24Jan20_TrackedChanges_06_L-5_PP_Questionnaire.pdf
PDF 89 KB Posted
- Attached to
- Systems Engineering & Integration-2 (SE&I-2) FINAL Request for Proposal (RFP) Federal contract opportunity
- Solicitation number
- FA8811-20-R-0003
About this file
This document is a draft request for proposals for continued systems engineering and integration services. The Space and Missile Systems Center/Launch Enterprise at Los Angeles Air Force Base is soliciting industry feedback on providing continued SE&I-2 services. Interested contractors must request access to the bidder's library by November 8th, 2019 at 12:00pm PDT to obtain additional sensitive documents and a required non-disclosure agreement. An industry day with one-on-one meetings will be held October 23rd through 25th, 2019 to discuss the opportunity further. The North American Industry Classification code for this effort is 541715, with a small business size standard of 1250 employees. Responses to the draft RFP must be submitted using the provided comment resolution matrix by November 8th, 2019.
View the file
Other files for this federal contract opportunity
Show all 50
Systems Engineering & Integration-2 (SE&I-2) FINAL Request for Proposal (RFP) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SMC/ECLLE Page 1 of 13
FA8811-2019-R-0003
Attachment L-4
Past Performance Questionnaire
SMC/ECLLE Page 2 of 13
PAST PERFORMANCE QUESTIONNAIRE (PPQ)
WHEN FILLED IN THIS DOCUMENT IS SOURCE SELECTION SENSITIVE INFORMATION IAW FAR
2.101 & 3.104
SECTION 1: CONTRACT IDENTIFICATION
A. Contractor: ________________________________________________________________________
B. Contractor Cage Code: _________________________________
C. Contract number: ______________________________________
D. Contract type: ______________________________
E. Was this a competitive contract? Yes _____ No _____
F. Period of performance: _________________________________________________________
Initial FTEs provided:________________________________________________________ Final FTEs provided: _______________________________________________________
G. Reason for differences between the initial FTE totals and the Final FTE totals:
H. Initial contract cost: $____________________________
I. Current/final contract cost: $_______________________________
J. Reasons for differences between initial contract cost and final contract costs:
K. Description of service provided (e.g. systems engineering and integration analysis, mission unique activities, payload processing, classified security):
SMC/ECLLE Page 3 of 13
SECTION 2: CUSTOMER OR AGENCY IDENTIFICATION
A. Customer or agency name: __________________________________________________________
B. Procuring Contracting Officer (or equivalent) name, e-mail, and phone number:
C. Customer or agency description (if applicable): __________________________________________
SECTION 3: EVALUATOR IDENTIFICATION
A. Evaluator's name: __________________________________________________________________
B. Evaluator's title: ___________________________________________________________________
C. Evaluator’s email address: ___________________________________________________________
D. Evaluator's phone/fax number: ________________________________________________________
Length of time (number of years/months) evaluator worked on subject contract: ____________________
SMC/ECLLE Page 4 of 13
SECTION 4: EVALUATION
Please indicate your satisfaction with the contractor’s performance by placing an “X” in the appropriate block using the scale provided to the right of each question. This scale is defined as follows:
PERFORMANCE RATING
Rating Definition
Exceptional (E)
Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.
Very Good
(VG)
Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with some minor problems for which corrective actions taken by the contractor was effective.
Satisfactory (S)
Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
Marginal (M)
Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being evaluated reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.
Unsatisfactory (U)
Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains a serious problem(s) for which the contractor’s corrective actions appear or were ineffective.
Not Applicable (N/A)
Unable to provide a rating. Contract did not include performance for this aspect, or information was not available. Do not know. Add comments as appropriate.
Please restrict your responses and comments to actual work accomplished by the contractor in the previous five years.
SMC/ECLLE Page 5 of 13
Qualitative Assessment of Relevant Areas
Ratings Categories E VG S M U N/A
Launch Process and Operations Experience E VG S M U N/A
E1. Did the contractor perform Launch Process and Operations activities to meet the technical requirements of the contract and, if so, what was the performance quality for the launch process and operations work? If not E or VG, please explain.
Comment:__________________________________________________
E2. Did the contractor effectively provide experienced personnel with Launch Process and Operations expertise to meet program needs and, if so, what was the performance quality of the launch process and operations personnel? If not E or VG, please explain.
Comment:__________________________________________________
Rockets and propulsion systems E VG S M U N/A
F1. Did the contractor perform on orbital launch vehicles, launch processes, commercial launches, Launch Mission Integration work to meet the technical requirements of the contract and, if so, what was the performance quality in understanding the risks? If not E or VG, please explain.
Comment:__________________________________________________
SMC/ECLLE Page 6 of 13
F2. Did the contractor effectively provide personnel with relevant experience to meet program needs and, if so, what was the performance quality of the experienced personnel? If not E or VG, please explain.
Comment:__________________________________________________
Mission Integration E VG S M U N/A
G1. Did the contractor perform mission integration work to meet the technical requirements of the contract and, if so, what was the performance quality in understanding the risks associated with mission integration? If not E or VG, please explain.
Comment:__________________________________________________
G2. Did the contractor effectively provide personnel with Mission Integration experience to meet program needs and, if so, what was the performance quality of the experienced mission integration personnel? If not E or VG, please explain.
Comment:__________________________________________________
Data Protection and Security Breach
SMC/ECLLE Page 7 of 13
H1. How well did the contractor ensure that other Contractor’s proprietary data was not released in violation of any non-disclosure agreements? If not E or VG, please explain.
Comment:__________________________________________________
H2. How well did the contractor comply with all security requirements? If not E or VG please explain.
Comment:__________________________________________________
Ground Systems
HI1. Did the contractor perform Launch Ground System engineering to meet the technical requirements of the contract and, if so, what was the performance quality for the ground systems engineering?
If not E or VG, please explain.
Comment:__________________________________________________
HI2. Did the contractor effectively provide experienced personnel with Launch Ground System engineering expertise to meet program needs, and, if so, what was the performance quality of the ground system engineers? If not E or VG please explain.
Comment:__________________________________________________
Propulsion E VG S M U N/A
SMC/ECLLE Page 8 of 13
IJ1. Did the contractor perform Launch Propulsion engineering to meet the technical requirements of the contract and, if so, what was the performance quality for the launch propulsion engineering? If not E or VG, please explain.
Comment:__________________________________________________
IJ2. Did the contractor effectively provide experienced personnel with Launch Propulsion engineering expertise and, if so, what was the performance quality of the launch propulsion engineers? If not E or VG please explain.
Comment:__________________________________________________
Management Responsiveness
JK1. Did the contractor’s management engage in responsive communications that fostered collaboration among stakeholders and/or participant programs to deliver program requirements? If not E or VG, please explain.
Comment:__________________________________________________
JK2. What was the contractor’s overall performance against the requirement? If not E or VG, please explain.
Comment:__________________________________________________
SMC/ECLLE Page 9 of 13
JK3. When needed, did the contractor quickly increase staffing levels to support the mission? If not E or VG, please explain.
Comment:__________________________________________________
JK4. Did the contractor successfully respond to emergency or surge situations? If not E or VG, please explain.
Comment:__________________________________________________
JK5. Did the contractor effectively manage scheduling and communicate issues that may affect other stakeholders and/or project completion? If not E or VG, please explain.
Comment:__________________________________________________
JK6. Did the contractor’s processes and tools in proactively identifying technical issues and risks benefit your organization?
If not E or VG, please explain.
Comment:__________________________________________________
SMC/ECLLE Page 10 of 13
JK7. Did the contractor comprehend and meaningfully integrate complex technical requirements/issues, stakeholder needs/concerns, and schedule dependencies with external interfaces? If not E or VG, please explain.
Comment:__________________________________________________
JK8. Did the contractor sufficiently provide data from their tools at contract completion that was easily transferable to the government and subsequent contractors? If not E or VG, please explain.
Comment:__________________________________________________
1. Please provide any specific strengths that provided value to the customer in the contractor’s execution in their responsibilities.
SMC/ECLLE Page 11 of 13
2. Please identify any contractor weaknesses that were displayed during this contractors’ performance.
3. Please discuss each and every response for which you indicated as Marginal (M) and Unacceptable (U) in response to the questions above (use additional sheets, if necessary).
4. Was this contract partially or completely terminated for default or convenience or are there any pending terminations?
Yes___ Default___ Convenience___ Pending Terminations___ No ___
If yes, please explain (e.g., inability to meet cost, performance, or delivery schedules).
SMC/ECLLE Page 12 of 13
SECTION 5: NARRATIVE SUMMARY
1. Given what you know today about the contractor’s ability to execute, would award to the contractor if given the choice? Please select one response
___ Definitely would award ___ Probably would award ___ Probably would not award ___ Definitely would not award
Are there any reservations about soliciting this contractor in the future or having them perform one of your critical and demanding programs?
2. Please provide any additional comments concerning this contractor’s performance, to include areas where the contractor made improvements throughout the life of the contract, or any additional information you feel is important in the evaluation of the contractor’s performance.
Evaluator’s Signature Date
Please return this completed questionnaire to:
Ashley M. Cunningham, Maj, USAF Ashley.Cunningham.4@us.af.mil Los Angeles Air Force Base Attn: SMC/LE 483 N. Aviation Blvd
SMC/ECLLE Page 13 of 13
El Segundo, CA 90245
| SECTION 3: EVALUATOR IDENTIFICATION |
| ___________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________... |
| 2. Please identify any contractor weaknesses that were displayed during this contractors’ performance. |
| ___________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________... |
| 3. Please discuss each and every response for which you indicated as Marginal (M) and Unacceptable (U) in response to the questions above (use additional sheets, if necessary). |
| ___________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________... |
File details come from the government source that posted it. Updated .