Questions_and_Answers_24_July_2015.pdf

PDF 92 KB Posted

Attached to
Universal Fuel Control Test Stand Federal contract opportunity
Solicitation number
FA8224-15-R-0013
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

View the file

Other files for this federal contract opportunity

Other files attached to Universal Fuel Control Test Stand, newest first.
File Type Posted
Section_L_Fuels_28_January_2016.pdf PDF
Section_M_Fuels_28_January_2016.pdf PDF
pd24E87.doc DOC document
Amendment_0007.doc DOC document
Dec3PS.pdf PDF
FA8224-15-R-0013_0002.pdf PDF
F-15FuelControl_TestInstruction.pdf.pdf PDF
Questions_and_Answers__10_Aug_2015.pdf PDF
Universal_Test_Stand.doc DOC document
Bldg252Pictures.pdf PDF
B252_fp2008.pdf PDF
Bldg252_TestingAreaDrawing.PDF PDF
F-15AtomizerTestInstruction.pdf.pdf PDF
A-10_FuelControl__TestInstruction.pdf.pdf PDF
A010_FED_STD_313D 1 .pdf PDF
A013_DIMGMT-81580 1 .pdf PDF
KC-135TestInstruction.pdf.pdf PDF
C-130Atomizer3601193TestInstruction.pdf.pdf PDF
A009_AFMETACL_TM-86-01 1 .pdf PDF
KC-135AtomizerTestInstruction.pdf.pdf PDF
C-5FlowDivider_TestInstruction.pdf.pdf PDF
METCAL_TM_86_01N 1 .pdf PDF
A003_CDRL_TMCR 1 .pdf PDF
A008_DI_ATTS_80283B 1 .pdf PDF
F-16FuelPump_TestInstruction.pdf.pdf PDF
A004_DI-SESS-8100DT 1 .pdf PDF
FA8224-15-R-0013.pdf PDF
C-5AtomizerTestInstruction.pdf.pdf PDF
C-17IGV_TestInstruction.pdf.pdf PDF
C-130_FuelControl-1__TestInstruction.pdf.pdf PDF
C-17FuelAccessories_TestInstruction.pdf.pdf PDF
C-17FuelControl_TestInstruction.pdf.pdf PDF
A011_DI_ADMN_81249A 1 .pdf PDF
Robins_TM-86-01N 1 .pdf PDF
F-22TestInstruction_pdf.pdf PDF
C-130Atomizer899981TestInstruction.pdf.pdf PDF
A001_DI_MISC_8145B 1 .pdf PDF
FED-STD-313D 1 .pdf PDF
A014_DIMGMT-81842 1 .pdf PDF
A002_DI_IPSC_81488 1 .pdf PDF
C-5FuelControl_TestInstruction.pdf PDF
A005_DI_QCIC_80278B 1 .pdf PDF
C-17FlowDivider_TestInstruction.pdf.pdf PDF
Purchase_Specification.pdf PDF
A-10AtomizerTestInstruction.pdf.pdf PDF
A007_DI_ATTS_80282B 1 .pdf PDF
F-16AtomizerTestInstruction.pdf.pdf PDF
C-130Atomizer75076TestInstruction.pdf.pdf PDF
F-15FuelFilter_TestInstruction.pdf.pdf PDF
C-130FuelControl-8__TestInstruction.pdf.pdf PDF
Show all 50

Universal Fuel Control Test Stand has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers Posted 24 July 2015

1. Are floor plans available that illustrate the current location of the existing chiller and existing test stands?

See attachments "B252 fp2008.pdf" and "Bldg252 TestingAreaDrawing.PDF".

2. Are floor plans available that show desired location of new equipment, including central workstation?

See attachment "Bldg252 TestingAreaDrawing.PDF".

3. Are dimensions and weights of the existing chiller and test stands available? These are needed to obtain quotes from a local vendor for removal.

See "Bldg252 TestingAreaDrawing.PDF". Test stands # 1-4 have base dimensions of 45" deep by 97" wide as seen in the drawing. They are 84" high excluding all piping, blowers, etc. attached to top of stands. The 15"x33" sink on test stand #1 and the 21"x33" sinks on test stands # 2-4 are removable. Test stand # 5 is 48" Deep and 84" wide as shown in drawing. Its 78" high excluding all connections made to the top of the stand. The door on the left side of the floorplan in "Bldg252 TestingAreaDrawing.PDF" is 70" wide and 95" high. See "Bldg252Pictures.pdf". All test stands and equipment must be moved in and out through this doorway.

The chiller is located outside the building (See "B252 fp2008.pdf"). The manufacturer claims a weight of 1100 lbs. The dimensions are 42" wide by 68" deep by 76" tall. The weights of test stands #1-5 are unknown.

Test stands #1-4 have an estimated weight of 5000 lbs and test stand #5 has an estimated weight of 3000 lbs.

4. PS 3.1.2 "Storage containers shall be supplied to store hookup kits" - can you provide more details on container expectations/requirements?

We didn't put much clarifying information on the purchase specification so it is open For the contractor to fulfill the requirement as they see best. The attached pictures In "Bldg252Pictures.pdf" show the current arrangement which is cheaply done.

File details come from the government source that posted it. Updated .