C-5FlowDivider_TestInstruction.pdf.pdf

PDF 150 KB Posted

Attached to
Universal Fuel Control Test Stand Federal contract opportunity
Solicitation number
FA8224-15-R-0013
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

Attachment AL -- C-5FlowDividerTestInstruction.pdf

View the file

Other files for this federal contract opportunity

Other files attached to Universal Fuel Control Test Stand, newest first.
File Type Posted
Section_L_Fuels_28_January_2016.pdf PDF
pd24E87.doc DOC document
Section_M_Fuels_28_January_2016.pdf PDF
Amendment_0007.doc DOC document
Dec3PS.pdf PDF
F-15FuelControl_TestInstruction.pdf.pdf PDF
Questions_and_Answers__10_Aug_2015.pdf PDF
FA8224-15-R-0013_0002.pdf PDF
Universal_Test_Stand.doc DOC document
Bldg252Pictures.pdf PDF
B252_fp2008.pdf PDF
Bldg252_TestingAreaDrawing.PDF PDF
Questions_and_Answers_24_July_2015.pdf PDF
F-15AtomizerTestInstruction.pdf.pdf PDF
A-10_FuelControl__TestInstruction.pdf.pdf PDF
A010_FED_STD_313D 1 .pdf PDF
A013_DIMGMT-81580 1 .pdf PDF
KC-135TestInstruction.pdf.pdf PDF
C-130Atomizer3601193TestInstruction.pdf.pdf PDF
A009_AFMETACL_TM-86-01 1 .pdf PDF
KC-135AtomizerTestInstruction.pdf.pdf PDF
C-130_FuelControl-1__TestInstruction.pdf.pdf PDF
C-17FuelAccessories_TestInstruction.pdf.pdf PDF
C-17FuelControl_TestInstruction.pdf.pdf PDF
A011_DI_ADMN_81249A 1 .pdf PDF
Robins_TM-86-01N 1 .pdf PDF
F-22TestInstruction_pdf.pdf PDF
C-130Atomizer899981TestInstruction.pdf.pdf PDF
A001_DI_MISC_8145B 1 .pdf PDF
FED-STD-313D 1 .pdf PDF
A014_DIMGMT-81842 1 .pdf PDF
A002_DI_IPSC_81488 1 .pdf PDF
C-5FuelControl_TestInstruction.pdf PDF
A005_DI_QCIC_80278B 1 .pdf PDF
METCAL_TM_86_01N 1 .pdf PDF
A003_CDRL_TMCR 1 .pdf PDF
A008_DI_ATTS_80283B 1 .pdf PDF
F-16FuelPump_TestInstruction.pdf.pdf PDF
A004_DI-SESS-8100DT 1 .pdf PDF
FA8224-15-R-0013.pdf PDF
C-5AtomizerTestInstruction.pdf.pdf PDF
C-17IGV_TestInstruction.pdf.pdf PDF
C-17FlowDivider_TestInstruction.pdf.pdf PDF
Purchase_Specification.pdf PDF
A-10AtomizerTestInstruction.pdf.pdf PDF
A007_DI_ATTS_80282B 1 .pdf PDF
F-16AtomizerTestInstruction.pdf.pdf PDF
C-130Atomizer75076TestInstruction.pdf.pdf PDF
F-15FuelFilter_TestInstruction.pdf.pdf PDF
C-130FuelControl-8__TestInstruction.pdf.pdf PDF
Show all 50

Universal Fuel Control Test Stand has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

8. TEST.

Record all values in Table 2 as each test is performed.

8.1 Setup.

a. Install fuel flow divider valve assembly as shown in Figure 6 using 281600-7-1 Test Stand. Note the following:

(1) Valve #1 is a three position valve and

Valve #2 is a two position valve.

(2) Restrictor P/N 282917-8 or P/N 287539-8 may be used. Restrictor has an orifice diameter of 0.0280-inch with a flow of 47 to 53 pph at 100 ±1 psid.

(3) Use minimum 1/4'” hose on all lines in

Figure 6.

(4) The test stand return shall be an open return at ambient pressure for the entire test.

(5) Install assembled plug (6) including packing in one of the Primary Outlet ports (3).

8.2 Primary Outlet Flow Test.

a. Position Valve #1 to point towards the line without restrictor 282917-8 (or 287539-8).

b. Close Valve #2.

c. Apply 30 ±1 psig Fuel Supply pressure to Inlet Port.

d. Flow from Primary Port shall be 41 to 50 pph.

e. Decrease flow to zero.

8.3 Combined Flow Test with Restrictor. (Part No.

394284-6 only)

a. Position Valve #1 towards the line with restrictor 282917-8 (or 287539-8).

b. Disconnect line to Secondary Port.

c. Loosen nut (9) and turn adjustment screw clockwise (4) all the way in.

d. Increase Fuel Supply pressure to a minimum of 100 psig until flow is 58 to 62 pph.

e. Turn adjustment screw (4) counterclockwise until Secondary Port cracks 7 to 12 cc/min.

Replace body assembly if adjustment will not bring flow within limits.

f. Hold adjustment screw (4) and torque nut

(9) to 65 to 70 inch-pounds.

8.4 Leakage Check. (Part No. 394284-6 only)

a. Decrease Fuel Supply pressure until flow is

50 to 54 pph.

b. Leakage from Secondary Outlet Port shall not exceed 2 cc per minute.

c. If leakage exceeds 2 cc per minute, replace washer (Figure 2, 16). If leakage persists, replace bellows and poppet assembly (10).

8.5 Combined Flow Test without Restrictor. (Part

No. 394284-6 only)

a. Reconnect line to Secondary Port.

b. Position Valve #1 to point towards the line without restrictor 282917-8 (or 287539-8).

c. Open Valve #2.

d. Apply 90 ± 2 psig Fuel Supply. Flow shall be 590 pph minimum.

8.6 Post Test.

a. Decrease pressure and shut down 281600-7-

1 Test Stand.

b. Remove assembled plug (6) and lines to fuel flow divider valve assembly.

c. Drain flow divider.

d. Plug all open ports.

e. Safety wire nut (9) using lockwire (13-42).

Table 2

Para.

No. Test

Fuel Supply

Pressure (psig)

Valve #1 Position

Valve #2 Position

Fuel Flow (pph)

Secondary Leakage (cc/min) Pass/Fail

8.2 Primary Outlet Flow

Test

30 ±1

Unrestricted Closed 41 – 50

8.3 Combined Flow Test

with Restrictor

100 min

Restrictor Closed 58 – 62

7 – 12

8.4 Leakage Check

Restrictor Closed 50 – 54

2 max

8.5 Combined Flow Test

without Restrictor

90 ± 2

Unrestricted Open 590 min