15-321716 FL - Manufactured Traffic-Calming Devices 1.pdf

PDF 83 KB Posted

Attached to
2026 Maintenance Road Program - Mill and Overlay
Solicitation number
US.210836
Issued by
Washington County, Pennsylvania

View the file

Other files

File Type Posted
38-000101 FL - Project Title Page.pdf PDF
4-017300 FL - Execution .pdf PDF
27-C-700-Rev-1-General-Conditions-2013 .pdf PDF
3-013233 FL - Photographic Documentation .pdf PDF
6-079200 FL - Joint Sealants .pdf PDF
11-014000 FL - Quality Requirements .pdf PDF
22-C430-Bid-Bond-Penal-Sum-Form-2018 .pdf PDF
7-016000 FL - Product Requirements .pdf PDF
30-Public Works Employment Verification Form.pdf PDF
48-18532 - 2026 Paving Program Plan Set - 01.09.2026.pdf PDF
46-C-3 - Panhandle Lot - Mill and Pave.pdf PDF
29-Cover Page.pdf PDF
20-c-615 payment bond 2013 .pdf PDF
45-C-4 - Hickory Grade - Road Widening.pdf PDF
44-St list and limits VA.pdf PDF
14-C-410-Bid-Form-rev1 VA.pdf PDF
35-012900 FL - Payment Procedures-.pdf PDF
28-SFT - Standard Details - Final.pdf PDF
47-Hickory Grade Road - Line Striping Map.pdf PDF
8-017700 FL - Closeout Procedures .pdf PDF
12-Table of Contents Generated by MasterWorks .pdf PDF
19-C-200-Rev-1-Instructions-to-Bidders (pennbid 2).pdf PDF
2-2026 Bid Documents 12-31-25 VA.pdf PDF
23-c-550 notice to proceed 2013 .pdf PDF
37-010000 FL - General Requirements.pdf PDF
40-013100 FL - Project Management and Coordination.pdf PDF
25-c-940 work change directive 2013 .pdf PDF
18-c-510 (rev 1) notice of award 2013.pdf PDF
32-Non Collusion Affidavit.pdf PDF
31-coi.pdf PDF
34-004393 FL - Bid Submittal Checklist.pdf PDF
21-c-941 change order 2013 .pdf PDF
17-011000 FL - Summary.pdf PDF
43-ADDENDUM NO2 1-8-26 VA.pdf PDF
1-2026 Cape Seal Program.pdf PDF
2-013200 FL - Construction Progress Documentation .pdf PDF
13-329200 FL - Turf and Grasses .pdf PDF
16-321216 FL - Asphalt Paving .pdf PDF
33-001113 FL - Advertisement for Bids.pdf PDF
42-ADDENDUM NO1 1-6-26 VA.pdf PDF
26-c-610 performance bond 2013 .pdf PDF
41-Wages 12-30-25 VA.pdf PDF
36-012500 FL - Substitution Procedures.pdf PDF
24-C-520-Agreement-Stipulated-Price-.pdf PDF
10-012200 FL - Unit Prices PAVING .pdf PDF
39-012600 FL - Contract Modification Procedures .pdf PDF
1-2026 Road Maintenance Program.pdf PDF
5-013300 FL - Submittal Procedures .pdf PDF
9-015639 FL - Temporary Tree and Plant Protection .pdf PDF
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2026 Road Maintenance Program

MANUFACTURED TRAFFIC-CALMING DEVICES 321716 - 1

SECTION 321716 - MANUFACTURED TRAFFIC-CALMING DEVICES

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section includes manufactured traffic-calming devices.

B. Detour Plan.

C. Notification Requirements.

1.3 DEFINITIONS

A. Penn DOT: Pennsylvania Department of Transportation.

PART 2 - PRODUCTS

2.1 MANUFACTURED TRAFFIC-CALMING DEVICES

A. All traffic control signs and warning devises shall meet specifications set forth in the current edition of Penn DOT’s publication 203 and 408.

PART 3 - EXECUTION

3.1 SIGNS AND TRAFFIC CONTROL DEVICES

A. The contractor shall install all required signs and traffic control devices to maintain proper traffic control. All signs and devices shall be installed in accordance with the current edition of Penn DOT’s publication 203 for road closure or single lane closure.

B. The contractor shall install all traffic control signs a minimum of one (1) week prior to starting construction.

2026 Road Maintenance Program

MANUFACTURED TRAFFIC-CALMING DEVICES 321716 - 2

C. The contractor shall maintain all traffic control signs and devices during the life of the project.

D. The contractor shall remove all traffic control signs and devises a maximum of two (2) weeks after final acceptance of the project.

E. Proceed with installation only after unsatisfactory conditions have been corrected.

3.2 DETOUR PLAN

A. The contractor shall prepare and submit a detour plan for road closure to the Engineer/Owner for review and approval.

B. The contractor shall install all of the required signs and devices in accordance with the Traffic Control Plan included in the contract documents.

C. The contractor shall make arrangements ahead of time with local school district and Port Authority whenever their buses will be inconvenienced during the life of the project.

3.3 INSTALLATION

A. Install manufactured traffic-calming devices according to manufacturer's written instructions unless otherwise indicated.

END OF SECTION 321716

PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section includes manufactured traffic-calming devices.
B. Detour Plan.
C. Notification Requirements.
1.3 DEFINITIONS
A. Penn DOT: Pennsylvania Department of Transportation.
PART 2 - PRODUCTS
2.1 MANUFACTURED TRAFFIC-CALMING DEVICES
A. All traffic control signs and warning devises shall meet specifications set forth in the current edition of Penn DOT’s publication 203 and 408.
PART 3 - EXECUTION
3.1 SIGNS AND TRAFFIC CONTROL DEVICES
A. The contractor shall install all required signs and traffic control devices to maintain proper traffic control. All signs and devices shall be installed in accordance with the current edition of Penn DOT’s publication 203 for road closure or single...
B. The contractor shall install all traffic control signs a minimum of one (1) week prior to starting construction.
C. The contractor shall maintain all traffic control signs and devices during the life of the project.
D. The contractor shall remove all traffic control signs and devises a maximum of two (2) weeks after final acceptance of the project.
E. Proceed with installation only after unsatisfactory conditions have been corrected.
3.2 DETOUR PLAN
A. The contractor shall prepare and submit a detour plan for road closure to the Engineer/Owner for review and approval.
B. The contractor shall install all of the required signs and devices in accordance with the Traffic Control Plan included in the contract documents.
C. The contractor shall make arrangements ahead of time with local school district and Port Authority whenever their buses will be inconvenienced during the life of the project.
3.3 INSTALLATION
A. Install manufactured traffic-calming devices according to manufacturer's written instructions unless otherwise indicated.