MAAS RFP_Questions and Answers_02.pdf

PDF 132 KB Posted

Attached to
Mobile Aircraft Arresting System (MAAS) Federal contract opportunity
Solicitation number
FA8534-23-R-0001
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Robins Air Force Base

View the file

Other files for this federal contract opportunity

Other files attached to Mobile Aircraft Arresting System (MAAS), newest first.
File Type Posted
MAAS RFP_Questions and Answers_08.pdf PDF
FA8534-23-R-0001-0007.pdf PDF
Section M_Evaluation Factors for Award_Rev 02.pdf PDF
FAR 52.204-27, Prohibition on ByteDance Covered Application.pdf PDF
MAAS RFP_Questions and Answers_07.pdf PDF
Economic Price Adjustment (EPA) Determination_Rev 01.pdf PDF
Section L_Instructions Conditions and Notices to Offerors_Rev 02.pdf PDF
FA8534-23-R-0001-0006.pdf PDF
MAAS RFP_Questions and Answers_06.pdf PDF
MFR_Notice to Offerors.pdf PDF
FA8534-23-R-0001-0005.pdf PDF
MIL-W-38461C.pdf PDF
MAAS RFP_Questions and Answers_05.pdf PDF
68C37215 Nylon Tape.pdf PDF
FA8534-23-R-0001-0004.pdf PDF
FA8534-23-R-0001-0003.pdf PDF
MAAS RFP_Questions and Answers_03.pdf PDF
USAF Approved Test Matrix for All AAS at NAVAIR.pdf PDF
FA8534-23-R-0001-0002.pdf PDF
Section L_Instructions Conditions and Notices to Offerors_Rev1.pdf PDF
FA8534-23-R-0001-0001.pdf PDF
Request for Proposal (RFP) FA8534-23-R-0001.pdf PDF
RFP Attach 01_Cross Reference Matrix.pdf PDF
RFP Attach 03_Government Furnished Property.pdf PDF
Economic Price Adjustment (EPA) Determination.pdf PDF
AFMC FORM 158 - Packaging.pdf PDF
AFMC IMT 260 - First Article Requirements.pdf PDF
CDRLs_A001-A015.pdf PDF
Technical Manual - Overhaul Maintenance_IPB_BAK-12_E32A.pdf PDF
Technical Manual - Illustrated Parts Breakdown (IPB)_BAK-12_E32A.pdf PDF
Technical Manual - Illustrated Parts Breakdown (IPB)_MAAS.pdf PDF
IPPS_Attach 02_Data Product Selection Sheet_Logistics Product Data.pdf PDF
RFP Attach 02_MAAS Price Matrix.xlsx XLSX spreadsheet
Section L_Instructions Conditions and Notices to Offerors.pdf PDF
CDRLs_B001-B003.pdf PDF
MIL-STD-3036.pdf PDF
Technical Manual - Overhaul Instructions_MAAS.pdf PDF
Initial Provisioning Performance Specification (IPPS).pdf PDF
MAAS Statement of Work (SOW).pdf PDF
Section M_Evaluation Factors for Award.pdf PDF
CDRLs_C001-C003.pdf PDF
CDRLs_D001-D003.pdf PDF
CDRLs_E001-E003.pdf PDF
Technical Manual - Operation_Maintenance Instructions_BAK-12.pdf PDF
Technical Manual Contract Requirements (TMCR).pdf PDF
IPPS_Attach 01_Provisioning Performance Schedule.pdf PDF
IPPS_Attach 03_Provisioning Technical Documentation (PTD).pdf PDF
DD FORM 1653 - Transportation.pdf PDF
MIL-STD-3035.pdf PDF
Technical Manual - Operation_Maintenance Instructions_MAAS.pdf PDF
Show all 50

Mobile Aircraft Arresting System (MAAS) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE AIR FORCE

AIR FORCE LIFE CYCLE MANAGEMENT CENTER

ROBINS AIR FORCE BASE GEORGIA

MOBILE AIRCRAFT ARRESTING SYSTEM (MAAS)

REQUEST FOR PROPOSAL (RFP) FA8534-23-R-0001

QUESTIONS & ANSWERS

14 FEBRUARY 2023

Q1. In the RFP Part II contract clauses Section I 52.209-4(g) (pg. 28) it states, “ The contractor is responsible for providing operating and maintenance instructions, spare parts support, and repair of the first article during any first article test.”

Will T.O. 35E8-2-10-1 and 35E8-2-5-1 be used as the operations and maintenance instructions or does the contractor need to provide something separate?

A1. T.O. 35E8-2-10-1 and 35E8-2-5-1 can be used, unless the instructions to operate the system built are different, but they should not be. The contractor is responsible to provide spare parts support and repair of the first article unit.

Q2. Pendants and purchase tape will need replaced throughout the first article testing.

They are considered consumable items and not spare parts or hazardous materials.

Who will be responsible for providing the required amount of purchase tapes and pendants consumed during the testing?

A2. Pendants and purchase tapes will be provided by NAVAIR for testing.

Q3. SOW Section 3.5.1.2 states, “The contractor shall also supply all hazardous materials to be used in and/or consumed during the test.”

It also been stated that driving in the main gate with a POV at Lakehurst with hazardous material may cause problems.

A3. The only “hazardous material” to be used in and/or consumed during testing would be fuel for the rewind engine, hydraulic fluid and/or engine oil.

Q4. Please provide clarification as to what will happen with the first article test unit:

In the RFP Part II Contract Clauses Section I 52.209-4 (e) (Page 28) it states “Unless otherwise provided in the contract, the Contractor may deliver the approved first article as a part of the contract quantity, provided it meets all contract requirements for acceptance and was not consumed or destroyed in testing.”

In SOW Section 3.5.5 Disposition states, “The approved first article MAAS shall be retained at the contractor's facility, to serve as a manufacturing standard, until the last shipment.”

In AFMC IMT 260 Block 5 states, “The first article quantity will be part of production quantity.” Block 6 states, “Article will not serve as a manufacturing standard.” Block 10 states disposition as, “Approved first articles will be forwarded to purchasing unit.”

A4. The first article unit will be refurbished and used as a production unit, but can be retained at the contractor’s facility to serve as the standard and remain until the last shipment if needed.

Q5. The RFP states “Warranty Required.” No warranty duration is listed.

What is the expected warranty?

A5. At a minimum we would expect a 12-month warranty from delivery date.

1BDEPARTMENT OF THE AIR FORCE
0BAIR FORCE LIFE CYCLE MANAGEMENT CENTER
2BROBINS AIR FORCE BASE GEORGIA

File details come from the government source that posted it. Updated .