24Jan20_02_Amendment 0002 CRM.pdf

PDF 112 KB Posted

Attached to
Systems Engineering & Integration-2 (SE&I-2) FINAL Request for Proposal (RFP) Federal contract opportunity
Solicitation number
FA8811-20-R-0003
Issued by
Department of the Air Force Space Command Space and Missile Systems Center

About this file

This document contains an amendment to a Systems Engineering and Integration (SE&I) Request for Proposal (RFP) as well as comments and responses to the amendment. The amendment makes changes to labor category requirements for Project Integration Manager II, Software Engineer II, and Training Specialist III labor categories to clarify experience and education qualifications. It also extends the proposal due date from February 5th to February 10th, 2020 in response to late changes in Amendment 0001 affecting proposed staffing, costs, and prices. The related federal contract opportunity posting provides additional context, soliciting proposals under solicitation number FA8811-20-R-0003 for continued SE&I services in support of the Space and Missile Systems Center/Launch Enterprise at Los Angeles Air Force Base. Interested parties were encouraged to respond by November 8, 2019.

View the file

Other files for this federal contract opportunity

Other files attached to Systems Engineering & Integration-2 (SE&I-2) FINAL Request for Proposal (RFP), newest first.
File Type Posted
24Jan20_Conformed_02_Performance-Based_Work_Statement.pdf PDF
24Jan20_Conformed_05_L-5_PP_Questionnaire.pdf PDF
24Jan20_TrackedChanges_07_Section M Evaluation Criteria.pdf PDF
13Jan20_Conformed_03__Instructions_to_Offerors.pdf PDF
13Jan20_TrackedChanges_02_PWS.pdf PDF
13Jan20_TrackedChanges_08_L-7 PP_Client_Authorization.docx DOCX document
13Jan20_Conformed_05_L-3_Staffing_Govt_Estimate.xlsx XLSX spreadsheet
13Jan20_Conformed_01_FA8811-20-R-0003.pdf PDF
13Jan20_Conformed_06_L-4 PP_Information.docx DOCX document
13Jan20_TrackedChanges_04_L-1_SB_Percentage_Calculation.xlsx XLSX spreadsheet
12Dec2019_20_L-7 PP Client Authorization.docx DOCX document
12Dec2019_11_Staffing Plan.pdf PDF
12Dec2019_14_L-1_Small_Business_Percentage.xlsx XLSX spreadsheet
12Dec2019_09_30th OG Base Support.pdf PDF
12Dec2019_23_Section M Evaluation Criteria.pdf PDF
12Dec2019_04_SB Subcontracting Plan.pdf PDF
12Dec2019_03_Performance-Based_Work_Statement.pdf PDF
12Dec2019_21_L-8 OCI_Mitigation_Plan_Checklist.pdf PDF
12Dec2019_12_Data Rights Assertions.pdf PDF
12Dec2019_01_Model Contract.pdf PDF
12Dec2019_08_OCI Mitigation Plan.pdf PDF
12Dec2019_15_L-2 Contractor Staffing Plan and Matrix.xlsx XLSX spreadsheet
12Dec2019_07_Performance_Incentive_Plan.pdf PDF
12Dec2019_02_ExhibitA_CDRLs.pdf PDF
12Dec2019_13_Section L Instructions to Offerors.pdf PDF
6 Dec 2019_L-4_Past_Performance_Information_for Offerors.docx DOCX document
6 Dec 2019_Performance-Based_Work_Statement.docx DOCX document
6 Dec 2019_L-5 Past Performance Questionnaire.docx DOCX document
26Nov2019_Time Phased Person Loading Graph Sample.pdf PDF
26Nov2019_Consolidated_Industry_Day_Comments.pdf PDF
22Nov2019_Section_M_Evaluation_Criteria.docx DOCX document
08_Staffing_Plan_-_Reserved.docx DOCX document
13_Section_M_Evaluation_Criteria.docx DOCX document
04_Objective_Performance_Incentive_Plan.docx DOCX document
12f__L-6_Subcontract__Teaming_Partner_Consent_Letter.docx DOCX document
12h_L-8_OCI_Mitigation_Plan_Checklist.pdf PDF
09_Data_Rights_Assertions_-_Reserved.docx DOCX document
11_Small_Business_Participation_Commitment_Document.pdf PDF
12e_L-5_Past_Performance_Questionnaire.docx DOCX document
___SE&I-2_DRAFT_RFP_CRM.xlsx XLSX spreadsheet
12b_L-2_Contractor_Staffing_Plan_and_Matrix.xlsx XLSX spreadsheet
12d_L-4_Past_Performance_Information_for_Offerors.docx DOCX document
07_45th_OG_Base_Support.docx DOCX document
06_30th_OG_Base_Support.docx DOCX document
03_DD_Form_254_Contract_Security.pdf PDF
12_Section_L_Instructions_to_Offerors.docx DOCX document
_ExhibitA_CDRLs.pdf PDF
01_Performance-Based_Work_Statement.docx DOCX document
05_OCI_Mitigation_Plan_-_Reserved.docx DOCX document
__Model_Contract_FA8811-20-R-0003.pdf PDF
Show all 50

Systems Engineering & Integration-2 (SE&I-2) FINAL Request for Proposal (RFP) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Comment# Document Name, Page #, and Paragraph #

Critical, Substantive, Admin

Comment Rationale A = Accepts R = Rejects

M = Modification PO Response

1 Amendment 0001

CRM

Critical In regards to the line item 49 in the CRM dated 13 Jan 2020:

PO Response: The Government has updated the ITO to indicate that all proposal documents shall be at a minimum of 11 point font. This translated into an update in Section L Section 2.2.7 Page Size and Format that reads “Text in tables, charts, graphs and figures shall be no smaller than 11 8 point font Arial or Times New Roman.”

This is a large change that will affect all bidders and every document that has been constructed with a consistent instruction since the DRFP of 8pt font being acceptable for text in tables, charts, graphs and figures.

Suggest the government reconsider the font size for text in tables, charts, graphs and figures to be no smaller than 8 point font Arial or Times New Roman per the instructions throughout the DRFP and FRFP. The government then could add an additional instructions on font size for Excel spreadsheets, or add the term Excel Spreadsheet into the instructions with the requested no smaller than 8pt font limit.

A ITO Paragraph 2.2.7 text will be changed within Amendment 2

From:

"Legible tables, Excel data files, charts, graphs and figures shall be used wherever practical to depict organizations, systems and layout, implementation schedules, plans, etc. These displays shall be uncomplicated, legible and shall not exceed 11 x 17 inches in size. Foldout pages shall fold entirely within the volume, count as a single page, and are counted as part of the total page count. Foldout pages (11 x 17) are to be used to display information more clearly than would otherwise be possible on an 8.5 x 11 inch page. Foldout pages (11x17) may only be used for large tables, charts, graphs, diagrams and schematics, not for pages of text. Text in tables, charts, graphs and figures shall be no smaller than 11 point font Arial or Times New Roman. These limitations shall also apply to all electronic copy proposals."

To:

“Legible tables, Excel data files, charts, graphs and figures shall be used wherever practical to depict organizations, systems and layout, implementation schedules, plans, etc. These displays shall be uncomplicated, legible and shall not exceed 11 x 17 inches in size. Foldout pages shall fold entirely within the volume, count as a single page, and are counted as part of the total page count. Foldout pages (11 x 17) are to be used to display information more clearly than would otherwise be possible on an 8.5 x 11 inch page. Foldout pages (11x17) may only be used for large tables, charts, graphs, diagrams and schematics, not for pages of text. Text in tables, charts, graphs and figures shall be no smaller than 8 point font Arial or Times New Roman. These limitations shall also apply to all electronic copy proposals. Lastly, the Contractor proposed staffing matrix (L-2) shall be no smaller than 11 point font Arial or Times New Roman.”

2 Past Performance Questionnaire

Critical The Past Performance Questionnaire document sent as part of the 13 Jan 2020 Amendment “13Jan20_TrackedChanges_07_L-5_PP_Questionnaire” is the DRAFT RFP Past Performance Questionnaire with track changes not the FINAL RFP Past Performance Questionnaire with Track changes. Please clarify which Past Performance Questionnaire Document the government is correcting.

Final RFP Questionnaires were provided to SAIC’s customers last week in order to meet the proposal due date.

N/A Changes to the correct version and posted with Amendment 2

Amendment 0001 Substantive Amendment 0001 changes the Project Integration Manager II Minimum Experience Required from 8 years to 5 years.

PWS Appendix E - Labor Category Requirements shows the Minimum Experience Required for a Project Integration Manager I is also 5 years. Can the customer please explain this discrepancy?

Clarification of labor category requirements. M Acknowledged that Product Integration Manager (PIM) II requirements in VAFB is different from other locations, a new Labor Category "Product Integration Manager (VAFB) will be added to the RFP

Amendment 0001 Substantive Amendment 0001 changes the Software Engineer II Minimum Experience Required from 8 years to 2 years.

PWS Appendix E - Labor Category Requirements shows the Minimum Experience Required for a Software Engineer I is 5 years (3 years greater than the requirement for the Software Engineer II). Can the customer please explain this discrepancy?

Clarification of labor category requirements. M Acknowledged that Software Engineer II requirements in VAFB is different from other locations, a new Labor Category "Software Engineer (VAFB) will be added to the RFP

Amendment 0001 Substantive Amendment 0001 changes the Training Specialist III - Range Minimum Education Required from Bachelor's Degree to High School Diploma. PWS Appendix E - Labor Category Requirements shows the Minimum Education Required for a Training Specialist III is a Bachelor's Degree. Can the customer please explain the difference in education requirements between the Training Specialist III and the Training Specialist III - Range labor categories when the experience requirements and job description is the same for both?

Clarification of labor category requirements. R The Government reviewed the referenced labor categories in Appendix E of the PWS (page 178) and found no discrepancies. Training Specialist III - Range has different performance requirements level compared to Training Specialist III

Amendment 0001 Critical In consideration of the late changes recently released in Amendment 001, would the Government consider a 5 working day extension of the proposal due date to Feb 5, 2020? The late changes affect personnel qualification requirements, labor staffing profiles, manpower allocations to team members and proposed cost/price.

N/A The Government will extend the proposal due date to NLT 1200 Hours (PST) on 10 Feb 2020, CRM

File details come from the government source that posted it. Updated .