24Jan20_01_FA8811-20-R-0003-A0002.pdf
PDF 174 KB Posted
- Attached to
- Systems Engineering & Integration-2 (SE&I-2) FINAL Request for Proposal (RFP) Federal contract opportunity
- Solicitation number
- FA8811-20-R-0003
About this file
This document provides an amendment to a request for proposal for systems engineering and integration services. The amendment extends the response deadline from January 29, 2020 to February 10, 2020 at 1200 PT. It also updates the performance work statement, instructions to offerors, staffing estimates, and past performance questionnaires to add two new labor categories: Project Integration Manager located at Vandenberg Air Force Base and Software Engineer located at Vandenberg Air Force Base. The evaluation criteria were also updated administratively and to add an "Unacceptable" rating. The solicitation is being issued by the Space and Missile Systems Center for the Department of the Air Force to obtain continued systems engineering and integration services.
View the file
Other files for this federal contract opportunity
Show all 50
Systems Engineering & Integration-2 (SE&I-2) FINAL Request for Proposal (RFP) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
See Block #2
PAGE OF PAGES
2. AMENDMENT/MODIFICATION NO.
3. EFFECTIVE DATE
24 JAN 2020
4. REQUISITION/PURCHASE REQ.NO.
5. PROJECT NO. (If applicable)
6. ISSUED BY SMC/LEK CODE FA8811 7. ADMINISTERED BY (If other than Item 6) CODE
SPACE & MISSILE SYSTEMS CENTER
483 N. AVIATION BLVD.
EL SEGUNDO, CA 90245-2808
JOSHUA T. VANSKIKE (310)653-2495
JOSHUA.VANSKIKE@US.AF.MIL
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NO.
FA8811-20-R-0003
X
9B. DATED (SEE ITEM 11)
12 DEC 2019
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers X is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.
If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATION OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
(X )
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: ( ) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. ITEM
10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor X is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
See SCHEDULE OF CHANGES for FA8811-20-R-0003-A0002 description.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print).
16A. NAME AND TITLE OF SIGNER (Type or print)
ASHLEY CUNNINGHAM
15B. CONTRACTOR/OFFEROR
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
16C. DATE SIGNED
(Signature of person authorized to sign)
BY________________________________________
(Signature of Contracting Officer)
NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV.10-83)
PREVIOUS EDITION UNUSABLE Prescribed by GSA ConWrite Version 7.3.1.0 FAR (48 CFR) 53.243 Created 24 Jan 2020 10:44 AM
SCHEDULE OF CHANGES
FA8811-20-R-0003 0002
The purpose of FA8811-20-R-0003-A0002 is to extend the proposal due date and amend the RFP (FA8811-20-R-0003) and Amendment 0001 (FA8811-20-R-0003-A0001) as follows:
1. Update Part III, Section J as follows:
a. Attachment 1, Performance-Based Work Statement
b. Attachment 12, Instructions to Offerors
c. Attachment 12, Instructions to Offerors, L-3, Staffing Government Estimate
d. Attachment 12, Instructions to Offerors, L-5, Past Performance Questionnaire
e. Attachment 13, Evaluation Criteria
SUMMARY OF CHANGES
Part III, Section J:
Attachment 1, PWS Appendix E, Labor Category Requirements was updated as follows:
- Added description of Project Integration Manager (VAFB)
- Description of Project Integration Manager II, minimum education and experience were revised to: “Minimum Education Required: Bachelor’s Degree majoring in Mechanical/Aerospace engineering or Bachelor Degree in STEM field” and “Minimum Experience Required: 8 years as Mechanical/Aerospace engineer in relevant fields described in section 1.0 of this document”
- Added description of Software Engineer (VAFB)
- Description of Software Engineer II, experience was revised to: “8 years”
Attachment 12, Instructions to Offerors, made administrative updates for accuracy and as follows:
- Revised Section 2.2.7, second paragraph, as follows:
“Legible tables, Excel data files, charts, graphs and figures shall be used wherever practical to depict organizations, systems and layout, implementation schedules, plans, etc. These displays shall be uncomplicated, legible and shall not exceed 11 x 17 inches in size. Foldout pages shall fold entirely within the volume, count as a single page, and are counted as part of the total page count. Foldout pages (11 x
17) are to be used to display information more clearly than would otherwise be possible on an 8.5 x 11 inch page. Foldout pages (11x17) may only be used for large tables, charts, graphs, diagrams and schematics, not for pages of text. Text in tables, charts, graphs and figures shall be no smaller than 8 point font Arial or Times New Roman. These limitations shall also apply to all electronic copy proposals.
Lastly, the Contractor proposed staffing matrix (L-2) shall be no smaller than 11 point font Arial or Times New Roman.”
- Revised Section 2.3, seventh sentence, as follows:
“The Offeror shall submit all proposal documents in a format that enables search/find/copy functions to the maximum extent practicable.”
- Added labor categories to Section 6, Table 6.6.3.1, as follows:
· Project Integration Manager (VAFB)
· Software Engineer (VAFB)
Attachment 12, Instruction to Offerors, L-3, Staffing Government Estimate, made administrative changes to reflect updated Labor Categories (Project Integration Manager (VAFB) and Software Engineer
(VAFB)).
SCHEDULE OF CHANGES
FA8811-20-R-0003 0002
Attachment 12, Instruction to Offerors, L-5, Past Performance Questionnaire, dated 13 Jan 2020 (provided as part of FA8811-20-R-0003-A0001) is hereby replaced with Attachment 12, Instruction to Offerors, L-5, Past Performance Questionnaire, dated 24 January 2020 (provided hereunder and made part of FA8811-20-R-0003-A0002). Note all previously submitted Past Performance Questionnaires are still valid and will be incorporated into the Government’s evaluation.
Attachment 13, Evaluation Criteria, made administrative updates for accuracy and the following revisions:
- Section 1.1, paragraph 3: “This may result in an award to a higher rated, higher priced Offeror, where the decision is consistent with the evaluation Factors, and the SSA reasonably determines a higher price is justified by the beneficial positive aspects of the proposal in the non-cost factors.”
- Section 2, Table 2. Risk Definitions, added “Unacceptable” Rating and its Description as follows:
“Proposal contains a material failure or a combination of significant weaknesses that increases the risk of unsuccessful performance to an unacceptable level.”
- Section 2.3.1, paragraph 1, is revised as follows:
"The combined Technical/Risk Rating depicts how well the Offeror’s proposal meets the Government’s Technical requirements within each Subfactor or element and the risk of unsuccessful performance."
**All Attachment updates have been made with "Tracked Changes"** The RFP response date is hereby extended from 29 Jan 2020 by 1200 PST to 10 February 2020 by 1200
PT.
File details come from the government source that posted it. Updated .