LBP Evaluation.pdf

PDF 22 KB Posted

Attached to
Repair Interior/Exterior B-2013, Repair Interior B-2005, Repair Steam Heat System B-2024
Solicitation number
FA8201-11-B-0006
Issued by

About this file

Lead Based Paint Evaluation

View the file

Other files

File Type Posted
15410 - Water Distribution Piping and Equiment-26July2011.pdf PDF
15420 - Drainage and Vent Systems and Equipment-26July2011.pdf PDF
15515 - HVAC-26July2011.pdf PDF
Contractor Questions Answers - 14 July 2011 -FA8201-11-B-0006 - MAMS II Area - Bldgs 2005 20132024.pdf PDF
16010 - General Requirements-26July2011.pdf PDF
Amendment 05 - FA8201-11-B-0006 - Bldgs 2005 2013 2024.pdf PDF
Humidifier Drawings Spec.pdf PDF
B2005-Equipment_Layout.pdf PDF
B2024-Equipment_Layout.pdf PDF
Additonal Project Information.pdf PDF
B2013-Equipment_Layout.pdf PDF
Wage Determination-UT100037- 17 June 2011-UT37.mht MHT file
Amendment of Solicitation - 04.pdf PDF
SECTION 01 11 01 - Revised 29 June 2011.pdf PDF
B2013-Sequencing Plan.pdf PDF
Project Overview 5 July 2011.pdf PDF
SAFETY 01 35 26.pdf PDF
SECTION 01 32 01-Project Schedule.pdf PDF
Amendment 03.pdf PDF
Amendment 02 - SF 30.doc DOC document
Site Visit Attendance Record.pdf PDF
06 61 16 Countertops.pdf PDF
Asbestos Survey.pdf PDF
Bldgs 2024 Pics.zip ZIP file
Building 2013 Pics - Set 5.zip ZIP file
LBP Letter.pdf PDF
Amendment to Solicitation.pdf PDF
Building 2013 Pics - Set 4.zip ZIP file
Additional Specs.pdf PDF
Building 2013 Pics - Set 1.zip ZIP file
Contractor Questions FA8201-11-B-0006 - MAMS II Area - Bldgs 2005 20132024.pdf PDF
Building 2013 Pics - Set 3.zip ZIP file
Fire Alarm-Performance Based Spec.pdf PDF
Wage Determination - UT100037 - 13 May 2011.pdf PDF
Bldg 2005 Pics.zip ZIP file
Building 2013 Pics - Set 2.zip ZIP file
100 Fire Mech Specs Div. 13 15 PDF.zip ZIP file
SECTION 01 11 00.pdf PDF
Visitor Authorization List.pdf PDF
100 Arch Specs PDF.zip ZIP file
Sequencing Plan KRSM062067 Bldg 2013.pdf PDF
SECTION 01 57 20 ENVIRONMENTAL.pdf PDF
100 Electrical Specs Div 16 PDF.zip ZIP file
Drawings KRSM 062067 062069 072070-Complete Set-Locked.pdf PDF
SAFETY 01 35 26.pdf PDF
Solicitation FA8201-11-B-0006.pdf PDF
Wage Determination UT 100037 4 Feb 2011 UT37.pdf PDF
Show all 47

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Building: 2013 Inspector: Neldon Anderson

Date: 25-Feb-08 Insp. Number: PB-1072

Time: 1:16 PM

Work Order: 49980 Niton: XLp300A XRF Analyzer

Serial # 8413

XL Number Room Side Structure Condition Substrate Color PbL(mg/cm2) PbL (+/-)

Pre Calibration Cal. Standard

361 0 < 0.01

362 0.28 0.31 +/- 0.02

363 0.9 1.04 +/- 0.06

364 1.4 1.53 +/- 0.09

365 3.3 3.58 +/- 0.39

366 Support office North Door slab Good Metal Tan 0 NEG

367 Support office North Door jamb Good Metal Tan 9.9 POS

368 Support office West Wall Good Drywall Cream 0 NEG

369 Hallway Northwest Wall Good Block Cream 0.03 NEG

370 MIC South Door slab Good Wood Varnish 0 NEG

371 MIC South Door jamb Good Wood Varnish 0 NEG

372 MIC West Door channel Good Metal Gray 0.02 NEG

373 MIC West Rollup door Good Metal Gray 0.01 NEG

374 MIC South Door slab Good Metal Gray 0 NEG

375 MIC South Door jamb Good Metal Gray 5.8 POS

376 Gear box repair North Wall Good Concrete Blue 0 NEG

377 Gear box repair South Wall Good Drywall White 0 NEG

378 Gear box repair Southwest Structural steel Good Metal Cream 4.2 POS

379 Center hallway Center Door slab Good Metal Tan 0 NEG

380 Center hallway Center Door jamb Good Metal Gray 0 NEG

381 Center hallway Center Chair rail Good Wood Varnish 0.35 NEG

382 Center hallway Center Wall Good Drywall Cream 0.02 NEG

383 Center hallway Center Wall Good Drywall Tan 0 NEG

384 East hallway Center Wall Good Block Tan 0 NEG

File details come from the government source that posted it. Updated .