stating that all work executed under this contract will be free from workmanship defect for a period of two (2) years from the date of Final Acceptance of this work. Said bond shall be equal to hundred (100%) percent of the amount of the Final Contract Value.

The contractor further agrees that he will at his own expense, replace all such defective work and all other damages thereby, which become defective during the term of the Guaranty- Warranty.

ALTERNATE NO 1 : GUIDERAILS REPLACEMENT.

UNIT PRICES 012200 - 13

As specified om the contract documents. Description: Under this item the contractor will be required to replace and install guiderail W-BEAM (Type 31-S). Excavation and rock , class R-3 for trailing end type 31-S guide rail to be included with the type 31-S guide rail pay item. Details can be found at PennDOT 72M manual (SHT 2 RC-50M)

O. Unit of Measurement: Lump Sum (L.F.)

END OF SECTION 012200

PART 1 - GENERAL
1. RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section.
2. SUMMARY
A. Section includes administrative and procedural requirements for unit prices.
B. Related Requirements:
1. Section 012600 "Contract Modification Procedures" for procedures for submitting and handling Change Orders.
2. Section 014000 "Quality Requirements" for field testing by an independent testing agency.
3. DEFINITIONS
A. Unit price is a price per unit of measurement for materials, equipment, or services, or a portion of the Work, added to or deducted from the Contract Sum by appropriate modification, if the scope of Work or estimated quantities of Work required by ...
4. PROCEDURES
A. Unit prices include all necessary material, plus cost for delivery, installation, insurance, overhead, and profit.
B. Measurement and Payment: See individual Specification Sections for work that requires establishment of unit prices. Methods of measurement and payment for unit prices are specified in those Sections.
C. Owner reserves the right to reject Contractor's measurement of work-in-place that involves use of established unit prices and to have this work measured, at Owner's expense, by an independent surveyor acceptable to Contractor.
D. List of Unit Prices: A schedule of unit prices is included in Part 3. Specification Sections referenced in the schedule contain requirements for materials described under each unit price.
PART 2 - EXECUTION
1. SCHEDULE OF UNIT PRICES
UNIT PRICE NO. I- ROTOMILLING AND PROFILING OF ROADWAY - 3 "+/-
1. Description: under this item the contractor will be required to furnish installation of the paint. Paint shall be fast-drying, waterborne traffic marking paint, meeting Federal Specification TT-P-1952F or ASTM D713.
2. Color:
White for standard stall lines, arrows, and legends
Yellow for accessible access aisles and designated areas
Blue for ADA parking background fields
Paint shall be suitable for asphalt and designed for outdoor, high-wear applications.
3. Surface Preparation
All pavement surfaces must be clean, dry, and free of dust, oil, debris, and loose particles.
Use mechanical blowers or brooms as needed.
Newly paved surfaces shall be allowed to cool and cure as required by the paint manufacturer (typically 24 hours).
4. Layout Requirements
Contractor shall field-measure and re-establish all striping based on existing conditions unless revised by Owner.
All dimensions shall meet applicable standards:
Stall width: 9 ft typical
Stall length: 18 ft typical
ADA stalls: per ADA Standards for Accessible Design
Access aisles: minimum 5 ft (standard) or 8 ft (van-accessible)
5. Layout paint or chalk shall be used for alignment prior to final striping.
Application Requirements
Apply paint using airless striping equipment capable of producing uniform, clean edges.
Minimum wet film thickness: 15 mils (or per manufacturer requirements).
Line width:
4" typical stalls
6" for ADA access aisles
8"–12" for stop bars
Arrows, legends, and symbols shall follow MUTCD and ADA standards.
Two coats shall be applied to all markings unless otherwise approved.
6. Payment will be made on a lump sum (L.F) complete in place.
1. During the placement of the material, compaction density testing shall be completed by the Contractor in accordance with PennDOT specifications and the results submitted to the Inspector on a daily basis. All compaction tests must be complete...
2. The township and their agents, representatives, and engineers reserve the right to add and/or delete quantities of work at the unit prices bid at any location within the Township whether or not it is on a road included in the bid scope of work. Th...
3. Payment will be made for each ton (TN) of Superpave 19 mm Superpave Bituminous Binder Course installed, complete in place, including the tack coat.
UNIT PRICE NO. 11: TRAFFIC CONTROL, NOTIFICATION AND RESTORATION.
Description: Under this item the contractor will be required to establish and maintain all detour signs and markers guiding motorists in accordance with PennDOT Publication 203. Failure to comply with the required maintenance of traffic will result on...
B. The contractor must prepare and submit to the Twp. Police Chief a traffic control for the project. The traffic control plan must be reviewed and approved by the Police Chief prior to being set up.
C. This item includes providing the necessary flaggers as required for all operations to be completed.
D. The Contractor shall be required to submit his work schedule to the Township for review prior to the start of construction. The Township of South Fayette reserves the right to make modifications for the schedule as necessary.
E. The contractor shall give all property owners written notification 48 hours notice prior to the start of any work and post signs on the streets. The written notification shall be submitted to the Township for review prior to distribution. The notif...
F. Exposed manholes, storm inlets and utility castings, driveway approached shall be protected from traffic by flashing light barricades and 19mm Superpave binder until the paving is completed. There will be no any additional compensation for the nece...
G. All streets must be cleaned of debris, sealed and restored within 7 calendar days after the placing of The Superpave Bituminous wearing surface or the contractor will be charged $500 per day per street liquidated damages.
H. Under this item the contractor shall backfill all disturbed area with topsoil seed and mulch with a mushroom manure when necessary, all topsoil must be shredded in screened. All curbs Shall be restored within 7 calendar days after the wearing surfa...
I. Under this item the contractor will be required to review the location of any trees or shrubs that will interfere with operation and trim or remove the obstacle after notifying the property owner in writing, any damage trees or should I bury must b...
J. Payment will be made on the lump sum basis, complete in place, including the traffic control, establishment of the detour for the duration of the project, notification of residents, sealing and backfill of the curbs where required.
K. Unit of Measurement: Lump Sum (LS)
BASIS OF PAYMENT
This contract is a combination unit price and lump sum contract and only the items listed and bid are pay items. The owner reserves the right to add or delete quantities to the contract at the unit prices.
L. The bidder is advised that the Township will award this contract to the lowest responsible bidder based on the total bid submitted for all streets listed. However, the bidder is advised that the Township expressly reserves the right to reject all b...
M. Estimates for work completed will be prepared on a monthly basis per job. The estimates shall provide for payment in the amount of 90% of the work completed to date. Upon satisfactory completion of 50% of the contract value of each job, the payment...
WARRANTY
N. The contractor shall furnish a Surety Company Bond stating that all work executed under this contract will be free from workmanship defect for a period of two (2) years from the date of Final Acceptance of this work. Said bond shall be equal to hu...
The contractor further agrees that he will at his own expense, replace all such defective work and all other damages thereby, which become defective during the term of the Guaranty-Warranty.
ALTERNATE NO 1 : GUIDERAILS REPLACEMENT.
As specified om the contract documents. Description: Under this item the contractor will be required to replace and install guiderail W-BEAM (Type 31-S). Excavation and rock , class R-3 for trailing end type 31-S guide rail to be included with the typ...
O. Unit of Measurement: Lump Sum (L.F.)

File details come from the government source that posted it. Updated .