3-013233 FL - Photographic Documentation .pdf

PDF 96 KB Posted

Attached to
2026 Maintenance Road Program - Mill and Overlay
Solicitation number
US.210836
Issued by
Washington County, Pennsylvania

View the file

Other files

File Type Posted
15-321716 FL - Manufactured Traffic-Calming Devices 1.pdf PDF
38-000101 FL - Project Title Page.pdf PDF
4-017300 FL - Execution .pdf PDF
27-C-700-Rev-1-General-Conditions-2013 .pdf PDF
6-079200 FL - Joint Sealants .pdf PDF
11-014000 FL - Quality Requirements .pdf PDF
22-C430-Bid-Bond-Penal-Sum-Form-2018 .pdf PDF
7-016000 FL - Product Requirements .pdf PDF
30-Public Works Employment Verification Form.pdf PDF
48-18532 - 2026 Paving Program Plan Set - 01.09.2026.pdf PDF
46-C-3 - Panhandle Lot - Mill and Pave.pdf PDF
29-Cover Page.pdf PDF
20-c-615 payment bond 2013 .pdf PDF
45-C-4 - Hickory Grade - Road Widening.pdf PDF
44-St list and limits VA.pdf PDF
14-C-410-Bid-Form-rev1 VA.pdf PDF
35-012900 FL - Payment Procedures-.pdf PDF
28-SFT - Standard Details - Final.pdf PDF
47-Hickory Grade Road - Line Striping Map.pdf PDF
8-017700 FL - Closeout Procedures .pdf PDF
12-Table of Contents Generated by MasterWorks .pdf PDF
19-C-200-Rev-1-Instructions-to-Bidders (pennbid 2).pdf PDF
2-2026 Bid Documents 12-31-25 VA.pdf PDF
23-c-550 notice to proceed 2013 .pdf PDF
37-010000 FL - General Requirements.pdf PDF
40-013100 FL - Project Management and Coordination.pdf PDF
25-c-940 work change directive 2013 .pdf PDF
18-c-510 (rev 1) notice of award 2013.pdf PDF
32-Non Collusion Affidavit.pdf PDF
31-coi.pdf PDF
34-004393 FL - Bid Submittal Checklist.pdf PDF
21-c-941 change order 2013 .pdf PDF
17-011000 FL - Summary.pdf PDF
43-ADDENDUM NO2 1-8-26 VA.pdf PDF
1-2026 Cape Seal Program.pdf PDF
2-013200 FL - Construction Progress Documentation .pdf PDF
13-329200 FL - Turf and Grasses .pdf PDF
16-321216 FL - Asphalt Paving .pdf PDF
33-001113 FL - Advertisement for Bids.pdf PDF
42-ADDENDUM NO1 1-6-26 VA.pdf PDF
26-c-610 performance bond 2013 .pdf PDF
41-Wages 12-30-25 VA.pdf PDF
36-012500 FL - Substitution Procedures.pdf PDF
24-C-520-Agreement-Stipulated-Price-.pdf PDF
10-012200 FL - Unit Prices PAVING .pdf PDF
39-012600 FL - Contract Modification Procedures .pdf PDF
1-2026 Road Maintenance Program.pdf PDF
5-013300 FL - Submittal Procedures .pdf PDF
9-015639 FL - Temporary Tree and Plant Protection .pdf PDF
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2026 Road Maintenance Program

PHOTOGRAPHIC DOCUMENTATION 013233 - 1

SECTION 013233 - PHOTOGRAPHIC DOCUMENTATION

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section includes administrative and procedural requirements for the following:

1. Preconstruction photographs.

2. Periodic construction photographs.

3. Final completion construction photographs.

4. Preconstruction video recordings.

5. Periodic construction video recordings.

6. Construction webcam.

B. Related Requirements:

1. Section 017700 "Closeout Procedures" for submitting photographic documentation as Project Record Documents at Project closeout.

2. Section 017900 "Demonstration and Training" for submitting video recordings of demonstration of equipment and training of Owner's personnel.

3. Section 311000 "Site Clearing" for photographic documentation before site clearing operations commence.

C.

1.3 NOTIFICATION REQUIREMENTS

A. The contractor shall make all necessary arrangements with the property owners and the Owner in regards to his operations, on, over, or adjacent to roads, streets, or other property.

B. The contractor shall coordinate his activities with the local Police Department and other emergency services in the municipality the project is located. The Contractor shall maintain safe traffic flow with the minimum inconvenience to the public. Residents shall be notified in writing at least 48 hours prior to the blocking of driveways or access through their property.

C. The contractor shall arrange with the Owner, the local School District and the Allegheny County Port Authority road closings, delays, and relocation of school bus stops and routes required to complete the work. The Contractor shall work with the local school district to schedule the work to minimize major disruptions to service.

PHOTOGRAPHIC DOCUMENTATION 013233 - 2

1.4 FEDERAL STATE AND LOCAL REQUIREMETNS

A. The contractor shall comply with applicable Federal, State and Local laws, provisions and policies governing health, safety and general welfare of the public and employees working on the project. The Contractor shall comply with the Federal Construction Safety Act (P.L. 91-54), Federal Register, Chapter XVII, Part 1926 of Title 29 Code of Federal Regulations, Occupational Safety and Health Regulations for Construction, and subsequent publications updating these regulations.

B. The contractor shall act as, or designate a competent person to act as, the representative at the site who is familiar with the OSHA regulations for enforcement and for taking immediate corrective action if advised of any noncompliance. Nothing in this Contract shall obligate Engineer/Owner to be responsible to the Borough or to third parties to inspect job sites within the Borough to ensure compliance with Occupational Safety Health Administration (OSHA) standards.

C. The contractor shall notify Pennsylvania One Call System, Inc. at 1-800-242-1776 prior to any construction on site. The Contractor shall verify the depth of any utility lines well in advance of any construction in order to adjust the new line in case of any conflict. No additional compensation shall be given for realigning or relaying utilities or storm sewers due to conflicts of the existing utilities during construction.

D. The contractor is required to fully inform himself/herself concerning location of all public or private structures on, under and/or over the project that may interfere with his/her operations.

The Contractor is required to fully inform himself/herself concerning the location of all public or private structures that may or may not require removal, resetting or reconstruction. The Contractor shall assume that he/she has prepared his/her bid and entered into the Contract in full contemplation of the conditions to be encountered and his/her responsibility in connection therewith. The Engineer has brought such structures to his/her attention, but such indications shall not be assumed to relieve the Contractor of his/her responsibility with respect thereto.

Neither shall the Engineer or the Owner be held responsible for any omission or failure to give notice to the Contractor of any other structures on, under and/or over the project.

E. All bidders All bidders on this project must be pre-qualified by Penn DOT for the classifications of work included in the Contract as prime general contractors. The valid Penn DOT pre-qualification certificate must be attached to the outside of the bid envelope or else the bid will not be opened and it will be returned to the Bidder. The major classifications include the following codes: E (flexible Base Course), F (Bituminous Pavement). After the bids are opened, the Owner will verify the pre-qualification of the low bidder with the Penn DOT Pre-qualification Office

1.5 CONSTRUCTION PHOTOGRAPHS

A. Photographer: Engage a qualified photographer to take construction photographs.

B. General: Take photographs with maximum depth of field and in focus.

1. Maintain key plan with each set of construction photographs that identifies each photographic location.

PHOTOGRAPHIC DOCUMENTATION 013233 - 3

C. Preconstruction Photographs: Before , take photographs of Project site and surrounding properties, including existing items to remain during construction, from different vantage points, as directed by .

1. Flag before taking construction photographs.

2. Take 5 photographs to show existing conditions adjacent to property before starting the

Work.

3. Take 5 photographs of existing buildings either on or adjoining property to accurately record physical conditions at start of construction.

4. Take additional photographs as required to record settlement or cracking of adjacent structures, pavements, and improvements.

D. Final Completion Construction Photographs: Take 10 photographs after date of Substantial Completion for submission as Project Record Documents. will inform photographer of desired vantage points.

E. Additional Photographs: Architect may request photographs in addition to periodic photographs specified. Additional photographs will be paid for by Change Order and are not included in the Contract Sum.

1. Three days' notice will be given, where feasible.

2. In emergency situations, take additional photographs within 24 hours of request.

3. Circumstances that could require additional photographs include, but are not limited to, the following:

a. Special events planned at Project site.

b. Immediate follow-up when on-site events result in construction damage or losses.

c. Photographs to be taken at fabrication locations away from Project site. These photographs are not subject to unit prices or unit-cost allowances.

d. Substantial Completion of a major phase or component of the Work.

e. Extra record photographs at time of final acceptance.

f. Owner's request for special publicity photographs.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION (Not Used)

END OF SECTION 013233

PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section includes administrative and procedural requirements for the following:
1. Preconstruction photographs.
2. Periodic construction photographs.
3. Final completion construction photographs.
4. Preconstruction video recordings.
5. Periodic construction video recordings.
6. Construction webcam.
B. Related Requirements:
1. Section 017700 "Closeout Procedures" for submitting photographic documentation as Project Record Documents at Project closeout.
2. Section 017900 "Demonstration and Training" for submitting video recordings of demonstration of equipment and training of Owner's personnel.
3. Section 311000 "Site Clearing" for photographic documentation before site clearing operations commence.

C.

1.3 NOTIFICATION REQUIREMENTS
A. The contractor shall make all necessary arrangements with the property owners and the Owner in regards to his operations, on, over, or adjacent to roads, streets, or other property.
B. The contractor shall coordinate his activities with the local Police Department and other emergency services in the municipality the project is located. The Contractor shall maintain safe traffic flow with the minimum inconvenience to the public. ...
C. The contractor shall arrange with the Owner, the local School District and the Allegheny County Port Authority road closings, delays, and relocation of school bus stops and routes required to complete the work. The Contractor shall work with the l...
1.4 FEDERAL STATE AND LOCAL REQUIREMETNS
A. The contractor shall comply with applicable Federal, State and Local laws, provisions and policies governing health, safety and general welfare of the public and employees working on the project. The Contractor shall comply with the Federal Constr...
B. The contractor shall act as, or designate a competent person to act as, the representative at the site who is familiar with the OSHA regulations for enforcement and for taking immediate corrective action if advised of any noncompliance. Nothing in...
C. The contractor shall notify Pennsylvania One Call System, Inc. at 1-800-242-1776 prior to any construction on site. The Contractor shall verify the depth of any utility lines well in advance of any construction in order to adjust the new line in c...
D. The contractor is required to fully inform himself/herself concerning location of all public or private structures on, under and/or over the project that may interfere with his/her operations. The Contractor is required to fully inform himself/her...
E. All bidders All bidders on this project must be pre-qualified by Penn DOT for the classifications of work included in the Contract as prime general contractors. The valid Penn DOT pre-qualification certificate must be attached to the outside of th...
1.5 CONSTRUCTION PHOTOGRAPHS
A. Photographer: Engage a qualified photographer to take construction photographs.
B. General: Take photographs with maximum depth of field and in focus.
1. Maintain key plan with each set of construction photographs that identifies each photographic location.
C. Preconstruction Photographs: Before , take photographs of Project site and surrounding properties, including existing items to remain during construction, from different vantage points, as directed by .
1. Flag before taking construction photographs.
2. Take 5 photographs to show existing conditions adjacent to property before starting the Work.
3. Take 5 photographs of existing buildings either on or adjoining property to accurately record physical conditions at start of construction.
4. Take additional photographs as required to record settlement or cracking of adjacent structures, pavements, and improvements.
D. Final Completion Construction Photographs: Take 10 photographs after date of Substantial Completion for submission as Project Record Documents. will inform photographer of desired vantage points.
E. Additional Photographs: Architect may request photographs in addition to periodic photographs specified. Additional photographs will be paid for by Change Order and are not included in the Contract Sum.
1. Three days' notice will be given, where feasible.
2. In emergency situations, take additional photographs within 24 hours of request.
3. Circumstances that could require additional photographs include, but are not limited to, the following:
a. Special events planned at Project site.
b. Immediate follow-up when on-site events result in construction damage or losses.
c. Photographs to be taken at fabrication locations away from Project site. These photographs are not subject to unit prices or unit-cost allowances.
d. Substantial Completion of a major phase or component of the Work.
e. Extra record photographs at time of final acceptance.
f. Owner's request for special publicity photographs.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION (Not Used)