12Dec2019_23_Section M Evaluation Criteria.pdf

PDF 320 KB Posted

Attached to
Systems Engineering & Integration-2 (SE&I-2) FINAL Request for Proposal (RFP) Federal contract opportunity
Solicitation number
FA8811-20-R-0003
Issued by
Department of the Air Force Space Command Space and Missile Systems Center

About this file

This document is a draft request for proposals (RFP) for continued Systems Engineering & Integration services. The RFP solicits proposals to provide services including staffing, launch expertise, risk identification and mitigation, launch enterprise processes and products, government and launch service provider integration, and quality and risk assessment. Interested offerors are invited to provide feedback on the draft RFP by 8 November 2019. An industry day with one-on-one meetings will be held from 23-25 October 2019 for interested parties to schedule time to discuss the opportunity. The Space and Missile Systems Center/Launch Enterprise at Los Angeles Air Force Base is the issuing agency. The North American Industry Classification System code is 541715 and the small business size standard is 1250 employees.

View the file

Other files for this federal contract opportunity

Other files attached to Systems Engineering & Integration-2 (SE&I-2) FINAL Request for Proposal (RFP), newest first.
File Type Posted
24Jan20_Conformed_03_Section L Instructions to Offerors.pdf PDF
24Jan20_Conformed_06_Section M Evaluation Criteria.pdf PDF
24Jan20_Conformed_04 _L-3_Staffing_Govt_Estimate.xlsx XLSX spreadsheet
24Jan20_Conformed_01_FA8811-20-R-0003.pdf PDF
24Jan20_TrackedChanges_06_L-5_PP_Questionnaire.pdf PDF
24Jan20_Tracked Changes_03_PWS.pdf PDF
24Jan20_Tracked Changes_04_Section L Instructions to Offerors.pdf PDF
24Jan20_02_Amendment 0002 CRM.pdf PDF
24Jan20_01_FA8811-20-R-0003-A0002.pdf PDF
24Jan20_Tracked Changes_05 _L-3_Staffing_Govt_Estimate.xlsx XLSX spreadsheet
13Jan20_TrackedChanges_05 _L-3_Staffing_Govt_Estimate.xlsx XLSX spreadsheet
13Jan20_TrackedChanges_06_L-4_PP_Information.docx DOCX document
13Jan20_TrackedChanges_03_Instructions_to_Offerors.pdf PDF
13Jan2020_09_FA8811-20-R-0003_SEI-2_CRM.pdf PDF
13Jan20_Conformed_04_L-1_SB_Percentage_Calculation.xlsx XLSX spreadsheet
13Jan20_01_FA8811-20-R-0003-A0001.pdf PDF
13Jan20_TrackedChanges_07_L-5_PP_Questionnaire.docx DOCX document
13Jan20_Conformed_07_L-5_PP_Questionnaire.docx DOCX document
13Jan20_Conformed_08_L-7_PP_Client_Authorization.docx DOCX document
13Jan20_Conformed_02_PWS.pdf PDF
12Dec2019_17_L-4 Past Performance Information.docx DOCX document
12Dec2019_10_45th OG Base Support.pdf PDF
12Dec2019_06_DD-254.pdf PDF
12Dec2019_22_L-9 Data Rights.pdf PDF
12Dec2019_18_L-5 Past Performance Questionnaire.docx DOCX document
12Dec2019_02_ExhibitA_CDRLs.pdf PDF
12Dec2019_13_Section L Instructions to Offerors.pdf PDF
12Dec2019_05_SBPCD.pdf PDF
12Dec2019_16_L-3_Staffing_Govt_Estimate.xlsx XLSX spreadsheet
12Dec2019 Consolidated CRM.pdf PDF
12Dec2019_19_L-6 Subcontract_ Teaming Partner Consent.docx DOCX document
6 Dec 2019_L-3_Staffing_Govt_Estimate_Final.xlsx XLSX spreadsheet
6 Dec 2019_Section L Instructions to Offerors.docx DOCX document
6 Dec 2019_Objective Performance_Incentive_Plan.docx DOCX document
6 Dec 2019_L-5 Past Performance Questionnaire.docx DOCX document
26Nov2019_Consolidated_Industry_Day_Comments.pdf PDF
22 Nov2019_PWS Appendix E Labor Category Description.docx DOCX document
22Nov2019_Objective_Performance_Incentive_Plan.docx DOCX document
02_Small_Business_Subcontracting_Plan_-_Reserved.docx DOCX document
12g_L-7_PP_Client_Authorization.docx DOCX document
12a_L-1_Labor_Category_Description.docx DOCX document
12c_L-3_Staffing_Govt_Estimate_Final.xlsx XLSX spreadsheet
12i_L-9_Data_Rights.docx DOCX document
_ExhibitA_CDRLs.pdf PDF
01_Performance-Based_Work_Statement.docx DOCX document
05_OCI_Mitigation_Plan_-_Reserved.docx DOCX document
__Model_Contract_FA8811-20-R-0003.pdf PDF
12b_L-2_Contractor_Staffing_Plan_and_Matrix.xlsx XLSX spreadsheet
12d_L-4_Past_Performance_Information_for_Offerors.docx DOCX document
07_45th_OG_Base_Support.docx DOCX document
Show all 50

Systems Engineering & Integration-2 (SE&I-2) FINAL Request for Proposal (RFP) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 | P a g e

ATTACHMENT 13 5

SPACE AND MISSILE SYSTEMS CENTER/ LAUNCH 7

ENTERPRISE (SMC/ECL) 8

SYSTEMS ENGINEERING & INTEGRATION-2 (SE&I-2) 9

EVALUATION CRITERIA (EC) 10

FA8811-20-R-0003 13

12 December 2019 16

Department of the Air Force 20

Space and Missile Systems Center 21

Launch Enterprise 22

Los Angeles AFB, California 90245-2808 23

2 | P a g e

Revision History 25

Revision Description Date

1.0 Draft RFP Release 10 October 2019

1.1 2nd Draft RFP Release 22 November 2019

2.0 Final RFP Release 12 December 2019

3 | P a g e

Table of Contents 30 M001 SOURCE SELECTION ................................................................................................. 4 32

1.1 Basis for Contract Award ................................................................................................. 4 33

1.2 Competitive Range ........................................................................................................... 4 34

1.3 Discussions ....................................................................................................................... 5 35

1.4 Correction Potential of Proposals ..................................................................................... 5 36

1.5 Rejection of Unrealistic or Unreasonable Offers ............................................................. 5 37

1.6 Responsibility ................................................................................................................... 5 38

1.6.1 Organizational Conflict of Interest (OCI) ................................................................. 5 39

1.6.2 Professional Employee Compensation Plan ............................................................. 6 40

1.6.3 Pre-Award Survey .......................................................................................................... 6 41

M002 EVALUATION FACTORS ........................................................................................... 6 42

2.1 Evaluation Factors and Subfactors...................................................................................... 6 43

2.2 Relative Importance ......................................................................................................... 8 44

2.3 Factor 1: Technical ........................................................................................................... 8 45

2.3.1 Technical/Risk Rating Evaluation ............................................................................ 8 46

2.3.2 Technical Subfactor 1.1 – Staffing Approach........................................................ 10 47

2.3.3 Technical Subfactor 1.2 – Launch Expertise .......................................................... 10 48

2.4 Factor 2: Past Performance ............................................................................................ 12 49

2.5 Factor 3: Cost/Price ........................................................................................................ 16 50

2.5.1 Price Evaluation. .......................................................................................................... 16 51

2.5.2 Total Evaluated Price ................................................................................................... 16 52

2.5.2.1 Fixed Fee and Performance Incentive....................................................................... 20 53

2.5.3 Evaluation Area Details ............................................................................................... 20 54

2.5.3.1 Reasonableness ..................................................................................................... 20 55

2.5.3.2 Realism ................................................................................................................. 21 56

2.5.3.3 Unbalanced Pricing (Applies to all contract line items) ....................................... 21 57

2.5.3.6 Total Proposed Price (TPP) .................................................................................. 21 58

2.5.3.5 Total Evaluated Price (TEP) ................................................................................. 21 59

2.5.3.6 ......................................................................................................................... 22 60

2.5.3.7 ......................................................................................................................... 22 61

2.5 Factor 4: Small Business Participation........................................................................... 22 62

4 | P a g e

M001 SOURCE SELECTION 64

1.1 Basis for Contract Award 66

This is a best value full tradeoff source selection conducted in accordance with (IAW) Federal Acquisition 68 Regulation (FAR) subpart 15.3, Source Selection, and FAR 15.101-1, Tradeoff Process, as supplemented 69 by the Defense Federal Acquisition Regulation Supplement (DFARS) subpart 215.3, the DoD Source 70 Selection Procedures (March 31, 2016), the Air Force FAR Supplement (AFFARS) subpart 5315.3, and 71 the Air Force Mandatory Procedures 5315.3. These regulations are available electronically. 72 The Government intends to make a single award by selecting the Offeror, who is determined to be 74 responsible in accordance with FAR 9.1, Responsible Prospective Contractors, and its supplements , 75 whose proposal conforms to the solicitation’s requirements (to include all stated terms, conditions, 76 representations, certifications, and all other information required by Section L of this solicitation) and is 77 evaluated, based on the evaluation Factors and Subfactors, to represent the best value to the Government. 78 The Source Selection Authority (SSA) will base the source selection decision on a detailed assessment of 79 proposals against all source selection criteria. 80 This may result in an award to a higher rated, higher priced Offeror, where the decision is consistent with 82 the evaluation Factors, and the SSA reasonably determines that the technical approach/technical risk of 83 the higher price offer outweighs the cost/price difference. 84 While the Government source selection evaluation team and the SSA will strive for maximum objectivity, 86 the source selection process, by its nature, is subjective; therefore, professional judgment is implicit 87 throughout the entire process. 88

1.2 Competitive Range 90

The Government intends to evaluate proposals and award a contract without discussions with Offerors 92 (except clarifications as described in FAR 15.306(a)). Therefore, the Offeror’s initial proposal should 93 contain the Offeror’s best terms from a cost or price and technical standpoint. 94 The Government reserves the right to conduct discussions if the Contracting Officer later determines them 96 to be necessary at any point during the source selection. Any discussions will be conducted in accordance 97 with FAR 15.306. 98 If the Contracting Officer determines that the number of proposals that would otherwise be in the 100 competitive range exceeds the number at which an efficient competition can be conducted, the Contracting 101 Officer may limit the number of proposals in the competitive range to the greatest number that will permit 102 an efficient competition among the most highly rated proposals. 103 Competitive range determinations may occur more than once. Offerors excluded from the competitive 105 range may request a debriefing IAW FAR 15.505. 106

5 | P a g e

1.3 Discussions 110

The Government may enter into discussions after it makes a competitive range determination of the most 112 highly rated proposals based on the rating of each proposal against all evaluation criteria (see FAR 113 15.306(c)). If, during the evaluation period, it is determined to be in the best interest of the Government 114 to hold discussions, Offeror responses to Evaluation Notices (ENs) and the Final Proposal Revision (FPR) 115 will be considered in making the source selection decision. 116 If the Offeror’s proposal has been evaluated as acceptable at the time discussions are closed, any changes 118 or exceptions in the Final Proposal Revision are subject to evaluation and may introduce risk that the 119 Offeror’s proposal be determined unacceptable and ineligible for award. 120

1.4 Correction Potential of Proposals 122

The Government will consider, throughout the evaluation, the "correction potential" of any deficiency. 124 The judgment of such "correction potential," and whether the Offerors are offered the opportunity to 125 modify their proposal, is within the sole discretion of the Government. By correction potential the 126 Government means it will be evaluating each deficiency for the ability for the deficiency to be remedied 127 and the time requirement necessary to complete that remedial action. This determination will be inherent 128 to each subfactor evaluation and will not specifically be recorded unless the Government deems it 129 necessary. If an aspect of an Offeror’s proposal does not meet the Government’s requirements and is not 130 considered correctable, the Offeror may be eliminated from the competitive range. 131

1.5 Rejection of Unrealistic or Unreasonable Offers 133

The Government may reject any proposal that is evaluated to be unrealistic/unreasonable in terms of 135 program commitments, including contract terms and conditions, or unreasonably high or unrealistically 136 low in cost, such that the proposal is determined to reflect an inherent lack of competence or failure to 137 comprehend the complexity and risks of the program. 138

1.6 Responsibility 140

No award shall be made unless the Contracting Officer makes an affirmative determination of 142 responsibility. To be determined responsible, an Offeror shall meet the general standards described in 143 FAR 9.104-1, have an acceptable Organizational Conflict of Interest (OCI) Plan and professional 144 employee compensation plan. The Contracting Officer may request Offerors to provide additional 145 information to make a responsibility determination. 146

1.6.1 Organizational Conflict of Interest (OCI) 148

The Government will review the Offeror’s OCI Plan along with a completed OCI Mitigation Plan 150 Checklist to ensure compliance with AFFARS 5352.209-9000 ALT II, III, & VI (Oct 2010) for areas of 151 potential conflicts. As discussed in Section L, the resolution of OCI issues are treated as part of the 152 Contracting Officer's contractor responsibility determination. An Offeror’s actual or potential OCI 153 concerns must be avoided, mitigated, or neutralized before that Offeror may receive an award. 154

6 | P a g e

1.6.2 Professional Employee Compensation Plan 158

The Professional Employee Compensation Plan submitted in response to the solicitation will be evaluated 160 in accordance with FAR clause 52.222-46. The Compensation Plan will be relied upon as one of the 161 elements in determining if an Offeror is responsible and subsequently Factor in to the determination of 162 eligibility for award. 163

1.6.3 Pre-Award Survey 165

The Government may conduct a pre-award survey as part of this source selection. Pre-award survey 167 results, if conducted, will be evaluated to determine each Offeror's capability to meet the requirements of 168 the solicitation. 169 The Offeror shall be responsive to DCMA requests for all pre-award surveys (e.g., including financial 171 capability) as required by FAR 9.104-1(a). 172

M002 EVALUATION FACTORS 174

2.1 Evaluation Factors and Subfactors 176

A contract will be awarded to the Offeror proposing a solution evaluated, based on the evaluation Factors 178 and Subfactors, to represent the best value to the Government. The following Factors and Subfactors will 179 be used to evaluate each proposal: 180

7 | P a g e

Bl ue

Pu rp le

Gr ee n Ye llo w

Re d

O ut st an di ng

Go od

Ac ce pt ab le M ar gi na l

Un ac ce pt ab le le

Gr ee n Ye llo w

Re d

O ut st an di ng

Go od

Ac ce pt ab le M ar gi na l

Un ac ce pt ab le le

Gr ee n Ye llo w

Re d

O ut st an di ng

Go od

Ac ce pt ab le M ar gi na l

Un ac ce pt ab le le

Gr ee n Ye llo w

Re d

O ut st an di ng

Go od

Ac ce pt ab le M ar gi na l

Un ac ce pt ab le le

Gr ee n Ye llo w

Re d

O ut st an di ng

Go od

Ac ce pt ab le M ar gi na l

Un ac ce pt ab le

Su m m ar iz e an y pr es en ce o f u nb al en ce d pr ic in g

Fa ct or

Co st /P ric e

Fa ct or

Sm al l

Bu si ne ss

Pa rt ic ip at io n

Ac ce pt ab le /U na cc ep ta bl e

Go ve rn m en t's

M os t P ro ba bl e Co st (M

PC

) A dj us tm en t To ta l E va lu at ed

P ric e (T

EP

Re as on ab le Re al is m (C os t C

LI

N s O nl

y) Un ba la nc ed

P ric in g

Y/

N /T

BD

/ N

/A Su m m ar iz e th e M

PC

A dj us tm en ts

Sa tis fa ct or y

Co nf id en ce N eu tr al C on fid en ce

Li m ite d

Co nf id en ce N o Co nf id en ce

Fa ct or

: P as t Pe rf or m an ce

To ta l P ro po se d Pr ic e

(T

PP

Su bf ac to r:

1.

La un ch

E xp er tis e El em en t 3 Te ch ni ca l/

Ri sk

R at in g

Su bf ac to r:

1.

La un ch

E xp er tis e El em en t 4 Te ch ni ca l/

Ri sk

R at in g

Pe rf or m an ce

C on fid en ce A ss es sm en t Su bs ta nt ia l C on fid en ce

Su bf ac to r:

1.

La un ch

E xp er tis e El em en t 1 Te ch ni ca l/

Ri sk

R at in g

Te ch ni ca l/ Ri sk R at in g Su bf ac to r 1

.1 : S ta ff in g

Ap pr oa ch

Fa ct or

Te ch ni ca l

Su bf ac to r:

1.

La un ch

E xp er tis e El em en t 2 Te ch ni ca l/

Ri sk

R at in g

8 | P a g e

2.2 Relative Importance 184

Offerors that are rated acceptable under Factor 4 Small Business Participation will then be considered for 186 the tradeoff analysis as described immediately below. 187 Relative importance of each Factor and Subfactor are as follows: 189

• Factor 1, Technical, is the most important factor and is significantly more important than Factor 190 2, Past Performance. 191 o Within the Technical Factor, Subfactor 1.1 is more important than 1.2. 192 Within Technical Subfactor 1.2, Element 1 more important than Element 2. 193

Elements 1 and 2 are significantly more important than Elements 3 and 4. 194 Element 3 is more important than Element 4. 195

• Factor 2, Past Performance, is more important than the Factor 3, Cost/Price. 196

• Factor 3, Cost/Price is the least important of all Factors. 197

• Factor 1 is the most important evaluation factor. Factor 2 and Factor 3, when combined are less 198 important than Factor 1. 199

2.3 Factor 1: Technical 201

The technical evaluation will not result in an overall composite Technical/Risk rating for Factor 1, 203 Technical. There will be five separate Technical/Risk ratings for Factor 1, Technical (one rating for 204 Subfactor 1.1 and four ratings for each of the elements in Subfactor 1.2). The Government will consider 205 strengths Offerors note in their proposals and the Government will also consider aspects of the Offeror’s 206 technical proposal that may be advantageous to the Government as strengths. The Government intends to 207 incorporate all evaluated strengths into the resulting contract, regardless of whether the Government has 208 conducted discussions on any or all strengths. These strengths can include performance or capability 209 exceedances above mandatory threshold (minimum) requirements. 210 Technical Factor: The term “Technical” as used herein and throughout the document, refers to non-cost 212 Factors and Subfactors other than Past Performance and Small Business Participation. 213

2.3.1 Technical/Risk Rating Evaluation 215

The combined Technical/Risk Rating depicts how well the Offeror’s proposal meets the Government’s 217 Technical requirements within each Subfactor or element and the risk of unsuccessful performance. Each 218 Technical Subfactor will receive one of the ratings described in the DoD Source Selection Procedures, 219 dated March 31, 2016, and listed in Table 1 – Combined Technical/Risk Rating Method. 220 The combined Technical/Risk Rating includes consideration of risk in conjunction with the strengths, 222 weaknesses, significant weaknesses, and deficiencies in the Offeror’s proposal. 223 http://www.acq.osd.mil/dpap/policy/policyvault/USA007183-10-DPAP.pdf

9 | P a g e

Table 1. Combined Technical/Risk Ratings 232

Table 2. Risk Definitions Rating Description Low Has little potential to cause disruption of schedule, increased cost or degradation of performance. Normal contractor effort and normal Government monitoring will likely be able to overcome any difficulties.

Moderate Can potentially cause disruption of schedule, increased cost or degradation of performance. Special contractor emphasis and close Government monitoring will likely be able to overcome difficulties.

High Is likely to cause significant disruption of schedule, increased cost or degradation of performance. Is unlikely to overcome any difficulties, even with special contractor emphasis and close Government monitoring.

10 | P a g e

Table 3: Relevant Definitions Strength Strength is an aspect of an Offeror's proposal that has merit or exceeds specified performance or capability requirements in a way that will be advantageous to the Government during contract performance. See DoD Source Selection Procedures.

Weakness Weakness means a flaw in the proposal that increases the risk of unsuccessful contract performance. See FAR 15.001.

Significant Weakness

Significant Weakness in the proposal is a flaw that appreciably increases the risk of unsuccessful contract performance. See

FAR 15.001.

Deficiency Deficiency is a material failure of a proposal to meet a Government requirement or a combination of significant weaknesses in a proposal that increases the risk of unsuccessful contract performance to an unacceptable level. See FAR 15.001.

2.3.2 Technical Subfactor 1.1 – Staffing Approach 245

The Government will evaluate the extent to which the Offeror demonstrates an understanding of the 247 manning requirements and staffs appropriately. This Subfactor will be evaluated using Table 1. Strengths 248 may be assigned to the cumulative (or specific) additional (relevant) education, experience, certifications, 249 or any other area that demonstrates benefit to the Government. The Government will attach the successful 250 Offeror’s staffing matrix, or future Government approved updates to the staffing matrix, to the contract as 251 Attachment 8. 252 If the Offeror’s proposed staffing matrix does not propose minimum staffing levels, qualifications, 254 certifications, and expertise listed in the Government estimate (attachment L-3 to ITO) for identified Key 255 Personnel (Column F) or Minimum staffing level (column G) the Government will consider the proposal 256 unacceptable and may not be considered for further evaluation. 257 The Government will allow Offerors to propose up to a maximum of 10 developmental positions, meaning 259 zero years of experience (e.g. new college graduates), within LAAFB. These developmental positions 260 shall be spread across position IDs starting with LEA, LEM, LEF, LEG, and LEE for any level I and level 261 II labor categories. The Offeror should uniquely identify these 10 developmental positions in their 262 proposal, so the Government can exclude them from the risk analysis. These developmental positions are 263 for the waiver of the experience requirements only. All other requirements (e.g. security requirements, 264 education) are still enforced. 265 The Government will evaluate the Offeror’s staffing approach to minimize the risk to performance 267 during transition and normal operations. Specifically, the Government will evaluate the Offeror’s 268 proposed staffing matrix and strategic initiatives as described in the staffing plan to retain proposed 269 workforce. 270

2.3.3 Technical Subfactor 1.2 – Launch Expertise 272

2.3.3.1 Element 1 - Risk Identification and Mitigation for Launch Systems 274

11 | P a g e

The Government will evaluate the Offeror’s approach to risk identification and mitigation during NSSL’s 276 transition to new launch systems, for its soundness and comprehensiveness. 277 For purposes of this evaluation element: 279 The Government defines “soundness” as the degree to which it evidences realistic and experience-based 281 methodology. 282 The Government defines “comprehensiveness” as the degree to which it evidences understanding of risk 284 management process in support of the NSSL program, and demonstrate ability to identify executable 285 mitigation strategies to reduce impacts of risks to NSSL program. 286

2.3.3.2 Element 2 - Launch Enterprise Process/Products for Launch Systems Engineering and 288 Integration 289 The Government will evaluate the Offeror’s approach to analyzing and facilitating the system engineering 291 functions of the entire Government Launch Enterprise for its soundness and comprehensiveness. 292 For purposes of this evaluation element: 294 The Government defines “soundness” as the degree to which it evidences realistic and experience-based 296 methodology. 297 The Government defines “comprehensiveness” as the degree to which it evidences understanding of 299 systems engineering/integration process for the Launch Enterprise (a system of systems), including all 300 tech processes and tech management processes. 301

2.3.3.3 Element 3 - Government and Launch Service Provider Interaction/Integration 303 The Government will evaluate the Offeror’s approach to facilitate the interaction of process and data 305 between Launch Service Provider and Government Mission Assurance architecture/framework, for its 306 soundness and comprehensiveness. 307 For purposes of this evaluation element: 309 The Government defines “soundness” as the degree to which it evidences realistic and experience-based 311 methodology. 312 The Government defines “comprehensiveness” as the degree to which it evidences timelines and 314 descriptions of procedures, processes, plans and rationale. 315

2.3.3.4 Element 4 - Quality & Risk Assessment 317

The Government will evaluate the Offeror’s approach for its soundness and comprehensiveness in 319 analyzing, assessing, utilizing, and reporting to Government NSSL Launch Service Providers’ (LSP) 320 Quality Management Systems (QMS) and risk management systems in support of Independent 321 Government Mission Assurance (as defined in PWS Appendix B). 322

12 | P a g e

For purposes of this evaluation element: 324 The Government defines “soundness” as the degree to which it evidences realistic and experience-based 326 methodology. 327 The Government defines “comprehensiveness” as the degree to which it evidences timelines and 329 descriptions of procedures, processes , plans and rationale for all the subject matters requested in the 330 ITO, specifically: launch/landing site(s) ground systems/infrastructure, launch vehicle lifecycles, 331 launch/space vehicle integration, and processes/tools for analyzing/assessing/utilizing LSP QMS and 332 risk management programs. 333

2.4 Factor 2: Past Performance 335

The Past Performance evaluation results in an assessment of the Offeror’s probability of meeting the 337 solicitation requirements. The Past Performance evaluation considers each Offeror’s demonstrated recent 338 and relevant record of performance in supplying services that meet the contract’s requirements. In 339 accordance with FAR 15.305(a)(2), the currency and relevance of the information, source of the 340 information, context of the data, and general trends in the Offeror’s performance shall be considered. 341 These are combined to establish one performance confidence assessment rating for each Offeror. 342

2.4.1 Ratings. The Past Performance Factor will receive one of the performance confidence assessment 344 described in DoD Source Selection Procedures, Performance Confidence Assessments Rating Method, 345 excerpted below in Table 5. 346

349 TABLE 5- PERFORMANCE CONFIDENCE ASSESSMENTS RATING METHOD

Adjectival Rating Description

SUBSTANTIAL

CONFIDENCE

Based on the Offeror’s recent/relevant performance record, the Government has a high expectation that the Offeror will successfully perform the required effort.

SATISFACTORY

CONFIDENCE

Based on the Offeror’s recent/relevant performance record, the Government has a reasonable expectation that the Offeror will successfully perform the required effort.

NEUTRAL CONFIDENCE

No recent/relevant performance record is available or the Offeror’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned. The Offeror may not be evaluated favorably or unfavorably on the Factor of Past Performance.

LIMITED CONFIDENCE

Based on the Offeror’s recent/relevant performance record, the Government has a low expectation that the Offeror will successfully perform the required effort.

NO CONFIDENCE

Based on the Offeror’s recent/relevant performance record, the Government has no expectation that the Offeror will be able to successfully perform the required effort..

13 | P a g e

2.4.2. Evaluation Process. The Past Performance evaluation considers each Offeror’s demonstrated 350 recent and relevant performance record and the quality of this performance as described below. 351 Performance confidence is assessed at the overall Past Performance Factor level after evaluating aspects 352 of the Offeror’s recent past performance, focusing on performance that is relevant to the Technical 353 Subfactors and Cost/Price Factor taking into consideration their relative order of importance stated in 354 M002 2.2. In conducting the Past Performance evaluation, the Government reserves the right to use 355 both the information provided in the Offeror’s Past Performance proposal volume and information 356 obtained from other sources available to the Government, to include, but not limited to, the Past 357 Performance Information Retrieval System (PPIRS), Federal Awardee Performance and Integrity 358 Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), or other databases; 359 the Defense Contract Management Agency (DCMA), and interviews with Program Managers, 360 Contracting Officers, and Fee Determining Officials. 361

2.4.2.1 Recency. An evaluation of the past performance information will be made to determine if 363 it is recent. To be recent, the effort must be ongoing or must have been performed during 364 the past five years from the date of issuance of this solicitation. Past performance 365 information that fails this condition will not be evaluated further. 366

2.4.2.2 Relevance. The Government will conduct an evaluation of all recent performance 368 information obtained to determine whether the services performed under those contract 369 citations relate to the Performance-based Work Statement specifically regarding the 370 following: 371

1. Experience involving NSSL Launches, or Experience involving Launch Vehicles used in 373

NSSL launches or similar category with other federal agencies such as NASA, NOAA, 374 NSA etc. 375

2. Experience involving Launch Vehicles used in NSSL launches or similar category with 376 commercial launches, or Experience involving Launch Vehicles used in orbital launches 377 other than those described in 1, above. 378

3. Experience involving ballistic missile launches, Launch Process and Operations 379 Experience, Mission Integration Experience, Experience involving Ground Systems, 380 Experience involving other than launch vehicle Propulsion systems comparable to launch 381 propulsion. 382

A relevancy determination of the Offeror’s past performance will be made based upon the 384 aforementioned considerations, including joint venture partner(s) and major and critical 385 subcontractor(s). In determining the relevancy of effort performed under individual past performance 386 citations, the Government will only consider the specific effort or portion consistent with that proposed 387 by the prime, subcontractor, or teaming partner. The past performance information forms and 388 information obtained from other sources will be used to establish the relevancy of past performance. 389 The Government will use the following relevancy definitions when assessing recent, relevant contracts. 391

14 | P a g e

TABLE 6 PAST PERFORMANCE RELEVANCY RATING 394

Adjectival Rating Description

Very Relevant Performing in areas on missions listed in section 2.4.2.2 (1) that involved essentially the same scope, magnitude, and complexity as this solicitation requires

Relevant Performing in areas on missions listed in section 2.4.2.2 (2) that involved essentially the same scope, magnitude, and complexity as this solicitation requires

Somewhat Relevant Performing in areas on missions listed in section 2.4.2.2 (3) that involved essentially the same scope, magnitude, and complexity as this solicitation requires

Not Relevant Performing in areas on missions not listed in section 2.4.2.2 or missions do not involved essentially the same scope, magnitude, and complexity as this solicitation requires

2.4.2.3 Quality of Services. The Government will consider information from customers on how 397 well the Offeror performed on past contract citations. For each recent, relevant past 398 performance citation reviewed, the quality of the services provided and the work performed 399 in relation to the PWS requirement will be assessed. Pursuant to FAR 15.304(c)(3)(ii) and 400 DFARS 215.305(a)(2), the past performance assessment will also consider the extent to 401 which the Offeror’s evaluated past performance demonstrates compliance with FAR 402 52.219-8, Utilization of Small Business Concerns and/or FAR 52.219-9, Small Business 403 Subcontracting Plan. 404 The quality of services performance assessment may result in positive or adverse findings. 406 Adverse is defined as past performance information that supports a less than satisfactory 407 rating on any evaluation element or any unfavorable comment received from sources 408 without a formal rating system. For adverse information identified, the evaluation will 409 consider the number and severity of the problem(s), mitigating circumstances, and the 410 effectiveness of corrective actions that have resulted in sustained improvements. Process 411 changes will only be considered when objectively measurable improvements in 412 performance have been demonstrated. 413 The Government will use the following Past Performance quality ratings when assessing 415 that quality component of Past Performance. 416

15 | P a g e

Table 7 Past Performance Quality Ratings

Rating Description Exceptional The Contractor’s performance meets contractual requirements and exceeds many to the Government’s benefit.

OR

The Contractor’s performance was accomplished with few minor problems for which corrective action taken by the contractor were highly effective.

Very Good The Contractor’s performance meets contractual requirements and exceeds some to the Government’s benefit.

OR

The Contractual performance was accomplished with some minor problems for which corrective actions taken by the Contractor were effective.

Satisfactory The Contractor’s performance meets contractual requirements.

OR

The Contractual performance contained some minor problems for which corrective actions taken by the Contractor appear or were satisfactory.

Marginal Performance does not meet some contractual requirements.

OR

The contractual performance reflects a serious problem for which the contractor has not yet identified corrective actions or the Contractor’s proposed actions appear only marginally effective or were not fully implemented.

Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner.

OR

The contractual performance contains serious problems for which the contractor corrective actions appear or were ineffective.

N/A Not Applicable - unable to provide a score

(3) Assigning Performance Confidence Assessment Rating. The Past Performance confidence 420 assessment rating is based on the Offeror’s overall record of recency, relevance and quality of services 421 assessments. Offerors will receive an integrated Performance Confidence Assessment rating at the Factor 422 level (see Table 5 above). Although the Past Performance evaluation focuses on performance that is 423 relevant to the Performance Work Statement, the resulting performance confidence assessment rating is 424 made at the Factor level and represents an overall evaluation of Offeror’s performance. Offerors without 425 a record of recent/relevant past performance or for whom information on past performance is so sparse 426 that no meaningful confidence assessment rating can be reasonably assigned will not be evaluated 427 favorably or unfavorably on Past Performance and, as a result, will receive a "Neutral Confidence" rating 428 for the Past Performance Factor. 429 More recent or relevant performance will have a greater impact on the Performance Confidence 431 Assessment rating than less recent effort. A strong record of relevant past performance may be considered 432 more advantageous to the Government than a "Neutral Confidence" rating. Likewise, a more relevant 433 past performance record may receive a higher confidence rating and be considered more favorably than a 434 less relevant record of favorable performance. 435

16 | P a g e

2.5 Factor 3: Cost/Price 438

2.5.1 Price Evaluation. 440

The Offeror’s Total Proposed Price (TPP) will be evaluated for reasonableness, realism, and unbalanced 442 pricing. In the evaluation, the Government may use data external to the Offeror’s proposal in accordance 443 with FAR 15.404-1. For all Contract Line Item Number (CLIN) types, the evaluation of options will not 444 obligate the Government to exercise such options. The Government-calculated Total Evaluated Price 445 (TEP) will be presented to the Source Selection Authority for the best value tradeoff decision. 446

2.5.2 Total Evaluated Price 448

The Government will calculate a TEP as shown below: 450 Table 8 Total Evaluated Price 452

CLIN Title Contract Type Cost $

Proposed Fixed Fee (NTE 3%) or Performance

Incentive (NTE 7%) $

Total CLIN Amount

(A) (B) (C) (D) (E) (D + E )

0100 LAAFB (Procurement Funds) CPFF Gov’t MPC Proposed Fixed Fee $ (D + E)

0101 CCAFS/45th SW (Procurement Funds) CPFF Gov’t MPC Proposed Fixed Fee $ (D + E)

0102 CCAFS/45th SW (O&M Funds) CPFF Gov’t MPC Proposed Fixed Fee $ (D + E)

0103 VAFB/ 30th SW (Procurement Funds) CPFF Gov’t MPC Proposed Fixed Fee $ (D + E)

0104 VAFB/ 30th SW (O&M Funds) CPFF Gov’t MPC Proposed Fixed Fee $ (D + E)

0105 LAAFB (RDT&E Funds) CPFF Gov’t MPC Proposed Fixed Fee $ (D + E)

0106 Other Direct Costs CR $500,000 N/A $500,000

0107 Data NSP N/A N/A N/A

0108 Performance Incentive (Attachment 4) FFP N/A Proposed Incentive $ (E)

0200 LAAFB (Procurement Funds) CPFF Gov’t MPC Proposed Fixed Fee $ (D + E)

0201 CCAFS/45th SW (Procurement Funds) CPFF Gov’t MPC Proposed Fixed Fee $ (D + E)

0202 CCAFS/45th SW (O&M Funds) CPFF Gov’t MPC Proposed Fixed Fee $ (D + E)

0203 VAFB/ 30th SW (Procurement Funds) CPFF Gov’t MPC Proposed Fixed Fee $ (D + E)

0204 VAFB/ 30th SW (O&M Funds) CPFF Gov’t MPC Proposed Fixed Fee $ (D + E)

17 | P a g e

0205 LAAFB (RDT&E Funds) CPFF Gov’t MPC Proposed Fixed Fee $ (D + E)

0206 Other Direct Costs CR $500,000 N/A $500,000

0207 Data NSP N/A N/A N/A

0208 Performance Incentive (Attachment 4) FFP N/A Proposed Incentive $ (E)

0300 LAAFB (Procurement Funds) CPFF Gov’t MPC Proposed Fixed Fee $ (D + E)

0301 CCAFS/45th SW (Procurement Funds) CPFF Gov’t MPC Proposed Fixed Fee $ (D + E)

0302 CCAFS/45th SW (O&M Funds) CPFF Gov’t MPC Proposed Fixed Fee $ (D + E)

0303 VAFB/ 30th SW (Procurement Funds) CPFF Gov’t MPC Proposed Fixed Fee $ (D + E)

0304 VAFB/ 30th SW (O&M Funds) CPFF Gov’t MPC Proposed Fixed Fee $ (D + E)

0305 LAAFB (RDT&E Funds) CPFF Gov’t MPC Proposed Fixed Fee $ (D + E)

0306 Other Direct Costs CR $500,000 N/A $500,000

0307 Data NSP N/A N/A N/A

0308 Performance Incentive (Attachment 4) FFP N/A Proposed Incentive $ (E)

0400 LAAFB (Procurement Funds) CPFF Gov’t MPC Proposed Fixed Fee $ (D + E)

0401 CCAFS/45th SW (Procurement Funds) CPFF Gov’t MPC Proposed Fixed Fee $ (D + E)

0402 CCAFS/45th SW (O&M Funds) CPFF Gov’t MPC Proposed Fixed Fee $ (D + E)

0403 VAFB/ 30th SW (Procurement Funds) CPFF Gov’t MPC Proposed Fixed Fee $ (D + E)

0404 VAFB/ 30th SW (O&M Funds) CPFF Gov’t MPC Proposed Fixed Fee $ (D + E)

0405 LAAFB (RDT&E Funds) CPFF Gov’t MPC Proposed Fixed Fee $ (D + E)

0406 Other Direct Costs CR $500,000 N/A $500,000

0407 Data NSP N/A N/A N/A

0408 Performance Incentive (Attachment 4) FFP N/A Proposed Incentive $ (E)

0500 LAAFB (Procurement Funds) CPFF Gov’t MPC Proposed Fixed Fee $ (D + E)

0501 CCAFS/45th SW (Procurement Funds) CPFF Gov’t MPC Proposed Fixed Fee $ (D + E)

0502 CCAFS/45th SW (O&M Funds) CPFF Gov’t MPC Proposed Fixed Fee $ (D + E)

18 | P a g e

0503 VAFB/ 30th SW (Procurement Funds) CPFF Gov’t MPC Proposed Fixed Fee $ (D + E)

0504 VAFB/ 30th SW (O&M Funds) CPFF Gov’t MPC Proposed Fixed Fee $ (D + E)

0505 LAAFB (RDT&E Funds) CPFF Gov’t MPC Proposed Fixed Fee $ (D + E)

0506 Other Direct Costs CR $500,000 N/A $500,000

0507 Data NSP N/A N/A N/A

0508 Performance Incentive (Attachment 4) FFP N/A Proposed Incentive $ (E)

0600 LAAFB (Procurement Funds) CPFF Gov’t MPC Proposed Fixed Fee $ (D + E)

0601 CCAFS/45th SW (Procurement Funds) CPFF Gov’t MPC Proposed Fixed Fee $ (D + E)

0602 CCAFS/45th SW (O&M Funds) CPFF Gov’t MPC Proposed Fixed Fee $ (D + E)

0603 VAFB/ 30th SW (Procurement Funds) CPFF Gov’t MPC Proposed Fixed Fee $ (D + E)

0604 VAFB/ 30th SW (O&M Funds) CPFF Gov’t MPC Proposed Fixed Fee $ (D + E)

0605 LAAFB (RDT&E Funds) CPFF Gov’t MPC Proposed Fixed Fee $ (D + E)

0606 Other Direct Costs CR $500,000 N/A $500,000

0607 Data NSP N/A N/A N/A

0608 Performance Incentive (Attachment 4) FFP N/A Proposed Incentive $ (E)

0700 LAAFB (Procurement Funds) CPFF Gov’t MPC Proposed Fixed Fee $ (D + E)

0701 CCAFS/45th SW (Procurement Funds) CPFF Gov’t MPC Proposed Fixed Fee $ (D + E)

0702 CCAFS/45th SW (O&M Funds) CPFF Gov’t MPC Proposed Fixed Fee $ (D + E)

0703 VAFB/ 30th SW (Procurement Funds) CPFF Gov’t MPC Proposed Fixed Fee $ (D + E)

0704 VAFB/ 30th SW (O&M Funds) CPFF Gov’t MPC Proposed Fixed Fee $ (D + E)

0705 LAAFB (RDT&E Funds) CPFF Gov’t MPC Proposed Fixed Fee $ (D + E)

0706 Other Direct Costs CR $500,000 N/A $500,000

0707 Data NSP N/A N/A N/A

0708 Performance Incentive (Attachment 4) FFP N/A Proposed Incentive $ (E)

19 | P a g e

0800 LAAFB (Procurement Funds) CPFF Gov’t MPC Proposed Fixed Fee $ (D + E)

0801 CCAFS/45th SW (Procurement Funds) CPFF Gov’t MPC Proposed Fixed Fee $ (D + E)

0802 CCAFS/45th SW (O&M Funds) CPFF Gov’t MPC Proposed Fixed Fee $ (D + E)

0803 VAFB/ 30th SW (Procurement Funds) CPFF Gov’t MPC Proposed Fixed Fee $ (D + E)

0804 VAFB/ 30th SW (O&M Funds) CPFF Gov’t MPC Proposed Fixed Fee $ (D + E)

0805 LAAFB (RDT&E Funds) CPFF Gov’t MPC Proposed Fixed Fee $ (D + E)

0806 Other Direct Costs CR $500,000 N/A $500,000

0807 Data NSP N/A N/A N/A

0808 Performance Incentive (Attachment 4) FFP N/A Proposed Incentive $ (E)

0900 LAAFB (Procurement Funds) CPFF Gov’t MPC Proposed Fixed Fee $ (D + E)

0901 CCAFS/45th SW (Procurement Funds) CPFF Gov’t MPC Proposed Fixed Fee $ (D + E)

0902 CCAFS/45th SW (O&M Funds) CPFF Gov’t MPC Proposed Fixed Fee $ (D + E)

0903 VAFB/ 30th SW (Procurement Funds) CPFF Gov’t MPC Proposed Fixed Fee $ (D + E)

0904 VAFB/ 30th SW (O&M Funds) CPFF Gov’t MPC Proposed Fixed Fee $ (D + E)

0905 LAAFB (RDT&E Funds) CPFF Gov’t MPC Proposed Fixed Fee $ (D + E)

0906 Other Direct Costs CR $500,000 N/A $500,000

0907 Data NSP N/A N/A N/A

0908 Performance Incentive (Attachment 4) FFP N/A Proposed Incentive $ (E)

1000 LAAFB (Procurement Funds) CPFF Gov’t MPC Proposed Fixed Fee $ (D + E)

1001 CCAFS/45th SW (Procurement Funds) CPFF Gov’t MPC Proposed Fixed Fee $ (D + E)

1002 CCAFS/45th SW (O&M Funds) CPFF Gov’t MPC Proposed Fixed Fee $ (D + E)

1003 VAFB/ 30th SW (Procurement Funds) CPFF Gov’t MPC Proposed Fixed Fee $ (D + E)

1004 VAFB/ 30th SW (O&M Funds) CPFF Gov’t MPC Proposed Fixed Fee $ (D + E)

1005 LAAFB (RDT&E Funds) CPFF Gov’t MPC Proposed Fixed Fee $ (D + E)

20 | P a g e

1006 Other Direct Costs CR $500,000 N/A $500,000

1007 Data NSP N/A N/A N/A

1008 Performance Incentive (Attachment 4) FFP N/A Proposed Incentive $ (E)

1100 LAAFB (Procurement Funds) CPFF Gov’t MPC Proposed Fixed Fee $ (D + E)

1101 CCAFS/45th SW (Procurement Funds) CPFF Gov’t MPC Proposed Fixed Fee $ (D + E)

1102 CCAFS/45th SW (O&M Funds) CPFF Gov’t MPC Proposed Fixed Fee $ (D + E)

1103 VAFB/ 30th SW (Procurement Funds) CPFF Gov’t MPC Proposed Fixed Fee $ (D + E)

1104 VAFB/ 30th SW (O&M Funds) CPFF Gov’t MPC Proposed Fixed Fee $ (D + E)

1105 LAAFB (RDT&E Funds) CPFF Gov’t MPC Proposed Fixed Fee $ (D + E)

1106 Other Direct Costs CR $250,000 N/A $250,000

1107 Data NSP N/A N/A N/A

1108 Performance Incentive (Attachment 4) FFP N/A Proposed Incentive $ (E)

TEP Summation of above totals

2.5.2.1 Fixed Fee and Performance Incentive 455

The total fixed fee shall not exceed 3% of the total estimated cost excluding the cost of money for all 457 CPFF CLINs. In addition to the fixed fee, no more than 7% of the total estimated cost (excluding cost of 458 money) of all CPFF CLINs shall be used to create the objective performance incentive pool (OPIP) 459 outlined in Section J, Attachment 4 of the model contract. The OPIP is captured in the Model Contract 460 CLIN Series XX08. 461

2.5.3 Evaluation Area Details 463

The proposal must contain sufficient details for the Government evaluation of the following areas: 465

2.5.3.1 Reasonableness 467

The Offeror’s proposal will be assessed for reasonableness, where reasonableness will be an assessment 469 of whether the price is too high. In conducting the reasonableness analysis, the Government will use one 470 or more analysis techniques described in FAR 15.404-1. A determination of unreasonableness will render 471 the proposal unawardable. In addition, proposals that have been assessed to be technically unacceptable 472 are ineligible for award, and as a result, a reasonableness determination will not be made for technically 473 unacceptable, unawardable proposals. 474

21 | P a g e

2.5.3.2 Realism 475

Cost realism analysis is the process of independently reviewing and evaluating specific elements of each 477 Offeror’s proposed cost estimate to determine whether the estimated proposed cost elements are realistic 478 for the work to be performed; reflect a clear understanding of the requirements; and are consistent with 479 the unique methods of performance and materials described in the Offeror’s technical proposal. (FAR 480 15.404-1(d)(1)). The Offeror’s proposal will be assessed for cost realism; cost realism analysis shall be 481 performed on cost-reimbursement CLINs to determine the probable cost of performance for each Offeror. 482 (FAR 15.404-1(d)(2). 483 The Offeror’s proposed costs as provided in the Cost/Price Volume will be evaluated via a cost analysis 485 approach. This process involves the Government’s review and evaluation of specific cost elements of 486 the Offeror’s cost/price. Any proposed cost element may be adjusted based upon the Government 487 analysis of each proposed cost element. The cost analysis will consider the Offeror’s proposed approach. 488 Cost adjustments will consider weaknesses in the technical proposal that impact the costs. Cost 489 adjustments will also consider missing costs that will likely be incurred for the contract with the proposed 490 solution. Cost adjustments will consider any Offeror-initiated unsubstantiated decrements to historical 491 hours/costs. The cost adjustments will result in the Government’s Most Probable Cost (MPC) that will 492 be incorporated into the TEP calculation for best value consideration. The realism assessment will focus 493 on whether the proposed price is too low. Therefore, all cost adjustments will be upward; there will not 494 be any downward adjustments. 495 No MPC adjustment will be made for deficiencies; however, deficiencies may render your proposal 497 unrealistic. The Offeror’s proposal must be clear and convincing in demonstrating that the costs in the 498 Offeror’s proposal are realistic for the work to be performed; reflect a clear understanding of the 499 requirements; and are consistent with the Offeror’s technical proposal (FAR 15.404-1(d)). Over-500 proposing of unwanted tasks and associated costs will NOT result in a probable cost adjustment but may 501 result in an unreasonableness determination. An offer may be rejected if the Contracting Officer 502 determines that the lack of realism poses an unacceptable risk to the Government. 503

2.5.3.3 Unbalanced Pricing (Applies to all contract line items) 505 The Offeror’s proposal will be assessed for the presence of unbalanced pricing IAW FAR 15.404-1(g). 506 Unbalanced pricing exists when, despite an acceptable total evaluated price, the price of one or more 507 contract line items is significantly over or understated as indicated by the application of cost or price 508 analysis techniques. An offer may be rejected if the Contracting Officer determines that the lack of 509 balance poses an unacceptable risk to the Government. 510

2.5.3.6 Total Proposed Price (TPP) 512

The Offeror’s proposal will be assessed for accuracy in calculating the proposed Total Proposed Price 513 (TPP) and for compliance with the instructions for calculating the proposed Total Proposed Price. 514

2.5.3.5 Total Evaluated Price (TEP) 516

The Government will adjust the TPP to incorporate the Government’s Most Probable Cost (developed 517 under paragraph 2.5.2) resulting in the Government-calculated TEP. The TEP will be used by the Source 518 Selection Authority in the best value decision process. 519

22 | P a g e

2.5.3.6 521 Insufficient details to support the determination of reasonableness, realism, or non-presence of unbalanced 522 pricing, initially or subsequently, may be a consideration for excluding the Offeror’s proposal from the 523 competitive range and further consideration for award. The burden of proof rests with the Offeror. 524

2.5.3.7 526 Data in Volume VI (Model Contract) will be compared to the CLIN amounts and Rate Schedules in the 527 Cost/Price Volume to ensure that the prices in the Cost/Price Volume flow to the CLINs in a consistent 528 and accurate manner. If there is an inconsistency, the values in the Model Contract will take precedent 529 and be used in the TEP calculation. 530

2.5 Factor 4: Small Business Participation 532

The Offeror demonstrates a small business participation percentage of 25% or more in the Small Business 534 Percentage Calculation spreadsheet as part of Section J Attachment 11 Small Business Participation 535 Commitment Document. This Subfactor will be rated on an acceptable or unacceptable scale as described 536 below in Table 4. 537

Table 4 Small Business Rating Method Acceptable Proposal indicates an adequate approach and understanding of small business objectives.

Unacceptable Proposal does not meet small business objectives.

Small Business objectives are defined as: (1) Submission of an acceptable small business subcontracting 540 plan, if required; (2) Submission of a Small Business Participation Commitment Document that 541 proposes at least 25% based on total contract value; and (3) Submission of evidence of enforceable 542 commitments that cover the entirety of the required 25% or more small business participation. 543

M001 SOURCE SELECTION
1.1 Basis for Contract Award
1.2 Competitive Range
1.3 Discussions
1.4 Correction Potential of Proposals
1.5 Rejection of Unrealistic or Unreasonable Offers
1.6 Responsibility
1.6.1 Organizational Conflict of Interest (OCI)
1.6.2 Professional Employee Compensation Plan
1.6.3 Pre-Award Survey
M002 EVALUATION FACTORS
2.1 Evaluation Factors and Subfactors
2.2 Relative Importance
2.3 Factor 1: Technical
2.3.1 Technical/Risk Rating Evaluation
2.3.2 Technical Subfactor 1.1 – Staffing Approach
2.3.3 Technical Subfactor 1.2 – Launch Expertise
2.4 Factor 2: Past Performance
2.5 Factor 3: Cost/Price
2.5.1 Price Evaluation.
2.5.2 Total Evaluated Price
2.5.2.1 Fixed Fee and Performance Incentive
2.5.3 Evaluation Area Details
2.5.3.1 Reasonableness
2.5.3.2 Realism
2.5.3.3 Unbalanced Pricing (Applies to all contract line items)
2.5.3.6 Total Proposed Price (TPP)
2.5.3.5 Total Evaluated Price (TEP)
2.5.3.6
2.5.3.7

2.5 Factor 4: Small Business Participation

File details come from the government source that posted it. Updated .