Bldg252Pictures.pdf

PDF 269 KB Posted

Attached to
Universal Fuel Control Test Stand
Solicitation number
FA8224-15-R-0013
Issued by

About this file

Pictures

View the file

Other files

File Type Posted
Section_M_Fuels_28_January_2016.pdf PDF
pd24E87.doc DOC document
Section_L_Fuels_28_January_2016.pdf PDF
Dec3PS.pdf PDF
Amendment_0007.doc DOC document
FA8224-15-R-0013_0002.pdf PDF
F-15FuelControl_TestInstruction.pdf.pdf PDF
Questions_and_Answers__10_Aug_2015.pdf PDF
Universal_Test_Stand.doc DOC document
B252_fp2008.pdf PDF
Questions_and_Answers_24_July_2015.pdf PDF
Bldg252_TestingAreaDrawing.PDF PDF
C-5AtomizerTestInstruction.pdf.pdf PDF
FA8224-15-R-0013.pdf PDF
C-17IGV_TestInstruction.pdf.pdf PDF
KC-135AtomizerTestInstruction.pdf.pdf PDF
C-130_FuelControl-1__TestInstruction.pdf.pdf PDF
C-17FlowDivider_TestInstruction.pdf.pdf PDF
Purchase_Specification.pdf PDF
A-10AtomizerTestInstruction.pdf.pdf PDF
A007_DI_ATTS_80282B 1 .pdf PDF
C-17FuelAccessories_TestInstruction.pdf.pdf PDF
C-5FlowDivider_TestInstruction.pdf.pdf PDF
METCAL_TM_86_01N 1 .pdf PDF
Robins_TM-86-01N 1 .pdf PDF
C-17FuelControl_TestInstruction.pdf.pdf PDF
F-22TestInstruction_pdf.pdf PDF
A011_DI_ADMN_81249A 1 .pdf PDF
F-16AtomizerTestInstruction.pdf.pdf PDF
C-130Atomizer75076TestInstruction.pdf.pdf PDF
F-15FuelFilter_TestInstruction.pdf.pdf PDF
C-130FuelControl-8__TestInstruction.pdf.pdf PDF
A006_DI_QCIC_80798B 1 .pdf PDF
A012_DI_ADMN_81250A 1 .pdf PDF
C-130_FuelControl-101__TestInstruction.pdf.pdf PDF
C-130FuelControl-9__TestInstruction.pdf.pdf PDF
C-130Atomizer899981TestInstruction.pdf.pdf PDF
A003_CDRL_TMCR 1 .pdf PDF
F-16FuelPump_TestInstruction.pdf.pdf PDF
A008_DI_ATTS_80283B 1 .pdf PDF
A004_DI-SESS-8100DT 1 .pdf PDF
A001_DI_MISC_8145B 1 .pdf PDF
FED-STD-313D 1 .pdf PDF
A002_DI_IPSC_81488 1 .pdf PDF
A014_DIMGMT-81842 1 .pdf PDF
F-16FuelControl_TestInstruction.pdf.pdf PDF
E-3_TestInstruction.pdf.pdf PDF
C-5FuelControl_TestInstruction.pdf PDF
A005_DI_QCIC_80278B 1 .pdf PDF
A009_AFMETACL_TM-86-01 1 .pdf PDF
Show 40 more

Latest 50 of 56 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Door into testing area. 70 inches wide by 95 inches high. This is the only way to get the test stands in and out.

Test stand#4 left. #3 is on the right (See drawing for numbers).

See drawing for reference to Central Workstation Location. The Gray locker in the picture and the roller will move to create the space for the Central Workstation.

Test Stand #5 (Atomizer Stand) is in the center. The bins on the left are where the current test kits are stored.

Test stand #1 (far right) and test stand #2 middle right.

File details come from the government source that posted it. Updated .