24Jan20_Conformed_01_FA8811-20-R-0003.pdf

PDF 6 MB Posted

Attached to
Systems Engineering & Integration-2 (SE&I-2) FINAL Request for Proposal (RFP) Federal contract opportunity
Solicitation number
FA8811-20-R-0003
Issued by
Department of the Air Force Space Command Space and Missile Systems Center

About this file

This draft Request for Proposals (RFP) solicits continued Systems Engineering & Integration (SE&I-2) services. The Space and Missile Systems Center/Launch Enterprise (SMC/ECL) at Los Angeles Air Force Base, CA is requesting industry feedback on the draft RFP documents included as attachments. Interested contractors may request access to the Bidder's Library containing additional sensitive draft RFP documents by emailing the points of contact and signing a Non-Disclosure Agreement. Responses to the draft RFP are due by November 8, 2019. The Government also plans to hold an Industry Day with one-on-one meetings October 23-25, 2019. Requests to participate must be submitted by October 18 and include contact information. While not a small business set-aside, responses from small and small disadvantaged businesses are encouraged. The North American Industry Classification System code is 541715 with a small business size standard of 1250 employees. Offerors are advised that submitted data may be released to Tecolote Research, Inc. as non-Government administrative support under appropriate non-disclosure agreements.

View the file

Other files for this federal contract opportunity

Other files attached to Systems Engineering & Integration-2 (SE&I-2) FINAL Request for Proposal (RFP), newest first.
File Type Posted
24Jan20_Conformed_02_Performance-Based_Work_Statement.pdf PDF
24Jan20_Conformed_05_L-5_PP_Questionnaire.pdf PDF
24Jan20_TrackedChanges_07_Section M Evaluation Criteria.pdf PDF
13Jan20_Conformed_03__Instructions_to_Offerors.pdf PDF
13Jan20_TrackedChanges_02_PWS.pdf PDF
13Jan20_TrackedChanges_08_L-7 PP_Client_Authorization.docx DOCX document
13Jan20_Conformed_05_L-3_Staffing_Govt_Estimate.xlsx XLSX spreadsheet
13Jan20_Conformed_01_FA8811-20-R-0003.pdf PDF
13Jan20_Conformed_06_L-4 PP_Information.docx DOCX document
13Jan20_TrackedChanges_04_L-1_SB_Percentage_Calculation.xlsx XLSX spreadsheet
12Dec2019_20_L-7 PP Client Authorization.docx DOCX document
12Dec2019_11_Staffing Plan.pdf PDF
12Dec2019_14_L-1_Small_Business_Percentage.xlsx XLSX spreadsheet
12Dec2019_09_30th OG Base Support.pdf PDF
12Dec2019_23_Section M Evaluation Criteria.pdf PDF
12Dec2019_04_SB Subcontracting Plan.pdf PDF
12Dec2019_03_Performance-Based_Work_Statement.pdf PDF
12Dec2019_21_L-8 OCI_Mitigation_Plan_Checklist.pdf PDF
12Dec2019_12_Data Rights Assertions.pdf PDF
12Dec2019_01_Model Contract.pdf PDF
12Dec2019_08_OCI Mitigation Plan.pdf PDF
12Dec2019_15_L-2 Contractor Staffing Plan and Matrix.xlsx XLSX spreadsheet
12Dec2019_07_Performance_Incentive_Plan.pdf PDF
12Dec2019_02_ExhibitA_CDRLs.pdf PDF
12Dec2019_13_Section L Instructions to Offerors.pdf PDF
6 Dec 2019_L-4_Past_Performance_Information_for Offerors.docx DOCX document
6 Dec 2019_Performance-Based_Work_Statement.docx DOCX document
6 Dec 2019_L-5 Past Performance Questionnaire.docx DOCX document
26Nov2019_Time Phased Person Loading Graph Sample.pdf PDF
26Nov2019_Consolidated_Industry_Day_Comments.pdf PDF
22Nov2019_Section_M_Evaluation_Criteria.docx DOCX document
08_Staffing_Plan_-_Reserved.docx DOCX document
13_Section_M_Evaluation_Criteria.docx DOCX document
04_Objective_Performance_Incentive_Plan.docx DOCX document
12f__L-6_Subcontract__Teaming_Partner_Consent_Letter.docx DOCX document
12h_L-8_OCI_Mitigation_Plan_Checklist.pdf PDF
09_Data_Rights_Assertions_-_Reserved.docx DOCX document
11_Small_Business_Participation_Commitment_Document.pdf PDF
12e_L-5_Past_Performance_Questionnaire.docx DOCX document
___SE&I-2_DRAFT_RFP_CRM.xlsx XLSX spreadsheet
12b_L-2_Contractor_Staffing_Plan_and_Matrix.xlsx XLSX spreadsheet
12d_L-4_Past_Performance_Information_for_Offerors.docx DOCX document
07_45th_OG_Base_Support.docx DOCX document
06_30th_OG_Base_Support.docx DOCX document
03_DD_Form_254_Contract_Security.pdf PDF
12_Section_L_Instructions_to_Offerors.docx DOCX document
_ExhibitA_CDRLs.pdf PDF
01_Performance-Based_Work_Statement.docx DOCX document
05_OCI_Mitigation_Plan_-_Reserved.docx DOCX document
__Model_Contract_FA8811-20-R-0003.pdf PDF
Show all 50

Systems Engineering & Integration-2 (SE&I-2) FINAL Request for Proposal (RFP) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION, OFFER AND AWARD

1. THIS CONTRACT IS A RATED ORDER

I

RATING

I

PAGE OF PAGES

UNDER DPAS (15 CFR 350) • D0-A2 1 I 111

2. CONTRACT NO. 3. SOLICITATION NO. 4. TYPE OF SOLICITATION 5. DATE ISSUED

12 December 2019

6. REQUISITION/PURCHASE NO.

FA8811-20-R-0003

D SEALED BID (IFB)

IZI NEGOTIATED (RFP)

CODE I FA8811 8. ADDRESS OFFER TO (If other than Item 7) 7. ISSUED BY SMC/ECLK

SPACE & MISSILE SYSTEMS CENTER

4 83 N. AVIATION BLVD.

EL SEGUNDO, CA 90245-280 8

JOSHUA T. VANSKIKE (310)653-2495

JOSH UA.VANSKI KE@US.AF. Ml L

NOTE: In sealed bid solicita tions "offer" and "offerer" mean "bid" and "bidder".

SOLICITATION

9. Proposal Acceptance Period: 13 December 2019 through 29 January 2020 by 1200 PST.

10. FOR A. NAME B. TELEPHONE (Include area code) C. E-MAIL ADDRESS

INFORMATION (NO COLLECT CALLS)

CALL: • ASHLEY CUNNINGHAM 310-653-353 7 ASHLEY. CUNNI NGHAM.4 @US.AF.

MIL

11. TABLE OF CONTENTS

('v) SEC. DESCRIPTION PAGE(S) ('v) SEC DESCRIPTION PAGE(S)

PART I - THE SCHEDULE PART II - CONTRACT CLAUSES

'Y A SOLICITATION/CONTRACT FORM 1 'Y I CONTRACT CLAUSES 91

'Y B SUPPLIES OR SERVICES AND PRICES/COSTS 2 PART Ill - LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACH.

'Y C DESCRIPTION/SPECS./WORK STATEMENT 80 'Y J LIST OF ATTACHMENTS 111

'Y D PACKAGING AND MARKING 81 PART IV - REPRESENTATIONS AND INSTRUCTIONS

'Y E INSPECTION AND ACCEPTANCE 82 'Y K REPRESENTATIONS, CERTIFICATIONS, K - 1

'Y F DELIVERIES OR PERFORMANCE 83 AND OTHER STATEMENTS OF OFFERORS

'Y G CONTRACT ADMINISTRATION DATA 8 4 'Y L INSTRS, CONDS, AND NOTICES TO OFFERORS L- 1

'Y H SPECIAL CONTRACT REQUIREMENTS 86 'Y M EVALUATION FACTORS FOR AWARD M - 1

OFFER (Must be fully completed by offeror) NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period is inserted by the offeror) from the date of receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the desiqnated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT 10 CALENDAR DAYS 20 CALENDAR DAYS 30 CALENDAR DAYS CALENDAR DAYS

(See Section I, Clause No. 52.232-8) • % % % %

14. ACKNOWLEDGEMENTS OF AMENDMENTS AMENDMENT NO. DATE AMENDMENT NO. DATE

(The offeror acknowledges receipt of amend-ments to the SOLICITATION for offerors and related documents numbered and dated:

15A. NAME CODE I I FACILITY 16. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

AND OFFER (Type or print)

ADDRESS

OF

OFFEROR

15B. TELEPHONE NO. (Include area p

15C. CHECK IF REMITTANCE ADDRESS 17. SIGNATURE 18. OFFER DATE

code) IS DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETI-

TION: 23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified) •

D 10 u.s.c. 23o4(c) ( ) D 41 u.s.c. 253(c) ( )

24. ADMINISTERED BY (If other than Item 7) CODE I 25. PAYMENT WILL BE MADE BY CODE

26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DA TE

(Sia nature of Contractina Officer)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or bv other authorized official written notice.

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS UNUSABLE

ConWrite Version 7.1.600 Created 09 Dec 2019 2:05 PM

STANDARD FORM 33 (REV. 9-97)

Prescribed by GSA

FAR (48 CFR) 53.21(c)

PART I - THESCHEDULE

SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS

ITEM

Qty SUPPLIES OR SERVICES Purch Unit

Unit Price Total Item Amount

Months

Noun:

PSC:

CCAFS/45TH SW (PROCUREMENT FUNDS) (BASE YEAR)

R425

NSN:

Contract type:

Inspection:

Acceptance:

FOB:

Descriptive Data:

N - Not Applicable

U - COST PLUS FIXED FEE

DESTINATION

DESTINATION

DESTINATION

The Contractor shall provide all labor, office rent, materials, management, supplies, tools, and services required to perform all work required in accordance with Attachment 1, Launch Enterprise Systems Engineering & Integration (ECL/SE&I), Performance-based Work Statement (PWS), as set forth in the PWS sections 3.2 Transition of SE&l-2 Effort* and 3.4.1 SMC/ECL Launch Services Support.

The cost for this CLIN is as follows:

Estimated cost: $ [TO BE FILLED IN BY OFFEROR] Fixed Fee: $[TO BE FILLED IN BY OFFEROR]

The period of performance for this CLIN is 24 Aug 2020 to 23 Aug 2021.

*In the event of following Option is not exercised.

Noun:

PSC:

NSN:

Contract type:

Inspection:

Acceptance:

FOB:

Months

CCAFS/45TH SW (O&M FUNDS) (BASE YEAR)

R425

N - Not Applicable

U - COST PLUS FIXED FEE

DESTINATION

DESTINATION

DESTINATION

Descriptive Data:

The Contractor shall provide all labor, office rent, materials, management, supplies, tools, and services required to perform all work required in accordance with Attachment 1, Launch Enterprise Systems Engineering & Integration (ECL/SE&I), Performance-based Work Statement (PWS), as set forth in PWS sections 3.2 Transition of SE&l-2 Effort* and 3.4.2 45TH Operations Group (45 OG) Requirements.

The cost for this CLIN is as follows:

Estimated cost: $ [TO BE FILLED IN BY OFFEROR] Fixed Fee: $[TO BE FILLED IN BY OFFEROR]

The period of performance for this CLIN is 24 Aug 2020 to 23 Aug 2021.

*In the event of following Option is not exercised.

SECTIONB FA8811-20-R-0003

ITEM

Qty SUPPLIES OR SERVICES Purch Unit

Unit Price Total Item Amount

Months

Noun:

PSC:

VAFB/ 30TH SW (PROCUREMENT FUNDS) (BASE YEAR)

R425

NSN:

Contract type:

Inspection:

Acceptance:

FOB:

Descriptive Data:

N - Not Applicable

U - COST PLUS FIXED FEE

DESTINATION

DESTINATION

DESTINATION

The Contractor shall provide all labor, office rent, materials, management, supplies, tools, and services required to perform all work required in accordance with Attachment 1, Launch Directorate Systems Engineering & Integration (ECL/SE&I), Performance-based Work Statement (PWS), as set forth in PWS sections 3.2 Transition of SE&l-2 Effort* and

3.5.1 SMC/ECL Launch Services Support.

The cost for this CLIN is as follows:

Estimated cost: $ [TO BE FILLED IN BY OFFEROR] Fixed Fee: $[TO BE FILLED IN BY OFFEROR]

The period of performance for this CLIN is 24 Aug 2020 to 23 Aug 2021.

*In the event of following Option is not exercised.

Noun:

PSC:

NSN:

Contract type:

Inspection:

Acceptance:

FOB:

Months

VAFB/30TH SW (O&M FUNDS) (BASE YEAR)

R425

N - Not Applicable

U - COST PLUS FIXED FEE

DESTINATION

DESTINATION

DESTINATION

Descriptive Data:

The Contractor shall provide all labor, office rent, materials, management, supplies, tools, and services required to perform all work required in accordance with Attachment 1, Launch Enterprise Systems Engineering & Integration (ECL/SE&I), Performance-based Work Statement (PWS), as set forth in PWS sections 3.2 Transition of SE&l-2 Effort* and 3.5.2 30 SW/30 OG Launch Programs Requirement.

The cost for this CLIN is as follows:

Estimated cost: $ [TO BE FILLED IN BY OFFEROR] Fixed Fee: $[TO BE FILLED IN BY OFFEROR]

The period of performance for this CLIN is 24 Aug 2020 to 23 Aug 2021.

*In the event of following Option is not exercised.

PAGE40F 111

ITEM

Qty SUPPLIES OR SERVICES Purch Unit

Unit Price Total Item Amount

Noun:

PSC:

NSN:

Contract type:

Inspection:

Acceptance:

FOB:

Months

LAAFB (RDT&E) (BASE YEAR)

R425

N - Not Applicable

U - COST PLUS FIXED FEE

DESTINATION

DESTINATION

DESTINATION

Descriptive Data:

The Contractor shall provide all labor, office rent, materials, management, supplies, tools, and services required to perform all work required in accordance with Attachment 1, Launch Enterprise Systems Engineering & Integration (ECL/SE&I), Performance-based Work Statement (PWS), as set forth in PWS sections 3.2 Transition of SE&l-2 Effort*, 3.6 Research, Development, Test, and Evaluation (RDT&E), and 3.7 CCAFS, KSC, VAFB Support.

The cost for this CLIN is as follows:

Estimated cost: $ [TO BE FILLED IN BY OFFEROR] Fixed Fee: $[TO BE FILLED IN BY OFFEROR]

The period of performance for this CLIN is 24 Aug 2020 to 23 Aug 2021.

*In the event of following Option is not exercised.

Months

Noun:

PSC:

OTHER DIRECT COSTS (TRAVEL ONLY) (BASE YEAR)

R425

NSN:

Contract type:

Inspection:

Acceptance:

FOB:

N - Not Applicable

S- COST

DESTINATION

DESTINATION

DESTINATION

Descriptive Data:

The Contractor shall provide Other Direct Costs (ODC) in support of Attachment 1, Launch Enterprise Systems Engineering & Integration (ECL/SE&I), Performance-Based Work Statement.

This ODC CLIN shall be used only for travel and per diem necessary to perform the requirements of this contract. No indirect costs shall be applied to this CLIN.

This a cost-reimbursable CLIN with an estimated cost of $500,000. No profit, fee or indirect costs are associated with this CLIN.

The period of performance for this CLIN is 24 Aug 2020 to 23 Aug 2021.

All travel costs shall be in accordance with the Joint Travel Regulations.

ITEM

Qty

SUPPLIES OR SERVICES Purch Unit

Unit Price

Total Item Amount

Noun:

PSC:

001423 is Exhibit:

DATA (NSP) (BASE YEAR)

R425

A

Contract type: S- COST

Completion Date: ASREQ

Descriptive Data:

The Contractor shall provide all data in accordance with the Contractor Data

Requirements List - Exhibit A, and all applicable documents listed therein.

The period of performance for this CLIN is 24 Aug 2020 to 23 Aug 2021.

This CLIN is Not Separately Priced (NSP). The cost of all data furnished under this CLIN is included in the estimated costs of CLINs 0100 - 0105.

OPTION CLIN

Noun:

PSC:

NSN:

Contract type:

Inspection:

Acceptance:

FOB:

Descriptive Data:

INCENTIVE PLAN (BASE YEAR)

R425

N - Not Applicable

J - FIRM FIXED PRICE

DESTINATION

DESTINATION

DESTINATION

This Firm Fixed Price CLIN shall be used to provide for the payment of incentive(s) earned, if any, in accordance with Attachement 4, Objective Performance Incentive Plan.

The incentive plan will outline the objective performance and exit criteria of how incentives will be earned.

The period of performance for this CLIN is 24 Aug 2020 to 23 Aug 2021.

If the contractor earns incentive(s ), this CLIN will be exercised 30-90 days after the period of performance ends.

PAGE60F 111

ITEM

Qty SUPPLIES OR SERVICES Purch Unit

Unit Price Total Item Amount

OPTION CLIN

Noun:

PSC:

NSN:

Contract type:

Inspection:

Acceptance:

FOB:

Descriptive Data:

CCAFS/45TH SW (O&M FUNDS) (OPTION YEAR 1)

R425

N - Not Applicable

U - COST PLUS FIXED FEE

DESTINATION

DESTINATION

DESTINATION

The Contractor shall provide all labor, office rent, materials, management, supplies, tools, and services required to perform all work required in accordance with Attachment 1, Launch Enterprise Systems Engineering & Integration (ECL/SE&I), Performance-based Work Statement (PWS), as set forth in PWS sections 3.2 Transition of SE&l-2 Effort* and 3.4.2 45TH Operations Group (45 OG) Requirements.

The cost for this CLIN is as follows:

Estimated cost:$ [TO BE FILLED IN BY OFFEROR] Fixed Fee: $[TO BE FILLED IN BY OFFEROR]

The period of performance for this CLIN is 24 Aug 2021 to 23 Aug 2022.

*In the event of following Option is not exercised.

PAGE90F 111

ITEM

Qty SUPPLIES OR SERVICES Purch Unit

Unit Price Total Item Amount

OPTION CLIN

Noun:

PSC:

NSN:

Contract type:

Inspection:

Acceptance:

FOB:

Descriptive Data:

VAFB/30TH SW (O&M FUNDS) (OPTION YEAR 1)

R425

N - Not Applicable

U - COST PLUS FIXED FEE

DESTINATION

DESTINATION

DESTINATION

The Contractor shall provide all labor, office rent, materials, management, supplies, tools, and services required to perform all work required in accordance with Attachment 1, Launch Enterprise Systems Engineering & Integration (ECL/SE&I), Performance-based Work Statement (PWS), as set forth in PWS sections 3.2 Transition of SE&l-2 Effort* and 3.5.2 30 SW/30 OG Launch Programs Requirement.

The cost for this CLIN is as follows:

Estimated cost:$ [TO BE FILLED IN BY OFFEROR] Fixed Fee: $[TO BE FILLED IN BY OFFEROR]

The period of performance for this CLIN is 24 Aug 2021 to 23 Aug 2022.

*In the event of following Option is not exercised.

ITEM

Qty SUPPLIES OR SERVICES Purch Unit

Unit Price Total Item Amount

OPTION CLIN

Noun:

PSC:

NSN:

Contract type:

Inspection:

Acceptance:

FOB:

Descriptive Data:

OPTION CLIN

Noun:

PSC:

NSN:

Contract type:

Inspection:

Acceptance:

FOB:

LAAFB (RDT&E) (OPTION YEAR 1)

R425

N - Not Applicable

U - COST PLUS FIXED FEE

DESTINATION

DESTINATION

DESTINATION

The Contractor shall provide all labor, office rent, materials, management, supplies, tools, and services required to perform all work required in accordance with Attachment 1, Launch Enterprise Systems Engineering & Integration (ECL/SE&I), Performance-based Work Statement (PWS), as set forth in PWS sections 3.2 Transition of SE&l-2 Effort*, 3.6 Research, Development, Test, and Evaluation (RDT&E), and 3.7 CCAFS, KSC, VAFB Support.

The cost for this CLIN is as follows:

Estimated cost:$ [TO BE FILLED IN BY OFFEROR] Fixed Fee: $[TO BE FILLED IN BY OFFEROR]

The period of performance for this CLIN is 24 Aug 2021 to 23 Aug 2022.

*In the event of following Option is not exercised.

OTHER DIRECT COSTS (TRAVEL ONLY) (OPTION YEAR 1)

R425

N - Not Applicable

S- COST

DESTINATION

DESTINATION

DESTINATION

Descriptive Data:

The Contractor shall provide Other Direct Costs (ODC) in support of Attachment 1, Launch Enterprise Systems Engineering & Integration (ECL/SE&I), Performance-Based Work Statement.

This ODC CLIN shall be used only for travel and per diem necessary to perform the requirements of this contract. No indirect costs shall be applied to this CLIN.

This a cost-reimbursable CLIN with an estimated cost of $500,000. No profit, fee or indirect costs are associated with this CLIN.

The period of performance for this CLIN is 24 Aug 2021 to 23 Aug

2022.

All travel costs shall be in accordance with the Joint Travel Regulations.

ITEM

Qty SUPPLIES OR SERVICES Purch Unit

Unit Price Total Item Amount

OPTION CLIN

Noun:

PSC:

NSN:

Contract type:

Inspection:

Acceptance:

FOB:

Descriptive Data:

CCAFS/45TH SW (O&M FUNDS) (OPTION YEAR 2)

R425

N - Not Applicable

U - COST PLUS FIXED FEE

DESTINATION

DESTINATION

DESTINATION

The Contractor shall provide all labor, office rent, materials, management, supplies, tools, and services required to perform all work required in accordance with Attachment 1, Launch Enterprise Systems Engineering & Integration (ECL/SE&I), Performance-based Work Statement (PWS), as set forth in PWS sections 3.2 Transition of SE&l-2 Effort* and 3.4.2 45TH Operations Group (45 OG) Requirements.

The cost for this CLIN is as follows:

Estimated cost:$ [TO BE FILLED IN BY OFFEROR] Fixed Fee: $[TO BE FILLED IN BY OFFEROR]

The period of performance for this CLIN is 24 Aug 2022 to 23 Aug 2023.

*In the event of following Option is not exercised.

ITEM

Qty SUPPLIES OR SERVICES Purch Unit

Unit Price Total Item Amount

OPTION CLIN

Noun:

PSC:

NSN:

Contract type:

Inspection:

Acceptance:

FOB:

Descriptive Data:

VAFB/30TH SW (O&M FUNDS) (OPTION YEAR 2)

R425

N - Not Applicable

U - COST PLUS FIXED FEE

DESTINATION

DESTINATION

DESTINATION

The Contractor shall provide all labor, office rent, materials, management, supplies, tools, and services required to perform all work required in accordance with Attachment 1, Launch Enterprise Systems Engineering & Integration (ECL/SE&I), Performance-based Work Statement (PWS), as set forth in PWS sections 3.2 Transition of SE&l-2 Effort* and 3.5.2 30 SW/30 OG Launch Programs Requirement.

The cost for this CLIN is as follows:

Estimated cost:$ [TO BE FILLED IN BY OFFEROR] Fixed Fee: $[TO BE FILLED IN BY OFFEROR]

The period of performance for this CLIN is 24 Aug 2022 to 23 Aug 2023.

*In the event of following Option is not exercised.

ITEM

Qty SUPPLIES OR SERVICES Purch Unit

Unit Price Total Item Amount

OPTION CLIN

Noun:

PSC:

NSN:

Contract type:

Inspection:

Acceptance:

FOB:

Descriptive Data:

LAAFB (RDT&E) (OPTION YEAR 2)

R425

N - Not Applicable

U - COST PLUS FIXED FEE

DESTINATION

DESTINATION

DESTINATION

The Contractor shall provide all labor, office rent, materials, management, supplies, tools, and services required to perform all work required in accordance with Attachment 1, Launch Enterprise Systems Engineering & Integration (ECL/SE&I), Performance-based Work Statement (PWS), as set forth in PWS sections 3.2 Transition of SE&l-2 Effort*, 3.6 Research, Development, Test, and Evaluation (RDT&E) and 3.7 CCAFS, KSC, VAFB Support.

The cost for this CLIN is as follows:

Estimated cost:$ [TO BE FILLED IN BY OFFEROR] Fixed Fee: $[TO BE FILLED IN BY OFFEROR]

The period of performance for this CLIN is 24 Aug 2022 to 23 Aug 2023.

*In the event of following Option is not exercised.

ITEM

Qty SUPPLIES OR SERVICES Purch Unit

Unit Price Total Item Amount

OPTION CLIN

Noun:

PSC:

NSN:

Contract type:

Inspection:

Acceptance:

FOB:

OTHER DIRECT COSTS (TRAVEL ONLY) (OPTION YEAR 2)

R425

N - Not Applicable

S- COST

DESTINATION

DESTINATION

DESTINATION

Descriptive Data:

The Contractor shall provide Other Direct Costs (ODC) in support of Attachment 1, Launch Enterprise Systems Engineering & Integration (ECL/SE&I), Performance-Based Work Statement.

This ODC CLIN shall be used only for travel and per diem necessary to perform the requirements of this contract. No indirect costs shall be applied to this CLIN.

This a cost-reimbursable CLIN with an estimated cost of $500,000. No profit, fee or indirect costs are associated with this CLIN.

The period of performance for this CLIN is 24 Aug 2022 to 23 Aug 2023.

All travel costs shall be in accordance with the Joint Travel Regulations.

OPTION CLIN

Noun:

PSC:

001423 is Exhibit:

Descriptive Data:

DATA (NSP) (OPTION YEAR 2)

R425

A

The Contractor shall provide all data in accordance with the

Contractor Data Requirements List - Exhibit A, and all applicable documents listed therein.

This CLIN is Not Separately Priced (NSP). The cost of all data furnished under this CLIN is included in the estimated costs of CLINs 0300 - 0305.

The period of performance for this CLIN is 24 Aug 2022 to 23 Aug 2023.

ITEM

Qty SUPPLIES OR SERVICES Purch Unit

Unit Price Total Item Amount

OPTION CLIN

Noun:

PSC:

NSN:

Contract type:

Inspection:

Acceptance:

FOB:

Descriptive Data:

CCAFS/45TH SW (O&M FUNDS) (OPTION YEAR 3)

R425

N - Not Applicable

U - COST PLUS FIXED FEE

DESTINATION

DESTINATION

DESTINATION

The Contractor shall provide all labor, office rent, materials, management, supplies, tools, and services required to perform all work required in accordance with Attachment 1, Launch Enterprise Systems Engineering & Integration (ECL/SE&I), Performance-based Work Statement (PWS), as set forth in PWS sections 3.2 Transition of SE&l-2 Effort* and 3.4.2 45TH Operations Group (45 OG) Requirements.

The cost for this CLIN is as follows:

Estimated cost: $ [TO BE FILLED IN BY OFFEROR] Fixed Fee: $[TO BE FILLED IN BY OFFEROR]

The period of performance for this CLIN is 24 Aug 2023 to 23 Aug 2024.

*In the event of following Option is not exercised.

ITEM

Qty SUPPLIES OR SERVICES Purch Unit

Unit Price Total Item Amount

OPTION CLIN

Noun:

PSC:

NSN:

Contract type:

Inspection:

Acceptance:

FOB:

Descriptive Data:

VAFB/30TH SW (O&M FUNDS) (OPTION YEAR 3)

R425

N - Not Applicable

U - COST PLUS FIXED FEE

DESTINATION

DESTINATION

DESTINATION

The Contractor shall provide all labor, office rent, materials, management, supplies, tools, and services required to perform all work required in accordance with Attachment 1, Launch Enterprise Systems Engineering & Integration (ECL/SE&I), Performance-based Work Statement (PWS), as set forth in PWS sections 3.2 Transition of SE&l-2 Effort* and 3.5.2 30 SW/30 OG Launch Programs Requirement.

The cost for this CLIN is as follows:

Estimated cost:$ [TO BE FILLED IN BY OFFEROR] Fixed Fee: $[TO BE

FILLED IN BY

OFFEROR]

The period of performance for this CLIN is 24 Aug 2023 to 23 Aug 2024.

*In the event of following Option is not exercised.

ITEM

Qty SUPPLIES OR SERVICES Purch Unit

Unit Price Total Item Amount

OPTION CLIN

Noun:

PSC:

NSN:

Contract type:

Inspection:

Acceptance:

FOB:

Descriptive Data:

LAAFB (RDT&E) (OPTION YEAR 3)

R425

N - Not Applicable

U - COST PLUS FIXED FEE

DESTINATION

DESTINATION

DESTINATION

The Contractor shall provide all labor, office rent, materials, management, supplies, tools, and services required to perform all work required in accordance with Attachment 1, Launch Enterprise Systems Engineering & Integration (ECL/SE&I), Performance-based Work Statement (PWS), as set forth in PWS sections 3.2 Transition of SE&l-2 Effort*, 3.6 Research, Development, Test, and Evaluation (RDT&E), and 3.7 CCAFS, KSC, VAFB Support.

The cost for this CLIN is as follows:

Estimated cost: $ [TO BE FILLED IN BY OFFEROR] Fixed Fee: $[TO BE FILLED IN BY OFFEROR]

The period of performance for this CLIN is 24 Aug 2023 to 23 Aug 2024.

*In the event of following Option is not exercised.

ITEM

Qty SUPPLIES OR SERVICES Purch Unit

Unit Price Total Item Amount

OPTION CLIN

Noun:

PSC:

NSN:

Contract type:

Inspection:

Acceptance:

FOB:

OTHER DIRECT COSTS (TRAVEL ONLY) (OPTION YEAR 3)

R425

N - Not Applicable

S- COST

DESTINATION

DESTINATION

DESTINATION

Descriptive Data:

The Contractor shall provide Other Direct Costs (ODC) in support of Attachment 1, Launch Enterprise Systems Engineering & Integration (ECL/SE&I), Performance-Based Work Statement.

This ODC CLIN shall be used only for travel and per diem necessary to perform the requirements of this contract. No indirect costs shall be applied to this CLIN.

This a cost-reimbursable CLIN with an estimated cost of $500,000. No profit, fee or indirect costs are associated with this CLIN.

The period of performance for this CLIN is 24 Aug 2023 to 23 Aug 2024.

All travel costs shall be in accordance with the Joint Travel Regulations.

OPTION CLIN

Noun:

PSC:

001423 is Exhibit:

Descriptive Data:

DATA (NSP) (OPTION YEAR 3)

R425

A

The Contractor shall provide all data in accordance with the

Contractor Data Requirements List - Exhibit A, and all applicable documents listed therein.

This CLIN is Not Separately Priced (NSP). The cost of all data furnished under this CLIN is included in the estimated costs of CLINs 0400 - 0405.

The period of performance for this CLIN is 24 Aug 2023 to 23 Aug 2024.

ITEM

Qty SUPPLIES OR SERVICES Purch Unit

Unit Price Total Item Amount

OPTION CLIN

Noun:

PSC:

NSN:

Contract type:

Inspection:

Acceptance:

FOB:

Descriptive Data:

CCAFS/45TH SW (O&M FUNDS) (OPTION YEAR 4)

R425

N - Not Applicable

U - COST PLUS FIXED FEE

DESTINATION

DESTINATION

DESTINATION

The Contractor shall provide all labor, office rent, materials, management, supplies, tools, and services required to perform all work required in accordance with Attachment 1, Launch Enterprise Systems Engineering & Integration (ECL/SE&I), Performance-based Work Statement (PWS), as set forth in PWS sections 3.2 Transition of SE&l-2 Effort*and 3.4.2 45TH

Operations Group (45 OG) Requirements.

The cost for this CLIN is as follows:

Estimated cost:$ [TO BE FILLED IN BY OFFEROR] Fixed Fee: $[TO BE FILLED IN BY OFFEROR]

The period of performance for this CLIN is 24 Aug 2024 to 23 Aug 2025.

*In the event of following Option is not exercised.

ITEM

Qty SUPPLIES OR SERVICES Purch Unit

Unit Price Total Item Amount

OPTION CLIN

Noun:

PSC:

NSN:

Contract type:

Inspection:

Acceptance:

FOB:

Descriptive Data:

VAFB/30TH SW (O&M FUNDS) (OPTION YEAR 4)

R425

N - Not Applicable

U - COST PLUS FIXED FEE

DESTINATION

DESTINATION

DESTINATION

The Contractor shall provide all labor, office rent, materials, management, supplies, tools, and services required to perform all work required in accordance with Attachment 1, Launch Enterprise Systems Engineering & Integration (ECL/SE&I), Performance-based Work Statement (PWS), as set forth in PWS sections 3.2 Transition of SE&l-2 Effort* and 3.5.2 30 SW/30 OG Launch Programs Requirement.

The cost for this CLIN is as follows:

Estimated cost:$ [TO BE FILLED IN BY OFFEROR] Fixed Fee: $[TO BE FILLED IN BY OFFEROR]

The period of performance for this CLIN is 24 Aug 2024 to 23 Aug 2025.

*In the event of following Option is not exercised.

ITEM

Qty SUPPLIES OR SERVICES Purch Unit

Unit Price Total Item Amount

OPTION CLIN

Noun:

PSC:

NSN:

Contract type:

Inspection:

Acceptance:

FOB:

Descriptive Data:

OPTION CLIN

Noun:

PSC:

NSN:

Contract type:

Inspection:

Acceptance:

FOB:

LAAFB (RDT&E) (OPTION YEAR 4)

R425

N - Not Applicable

U - COST PLUS FIXED FEE

DESTINATION

DESTINATION

DESTINATION

The Contractor shall provide all labor, office rent, materials, management, supplies, tools, and services required to perform all work required in accordance with Attachment 1, Launch Enterprise Systems Engineering & Integration (ECL/SE&I), Performance-based Work Statement (PWS), as set forth in PWS sections 3.2 Transition of SE&l-2 Effort*, 3.6 Research, Development, Test, and Evaluation (RDT&E), and 3.7 CCAFS, KSC, VAFB Support.

The cost for this CLIN is as follows:

Estimated cost: $ [TO BE FILLED IN BY OFFEROR] Fixed Fee: $[TO BE FILLED IN BY OFFEROR]

The period of performance for this CLIN is 24 Aug 2024 to 23 Aug 2025.

*In the event of following Option is not exercised.

OTHER DIRECT COSTS (TRAVEL ONLY) (OPTION YEAR 4)

R425

N - Not Applicable

S- COST

DESTINATION

DESTINATION

DESTINATION

Descriptive Data:

The Contractor shall provide Other Direct Costs (ODC) in support of Attachment 1, Launch Enterprise Systems Engineering & Integration (ECL/SE&I), Performance-Based Work Statement.

This ODC CLIN shall be used only for travel and per diem necessary to perform the requirements of this contract. No indirect costs shall be applied to this CLIN.

This a cost-reimbursable CLIN with an estimated cost of $500,000. No profit, fee or indirect costs are associated with this CLIN.

The period of performance for this CLIN is 24 Aug 2024 to 23 Aug 2025.

All travel costs shall be in accordance with the Joint Travel Regulations.

ITEM

Qty SUPPLIES OR SERVICES Purch Unit

Unit Price Total Item Amount

OPTION CLIN

Noun:

PSC:

NSN:

Contract type:

Inspection:

Acceptance:

FOB:

Descriptive Data:

CCAFS/45TH SW (O&M FUNDS) (OPTION YEAR 5)

R425

N - Not Applicable

U - COST PLUS FIXED FEE

DESTINATION

DESTINATION

DESTINATION

The Contractor shall provide all labor, office rent, materials, management, supplies, tools, and services required to perform all work required in accordance with Attachment 1, Launch Enterprise Systems Engineering & Integration (ECL/SE&I), Performance-based Work Statement (PWS), as set forth in PWS sections 3.2 Transition of SE&l-2 Effort* and 3.4.2 45TH

Operations Group (45 OG) Requirements.

The cost for this CLIN is as follows:

Estimated cost:$ [TO BE FILLED IN BY OFFEROR] Fixed Fee: $[TO BE FILLED IN BY OFFEROR]

The period of performance for this CLIN is 24 Aug 2025 to 23 Aug 2026.

*In the event of following Option is not exercised.

ITEM

Qty SUPPLIES OR SERVICES Purch Unit

Unit Price Total Item Amount

OPTION CLIN

Noun:

PSC:

NSN:

Contract type:

Inspection:

Acceptance:

FOB:

Descriptive Data:

VAFB/30TH SW (O&M FUNDS) (OPTION YEAR 5)

R425

N - Not Applicable

U - COST PLUS FIXED FEE

DESTINATION

DESTINATION

DESTINATION

The Contractor shall provide all labor, office rent, materials, management, supplies, tools, and services required to perform all work required in accordance with Attachment 1, Launch Enterprise Systems Engineering & Integration (ECL/SE&I), Performance-based Work Statement (PWS), as set forth in PWS sections 3.2 Transition of SE&l-2 Effort* and 3.5.2 30 SW/30 OG Launch Programs Requirement.

The cost for this CLIN is as follows:

Estimated cost:$ [TO BE FILLED IN BY OFFEROR] Fixed Fee: $[TO BE FILLED IN BY OFFEROR]

The period of performance for this CLIN is 24 Aug 2025 to 23 Aug 2026.

*In the event of following Option is not exercised.

ITEM

Qty SUPPLIES OR SERVICES Purch Unit

Unit Price Total Item Amount

OPTION CLIN

Noun:

PSC:

NSN:

Contract type:

Inspection:

Acceptance:

FOB:

Descriptive Data:

OPTION CLIN

Noun:

PSC:

NSN:

Contract type:

Inspection:

Acceptance:

FOB:

LAAFB (RDT&E) (OPTION YEAR 5)

R425

N - Not Applicable

U - COST PLUS FIXED FEE

DESTINATION

DESTINATION

DESTINATION

The Contractor shall provide all labor, office rent, materials, management, supplies, tools, and services required to perform all work required in accordance with Attachment 1, Launch Enterprise Systems Engineering & Integration (ECL/SE&I), Performance-based Work Statement (PWS), as set forth in PWS sections 3.2 Transition of SE&l-2 Effort*, 3.6 Research, Development, Test, and Evaluation (RDT&E), and 3.7 CCAFS, KSC, VAFB Support.

The cost for this CLIN is as follows:

Estimated cost: $ [TO BE FILLED IN BY OFFEROR] Fixed Fee: $[TO BE FILLED IN BY OFFEROR]

The period of performance for this CLIN is 24 Aug 2025 to 23 Aug 2026.

*In the event of following Option is not exercised.

OTHER DIRECT COSTS (TRAVEL ONLY) (OPTION YEAR 5)

R425

N - Not Applicable

S- COST

DESTINATION

DESTINATION

DESTINATION

Descriptive Data:

The Contractor shall provide Other Direct Costs (ODC) in support of Attachment 1, Launch Enterprise Systems Engineering & Integration (ECL/SE&I), Performance-Based Work Statement.

This ODC CLIN shall be used only for travel and per diem necessary to perform the requirements of this contract. No indirect costs shall be applied to this CLIN.

This a cost-reimbursable CLIN with an estimated cost of $500,000. No profit, fee or indirect costs are associated with this CLIN.

The period of performance for this CLIN is 24 Aug 2025 to 23 Aug 2026.

All travel costs shall be in accordance with the Joint Travel Regulations.

PAGE410Flll

ITEM

Qty SUPPLIES OR SERVICES Purch Unit

Unit Price Total Item Amount

OPTION CLIN

Noun:

PSC:

NSN:

Contract type:

Inspection:

Acceptance:

FOB:

Descriptive Data:

CCAFS/45TH SW (O&M FUNDS) (OPTION YEAR 6)

R425

N - Not Applicable

U - COST PLUS FIXED FEE

DESTINATION

DESTINATION

DESTINATION

The Contractor shall provide all labor, office rent, materials, management, supplies, tools, and services required to perform all work required in accordance with Attachment 1, Launch Enterprise Systems Engineering & Integration (ECL/SE&I), Performance-based Work Statement (PWS), as set forth in PWS sections 3.2 Transition of SE&l-2 Effort* and 3.4.2 45TH

Operations Group (45 OG) Requirements.

The cost for this CLIN is as follows:

Estimated cost:$ [TO BE FILLED IN BY OFFEROR] Fixed Fee: $[TO BE FILLED IN BY OFFEROR]

The period of performance for this CLIN is 24 Aug 2026 to 23 Aug 2027.

*In the event of following Option is not exercised.

ITEM

Qty SUPPLIES OR SERVICES Purch Unit

Unit Price Total Item Amount

OPTION CLIN

Noun:

PSC:

NSN:

Contract type:

Inspection:

Acceptance:

FOB:

Descriptive Data:

VAFB/30TH SW (O&M FUNDS) (OPTION YEAR 6)

R425

N - Not Applicable

U - COST PLUS FIXED FEE

DESTINATION

DESTINATION

DESTINATION

The Contractor shall provide all labor, office rent, materials, management, supplies, tools, and services required to perform all work required in accordance with Attachment 1, Launch Enterprise Systems Engineering & Integration (ECL/SE&I), Performance-based Work Statement (PWS), as set forth in PWS sections 3.2 Transition of SE&l-2 Effort* and 3.5.2 30 SW/30 OG Launch Programs Requirement.

The cost for this CLIN is as follows:

Estimated cost:$ [TO BE FILLED IN BY OFFEROR] Fixed Fee: $[TO BE FILLED IN BY OFFEROR]

The period of performance for this CLIN is 24 Aug 2026 to 23 Aug 2027.

*In the event of following Option is not exercised.

ITEM

Qty SUPPLIES OR SERVICES Purch Unit

Unit Price Total Item Amount

OPTION CLIN

Noun:

PSC:

NSN:

Contract type:

Inspection:

Acceptance:

FOB:

Descriptive Data:

OPTION CLIN

Noun:

PSC:

NSN:

Contract type:

Inspection:

Acceptance:

FOB:

LAAFB (RDT&E) (OPTION YEAR 6)

R425

N - Not Applicable

U - COST PLUS FIXED FEE

DESTINATION

DESTINATION

DESTINATION

The Contractor shall provide all labor, office rent, materials, management, supplies, tools, and services required to perform all work required in accordance with Attachment 1, Launch Enterprise Systems Engineering & Integration (ECL/SE&I), Performance-based Work Statement (PWS), as set forth in PWS sections 3.2 Transition of SE&l-2 Effort*, 3.6 Research, Development, Test, and Evaluation (RDT&E), and 3.7 CCAFS, KSC, VAFB Support.

The cost for this CLIN is as follows:

Estimated cost: $ [TO BE FILLED IN BY OFFEROR] Fixed Fee: $[TO BE FILLED IN BY OFFEROR]

The period of performance for this CLIN is 24 Aug 2026 to 23 Aug 2027.

*In the event of following Option is not exercised.

OTHER DIRECT COSTS (TRAVEL ONLY) (OPTION YEAR 6)

R425

N - Not Applicable

S- COST

DESTINATION

DESTINATION

DESTINATION

Descriptive Data:

The Contractor shall provide Other Direct Costs (ODC) in support of Attachment 1, Launch Enterprise Systems Engineering & Integration (ECL/SE&I), Performance-Based Work Statement.

This ODC CLIN shall be used only for travel and per diem necessary to perform the requirements of this contract. No indirect costs shall be applied to this CLIN.

This a cost-reimbursable CLIN with an estimated cost of $500,000. No profit, fee or indirect costs are associated with this CLIN.

The period of performance for this CLIN is 24 Aug 2026 to 23 Aug 2027.

All travel costs shall be in accordance with the Joint Travel Regulations.

ITEM

Qty SUPPLIES OR SERVICES Purch Unit

Unit Price Total Item Amount

OPTION CLIN

Noun:

PSC:

NSN:

Contract type:

Inspection:

Acceptance:

FOB:

Descriptive Data:

CCAFS/45TH SW (O&M FUNDS) (OPTION YEAR 7)

R425

N - Not Applicable

U - COST PLUS FIXED FEE

DESTINATION

DESTINATION

DESTINATION

The Contractor shall provide all labor, office rent, materials, management, supplies, tools, and services required to perform all work required in accordance with Attachment 1, Launch Enterprise Systems Engineering & Integration (ECL/SE&I), Performance-based Work Statement (PWS), as set forth in PWS sections 3.2 Transition of SE&l-2 Effort* and 3.4.2 45TH

Operations Group (45 OG) Requirements.

The cost for this CLIN is as follows:

Estimated cost:$ [TO BE FILLED IN BY OFFEROR] Fixed Fee: $[TO BE FILLED IN BY OFFEROR]

The period of performance for this CLIN is 24 Aug 2027 to 23 Aug 2028.

*In the event of following Option is not exercised.

ITEM

Qty SUPPLIES OR SERVICES Purch Unit

Unit Price Total Item Amount

OPTION CLIN

Noun:

PSC:

NSN:

Contract type:

Inspection:

Acceptance:

FOB:

Descriptive Data:

VAFB/30TH SW (O&M FUNDS) (OPTION YEAR 7)

R425

N - Not Applicable

U - COST PLUS FIXED FEE

DESTINATION

DESTINATION

DESTINATION

The Contractor shall provide all labor, office rent, materials, management, supplies, tools, and services required to perform all work required in accordance with Attachment 1, Launch Enterprise Systems Engineering & Integration (ECL/SE&I), Performance-based Work Statement (PWS), as set forth in PWS sections 3.2 Transition of SE&l-2 Effort* and 3.5.2 30 SW/30 OG Launch Programs Requirement.

The cost for this CLIN is as follows:

Estimated cost:$ [TO BE FILLED IN BY OFFEROR] Fixed Fee: $[TO BE FILLED IN BY OFFEROR]

The period of performance for this CLIN is 24 Aug 2027 to 23 Aug 2028.

*In the event of following Option is not exercised.

ITEM

Qty SUPPLIES OR SERVICES Purch Unit

Unit Price Total Item Amount

OPTION CLIN

Noun:

PSC:

NSN:

Contract type:

Inspection:

Acceptance:

FOB:

Descriptive Data:

OPTION CLIN

Noun:

PSC:

NSN:

Contract type:

Inspection:

Acceptance:

FOB:

LAAFB (RDT&E) (OPTION YEAR 7)

R425

N - Not Applicable

U - COST PLUS FIXED FEE

DESTINATION

DESTINATION

DESTINATION

The Contractor shall provide all labor, office rent, materials, management, supplies, tools, and services required to perform all work required in accordance with Attachment 1, Launch Enterprise Systems Engineering & Integration (ECL/SE&I), Performance-based Work Statement (PWS), as set forth in PWS sections 3.2 Transition of SE&l-2 Effort*, 3.6 Research, Development, Test, and Evaluation (RDT&E), and 3.7 CCAFS, KSC, VAFB Support.

The cost for this CLIN is as follows:

Estimated cost: $ [TO BE FILLED IN BY OFFEROR] Fixed Fee: $[TO BE FILLED IN BY OFFEROR]

The period of performance for this CLIN is 24 Aug 2027 to 23 Aug 2028.

*In the event of following Option is not exercised.

OTHER DIRECT COSTS (TRAVEL ONLY) (OPTION YEAR 7)

R425

N - Not Applicable

S- COST

DESTINATION

DESTINATION

DESTINATION

Descriptive Data:

The Contractor shall provide Other Direct Costs (ODC) in support of Attachment 1, Launch Enterprise Systems Engineering & Integration (ECL/SE&I), Performance-Based Work Statement.

This ODC CLIN shall be used only for travel and per diem necessary to perform the requirements of this contract. No indirect costs shall be applied to this CLIN.

This a cost-reimbursable CLIN with an estimated cost of $500,000. No profit, fee or indirect costs are associated with this CLIN.

The period of performance for this CLIN is 24 Aug 2027 to 23 Aug 2028.

All travel costs shall be in accordance with the Joint Travel Regulations.

ITEM

Qty SUPPLIES OR SERVICES Purch Unit

Unit Price Total Item Amount

OPTION CLIN

Noun:

PSC:

NSN:

Contract type:

Inspection:

Acceptance:

FOB:

Descriptive Data:

CCAFS/45TH SW (O&M FUNDS) (OPTION YEAR 8)

R425

N - Not Applicable

U - COST PLUS FIXED FEE

DESTINATION

DESTINATION

DESTINATION

The Contractor shall provide all labor, office rent, materials, management, supplies, tools, and services required to perform all work required in accordance with Attachment 1, Launch Enterprise Systems Engineering & Integration (ECL/SE&I), Performance-based Work Statement (PWS), as set forth in PWS sections 3.2 Transition of SE&l-2 Effort* and 3.4.2 45TH

Operations Group (45 OG) Requirements.

The cost for this CLIN is as follows:

Estimated cost:$ [TO BE FILLED IN BY OFFEROR] Fixed Fee: $[TO BE

FILLED IN BY

OFFEROR]

The period of performance for this CLIN is 24 Aug 2028 to 23 Aug 2029.

*In the event of following Option is not exercised.

ITEM

Qty SUPPLIES OR SERVICES Purch Unit

Unit Price Total Item Amount

OPTION CLIN

Noun:

PSC:

NSN:

Contract type:

Inspection:

Acceptance:

FOB:

Descriptive Data:

VAFB/30TH SW (O&M FUNDS) (OPTION YEAR 8)

R425

N - Not Applicable

U - COST PLUS FIXED FEE

DESTINATION

DESTINATION

DESTINATION

The Contractor shall provide all labor, office rent, materials, management, supplies, tools, and services required to perform all work required in accordance with Attachment 1, Launch Enterprise Systems Engineering & Integration (ECL/SE&I), Performance-based Work Statement (PWS), as set forth in PWS sections 3.2 Transition of SE&l-2 Effort* and 3.5.2 30 SW/30 OG Launch Programs Requirement.

The cost for this CLIN is as follows:

Estimated cost:$ [TO BE FILLED IN BY OFFEROR] Fixed Fee: $[TO BE

FILLED IN BY

OFFEROR]

The period of performance for this CLIN is 24 Aug 2028 to 23 Aug 2029.

*In the event of following Option is not exercised.

PAGE610Flll

ITEM

Qty SUPPLIES OR SERVICES Purch Unit

Unit Price Total Item Amount

OPTION CLIN

Noun:

PSC:

NSN:

Contract type:

Inspection:

Acceptance:

FOB:

Descriptive Data:

OPTION CLIN

Noun:

PSC:

NSN:

Contract type:

Inspection:

Acceptance:

FOB:

LAAFB (RDT&E) (OPTION YEAR 8)

R425

N - Not Applicable

U - COST PLUS FIXED FEE

DESTINATION

DESTINATION

DESTINATION

The Contractor shall provide all labor, office rent, materials, management, supplies, tools, and services required to perform all work required in accordance with Attachment 1, Launch Enterprise Systems Engineering & Integration (ECL/SE&I), Performance-based Work Statement (PWS), as set forth in PWS sections 3.2 Transition of SE&l-2 Effort*, 3.6 Research, Development, Test, and Evaluation (RDT&E), and 3.7 CCAFS, KSC, VAFB Support.

The cost for this CLIN is as follows:

Estimated cost: $ [TO BE FILLED IN BY OFFEROR] Fixed Fee: $[TO BE FILLED IN BY OFFEROR]

The period of performance for this CLIN is 24 Aug 2028 to 23 Aug 2029.

*In the event of following Option is not exercised.

OTHER DIRECT COSTS (TRAVEL ONLY) (OPTION YEAR 8)

R425

N - Not Applicable

S- COST

DESTINATION

DESTINATION

DESTINATION

Descriptive Data:

The Contractor shall provide Other Direct Costs (ODC) in support of Attachment 1, Launch Enterprise Systems Engineering & Integration (ECL/SE&I), Performance-Based Work Statement.

This ODC CLIN shall be used only for travel and per diem necessary to perform the requirements of this contract. No indirect costs shall be applied to this CLIN.

This a cost-reimbursable CLIN with an estimated cost of $500,000. No profit, fee or indirect costs are associated with this CLIN.

The period of performance for this CLIN is 24 Aug 2028 to 23 Aug 2029.

All travel costs shall be in accordance with the Joint Travel Regulations.

ITEM

Qty SUPPLIES OR SERVICES Purch Unit

Unit Price Total Item Amount

OPTION CLIN

Noun:

PSC:

NSN:

Contract type:

Inspection:

Acceptance:

FOB:

Descriptive Data:

CCAFS/45TH SW (O&M FUNDS) (OPTION YEAR 9)

R425

N - Not Applicable

U - COST PLUS FIXED FEE

DESTINATION

DESTINATION

DESTINATION

The Contractor shall provide all labor, office rent, materials, management, supplies, tools, and services required to perform all work required in accordance with Attachment 1, Launch Enterprise Systems Engineering & Integration (ECL/SE&I), Performance-based Work Statement (PWS), as set forth in PWS sections 3.2 Transition of SE&l-2 Effort* and 3.4.2 45TH

Operations Group (45 OG) Requirements.

The cost for this CLIN is as follows:

Estimated cost:$ [TO BE FILLED IN BY OFFEROR] Fixed Fee: $[TO BE

FILLED IN BY

OFFEROR]

The period of performance for this CLIN is 24 Aug 2029 to 23 Aug 2030.

*In the event of following Option is not exercised.

ITEM

Qty SUPPLIES OR SERVICES Purch Unit

Unit Price Total Item Amount

OPTION CLIN

Noun:

PSC:

NSN:

Contract type:

Inspection:

Acceptance:

FOB:

Descriptive Data:

VAFB/30TH SW (O&M FUNDS) (OPTION YEAR 9)

R425

N - Not Applicable

U - COST PLUS FIXED FEE

DESTINATION

DESTINATION

DESTINATION

The Contractor shall provide all labor, office rent, materials, management, supplies, tools, and services required to perform all work required in accordance with Attachment 1, Launch Enterprise Systems Engineering & Integration (ECL/SE&I), Performance-based Work Statement (PWS), as set forth in PWS sections 3.2 Transition of SE&l-2 Effort* and 3.5.2 30 SW/30 OG Launch Programs Requirement.

The cost for this CLIN is as follows:

Estimated cost:$ [TO BE FILLED IN BY OFFEROR] Fixed Fee: $[TO BE

FILLED IN BY

OFFEROR]

The period of performance for this CLIN is 24 Aug 2029 to 23 Aug 2030.

*In the event of following Option is not exercised.

ITEM

Qty SUPPLIES OR SERVICES Purch Unit

Unit Price Total Item Amount

OPTION CLIN

Noun:

PSC:

NSN:

Contract type:

Inspection:

Acceptance:

FOB:

Descriptive Data:

OPTION CLIN

Noun:

PSC:

NSN:

Contract type:

Inspection:

Acceptance:

FOB:

LAAFB (RDT&E) (OPTION YEAR 9)

R425

N - Not Applicable

U - COST PLUS FIXED FEE

DESTINATION

DESTINATION

DESTINATION

The Contractor shall provide all labor, office rent, materials, management, supplies, tools, and services required to perform all work required in accordance with Attachment 1, Launch Enterprise Systems Engineering & Integration (ECL/SE&I), Performance-based Work Statement (PWS), as set forth in PWS sections 3.2 Transition of SE&l-2 Effort*, 3.6 Research, Development, Test, and Evaluation (RDT&E), and 3.7 CCAFS, KSC, VAFB Support.

The cost for this CLIN is as follows:

Estimated cost: $ [TO BE FILLED IN BY OFFEROR] Fixed Fee: $[TO BE FILLED IN BY OFFEROR]

The period of performance for this CLIN is 24 Aug 2029 to 23 Aug 2030.

*In the event of following Option is not exercised.

OTHER DIRECT COSTS (TRAVEL ONLY) (OPTION YEAR 9)

R425

N - Not Applicable

S- COST

SOURCE

SOURCE

SOURCE

Descriptive Data:

The Contractor shall provide Other Direct Costs (ODC) in support of Attachment 1, Launch Enterprise Systems Engineering & Integration (ECL/SE&I), Performance-Based Work Statement.

This ODC CLIN shall be used only for travel and per diem necessary to perform the requirements of this contract. No indirect costs shall be applied to this CLIN.

This a cost-reimbursable CLIN with an estimated cost of $500,000. No profit, fee or indirect costs are associated with this CLIN.

The period of performance for this CLIN is 24 Aug 2029 to 23 Aug 2030.

All travel costs shall be in accordance with the Joint Travel Regulations.

ITEM

Qty SUPPLIES OR SERVICES Purch Unit

Unit Price Total Item Amount

OPTION CLIN

Noun:

PSC:

NSN:

Contract type:

Inspection:

Acceptance:

FOB:

Descriptive Data:

CCAFS/45TH SW (O&M FUNDS) (OPTION TO EXTEND

SERVICES)

R425

N - Not Applicable

U - COST PLUS FIXED FEE

DESTINATION

DESTINATION

DESTINATION

The Contractor shall provide all labor, office rent, materials, management, supplies, tools, and services required to perform all work required in accordance with Attachment 1, Launch Enterprise Systems Engineering & Integration (ECL/SE&I), Performance-based Work Statement (PWS), as set forth in PWS sections 3.2 Transition of SE&l-2 Effort and 3.4.2 45TH

Operations Group (45 OG) Requirements.

In accordance with 52.217-8:

The cost for this CLIN for the full six months is as follows:

Estimated cost:$ [TO BE FILLED IN BY OFFEROR] Fixed Fee: $[TO BE FILLED IN BY

OFFEROR]

The monthly cost for this CLIN is as follows:

Estimated cost: $ [TO BE FILLED IN BY OFFEROR] Fixed Fee: $[TO BE

FILLED IN BY

OFFEROR]

The period of performance can be exercised at any time during the life of the contract and can be exercised in increments of one to six months, but for no more than a total of six months during the life of the contract.

ITEM

Qty SUPPLIES OR SERVICES Purch Unit

Unit Price Total Item Amount

OPTION CLIN

Noun:

PSC:

NSN:

Contract type:

Inspection:

Acceptance:

FOB:

Descriptive Data:

VAFB/30TH SW (O&M FUNDS) (OPTION TO EXTEND

SERVICES)

R425

N - Not Applicable

U - COST PLUS FIXED FEE

DESTINATION

DESTINATION

DESTINATION

The Contractor shall provide all labor, office rent, materials, management, supplies, tools, and services required to perform all work required in accordance with Attachment 1, Launch Enterprise Systems Engineering & Integration (ECL/SE&I), Performance-based Work Statement (PWS), as set forth in PWS sections 3.2 Transition of SE&l-2 Effort and 3.5.2 30 SW/30 OG Launch Programs Requirement.

In accordance with 52.217-8:

The cost for this CLIN for the full six months is as follows:

Estimated cost:$ [TO BE FILLED IN BY OFFEROR] Fixed Fee: $[TO BE FILLED IN BY

OFFEROR]

The monthly cost for this CLIN is as follows:

Estimated cost:$ [TO BE FILLED IN BY OFFEROR] Fixed Fee: $[TO BE

FILLED IN BY

OFFEROR]

The period of performance can be exercised at any time during the life of the contract and can be exercised in increments of one to six months, but for no more than a total of six months during the life of the contract.

ITEM

Qty SUPPLIES OR SERVICES Purch Unit

Unit Price Total Item Amount

OPTION CLIN

Noun:

PSC:

NSN:

Contract type:

Inspection:

Acceptance:

FOB:

Descriptive Data:

LAAFB (RDT&E) (OPTION TO EXTEND SERVICES)

R425

N - Not Applicable

U - COST PLUS FIXED FEE

DESTINATION

DESTINATION

DESTINATION

The Contractor shall provide all labor, office rent, materials, management, supplies, tools, and services required to perform all work required in accordance with Attachment 1, Launch Enterprise Systems Engineering & Integration (ECL/SE&I), Performance-based Work Statement (PWS), as set forth in PWS sections 3.2 Transition of SE&l-2 Effort, 3.6 Research, Development, Test, and Evaluation (RDT&E), and 3.7 CCAFS, KSC, VAFB Support.

In accordance with 52.217-8:

The cost for this CLIN for the full six months is as follows:

Estimated cost: $ [TO BE FILLED IN BY OFFEROR] Fixed Fee: $[TO BE FILLED IN BY

OFFEROR]

The monthly cost for this CLIN is as follows:

Estimated cost: $ [TO BE FILLED IN BY OFFEROR] Fixed Fee: $[TO BE

FILLED IN BY

OFFEROR]

The period of performance can be exercised at any time during the life of the contract and can be exercised in increments of one to six months, but for no more than a total of six months during the life of the contract.

PART II - CONTRACT CLAUSES

SECTION I - CONTRACT CLAUSES

"Proprietary Information" means all information designated as proprietary in accordance with law and regulation, and held in confidence or disclosed under restriction to prevent uncontrolled distribution.

Examples include limited or restricted data, trade secrets, sensitive financial information, and computer software; and may appear in cost and pricing data or involve classified information.

"System" means the system that is the subject of this contract.

"System Life" means all phases of the system's development, production, or support.

"Systems Engineering" means preparing specifications, identifying and resolving interface problems, developing test requirements, evaluating test data, and supervising design.

"Technical Direction" means developing work statements, determining parameters, directing other

Contractors' operations, or resolving technical controversies.

(2) Restrictions: The Contractor shall perform systems engineering and/or technical direction, but will not have overall contractual responsibility for the system's development, integration, assembly and checkout, or production. The parties recognize that the Contractor shall occupy a highly influential and responsible position in determining the system's basic concepts and supervising their execution by other Contractors. The Contractor's judgment and recommendations must be objective, impartial, and independent. To avoid the prospect of the Contractor's judgment or recommendations being influenced by its own products or capabilities, it is agreed that the Contractor is precluded for the life of the system from award of a DoD contract to supply the system or any of its major components, and from acting as a subcontractor or consultant to a DoD supplier for the system or any of its major components.

Alternate I (Oct 2010). As prescribed in 5309.507-2(a)(2), either substitute paragraph (a)(2) of the basic clause with one or both of the following paragraphs, or use one or both in addition to the basic paragraphs substantially as written.

(i) The Contractor shall prepare and submit complete specifications for nondevelopmental items to be used in a competitive acquisition. The Contractor shall not furnish these items to the DoD, either as a prime or subcontractor, for the duration of the initial production contract plus the life of this contract plus 10 years.

(ii) The Contractor shall either prepare or assist in preparing a work statement for use in competitively acquiring the launch services for SMC, or provide material leading directly, predictably, and without delay to such a work statement. The Contractor may not supply assistance to launch service providers for a period of the life of this contract plus 10 years, as either the prime or subcontractor unless it becomes the sole source, has participated in the design or development work, or more than one contractor has participated in preparing the work statement.

5352.209-9000 ORGANIZATIONAL CONFLICT OF INTEREST (OCT 2010) -ALTERNATE II (OCT

2010) (TAILORED)

(a) The following restrictions and definitions apply to prevent conflicting roles which may bias the

Contractor's judgment or objectivity, or to preclude the Contractor from obtaining an unfair competitive advantage in concurrent or future acquisitions.

(1) Descriptions or definitions:

"Contractor"…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .