F-15AtomizerTestInstruction.pdf.pdf

PDF 166 KB Posted

Attached to
Universal Fuel Control Test Stand Federal contract opportunity
Solicitation number
FA8224-15-R-0013
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

Attachment AY -- F-15AtomizerTestInstruction.pdf

View the file

Other files for this federal contract opportunity

Other files attached to Universal Fuel Control Test Stand, newest first.
File Type Posted
Section_M_Fuels_28_January_2016.pdf PDF
Section_L_Fuels_28_January_2016.pdf PDF
Dec3PS.pdf PDF
Amendment_0007.doc DOC document
FA8224-15-R-0013_0002.pdf PDF
F-15FuelControl_TestInstruction.pdf.pdf PDF
Universal_Test_Stand.doc DOC document
Questions_and_Answers_24_July_2015.pdf PDF
Bldg252Pictures.pdf PDF
B252_fp2008.pdf PDF
Bldg252_TestingAreaDrawing.PDF PDF
C-17FlowDivider_TestInstruction.pdf.pdf PDF
Purchase_Specification.pdf PDF
A-10AtomizerTestInstruction.pdf.pdf PDF
A007_DI_ATTS_80282B 1 .pdf PDF
F-16AtomizerTestInstruction.pdf.pdf PDF
C-130Atomizer75076TestInstruction.pdf.pdf PDF
F-15FuelFilter_TestInstruction.pdf.pdf PDF
C-130FuelControl-8__TestInstruction.pdf.pdf PDF
A006_DI_QCIC_80798B 1 .pdf PDF
C-130FuelControl-9__TestInstruction.pdf.pdf PDF
C-130_FuelControl-101__TestInstruction.pdf.pdf PDF
A012_DI_ADMN_81250A 1 .pdf PDF
F-16FuelControl_TestInstruction.pdf.pdf PDF
E-3_TestInstruction.pdf.pdf PDF
C-5FlowDivider_TestInstruction.pdf.pdf PDF
METCAL_TM_86_01N 1 .pdf PDF
A003_CDRL_TMCR 1 .pdf PDF
A008_DI_ATTS_80283B 1 .pdf PDF
F-16FuelPump_TestInstruction.pdf.pdf PDF
A004_DI-SESS-8100DT 1 .pdf PDF
FA8224-15-R-0013.pdf PDF
C-5AtomizerTestInstruction.pdf.pdf PDF
C-17IGV_TestInstruction.pdf.pdf PDF
A-10_FuelControl__TestInstruction.pdf.pdf PDF
A010_FED_STD_313D 1 .pdf PDF
A013_DIMGMT-81580 1 .pdf PDF
KC-135TestInstruction.pdf.pdf PDF
C-130Atomizer3601193TestInstruction.pdf.pdf PDF
A009_AFMETACL_TM-86-01 1 .pdf PDF
KC-135AtomizerTestInstruction.pdf.pdf PDF
C-130_FuelControl-1__TestInstruction.pdf.pdf PDF
C-17FuelAccessories_TestInstruction.pdf.pdf PDF
C-17FuelControl_TestInstruction.pdf.pdf PDF
A011_DI_ADMN_81249A 1 .pdf PDF
Robins_TM-86-01N 1 .pdf PDF
F-22TestInstruction_pdf.pdf PDF
C-130Atomizer899981TestInstruction.pdf.pdf PDF
A001_DI_MISC_8145B 1 .pdf PDF
FED-STD-313D 1 .pdf PDF
Show all 50

Universal Fuel Control Test Stand has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

00-MAN-2014-03205

8. ASSEMBLY.

8.1 Fuel Atomizer Assembly. Assemble fuel

atomizer assembly as follows:

a. Install fuel check valve (Figure 2, 5) with packings (6 and 7) into body assembly (8).

Torque fuel check valve 65 to 70 inch-pounds.

b. Install key washer (4) with tang positioned in slot in body assembly (8), then install nozzle assembly (3). Torque nozzle assembly (3) 70 to 80 inch-pounds.

c. Bend tab of key washer (4) to secure nozzle assembly (3).

9. TESTING

Bench test nozzle assembly (Figure 2) and fuel check valve (5) as follows:

9.1 Preparation for Testing. Prepare for testing

as follows:

a. Install test fixture X9298697-10 onto test stand 164101-100.

b. Install fuel atomizer assembly into test fixture X9298697-10. The test stand shall use filtered MIL-C-7024 Type II Calibration fluid provided at 80 ± 5°F.

c. If testing a newly assembled nozzle, apply fuel pressure up to the highest pressure value on Table 3 for given part number atomizer assembly until fluid flows from nozzle. If no flow is achieved at highest pressure, replace check valve (5).

9.2 Leak Check. Perform leak check as follows:

a. Operate test equipment at pressures specified for given atomizer assembly and check valve part numbers in Table 2.

b. Apply fluid leak test pressure in accordance with Table 2 for atomizer assembly and check valve part numbers being tested. Maintain pressure for required time in Table 2. No leakage allowed.

c. If valve leaks, replace packings (Figure 2, 6 and 7 – continued) and retest. If leakage is still observed, reject fuel check valve (5).

9.3 Crack Pressure Test. Perform crack pressure

check as follows:

a. After leak check slowly increase pressure insuring the check valve cracks at the pressure specified in Table 2 for the corresponding check valve part number.

b. Increase the pressure past the crack pressure to the check flow pressure in Table 2 for the corresponding check valve part number and ensure the minimum flow is met.

c. If the crack pressure or minimum flow fails to meet the specifications in Table 2, reject the check valve.

9.4 Spray Angle and Flow Test. Perform spray

angle and flow test as follows

a. Apply fluid inlet pressures according to Table 3 for the atomizer assembly part number being tested. At each inlet pressure check that the flow rate and spray angle requirements in Table 3 are met.

b. Observe the spray pattern at each inlet pressure. Spray pattern shall be finely divided droplets in the form of a fully developed cone. Patterns A, B, and C (Figure 5) represent acceptable patterns.

Bubbling or back flowing on the face of the nozzle assembly tip (pattern D) and discontinuities (patterns E and F) are not acceptable.

c. Angle of spray shall be measured at a radius of 1 inch from the apex of the developed spray cone. The developed spray cone shall be concentric with the centerline of the nozzle as specified in Figure 6.

Table 2. Leak and Check Valve Test Values

Note: Make sure not to overshoot pressure values. If a pressure value in a column is overshot, decrease pressure back down to the previous column and proceed.

Atomizer Assembly

P/N 364986

Nozzle P/N

364932

Check Valve P/N

367638

Leak Test Pressure

(psig) +1/-0

Leak Test Duration

(min)

Crack Pressure

(psig)

-10/-15 -2 -1 7.5 1 9.5-10.5 -12/-14 -3 -2 63 1 69.0-71.0

-16 -2 -3 25 1 28.5-31.5 -24/-25 -2 -4 10.1 1 12.5-13.5

Table 3. Flow and Spray Angle Test Values

Atomizer Assembly

P/N 364986

Nozzle P/N 364932

Check Valve P/N 367638

Fluid Pressure (psig) ±2

Flow Rate (pph)

Spray Angle (deg)

-10/-15 -2 -1 40.5 4 min --

55.0 8.3 max 40 min

100.0 8.1-9.0 70 ± 5

320.0 14.5-16.2 85 max

-12/-14 -3 -2 87.1 4 min --

115.0 10.8 max 40 min

160.0 10.8-12.8 70 ± 5

380.0 19.4-21.6 85 max

-16 -2 -3 60.8 4 min --

75.0 8.3 max 40 min

100.0 7.1-8.0 70 ± 5

320.0 14.0-15.7 85 max

-24/-25 -2 -4 43.5 4.0 min --

58.0 8.3 max 40 min

100.0 8.0-8.9 70 ± 5

320.0 14.4-16.1 90 max

10. FINAL ASSEMBLY AND PACKING

10.1 Final Assembly. Final Assembly of fuel

atomizer assembly shall proceed as follows:

a. Install packing (2) and shroud (1) to fuel atomizer assembly body (8).

10.2 Packing. Package fuel atomizer assembly as

follows:

a. If fuel atomizer assembly is to be installed in JFS within 60 days, no oil dip is required, simply place unit in a plastic bag.

b. If fuel atomizer assembly is destined for storage in excess of 60 days, dip fuel atomizer assembly in clean lubricating oil, Specification MIL-L-6081, Grade 1010.

c. Drain and place unit in a plastic bag.